Informs That Commission 840601 Meeting Concludes Ofc of Secretary Action on COMVG-84-11 Re Plant Low Power Operation
ML20138P977
Person / Time
Site: 05000000, Grand Gulf
Issue date: 06/06/1984
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Gilinsky
NRC COMMISSION (OCM)
Shared Package
ML20136E247 List:
References
FOIA-85-437 COMVG-84-11, NUDOCS 8511140215
Download: ML20138P977 (1)


Text

ga arco 4

'o UNITED STATES i ~ 9. _.,, n.?,/,7, NUCLEAR REGULATORY COMMISSION v[

c e

q,,p;)p{g/, j W ASHIN GTON. O.C. 20553

,9pss 9

-1 ;

June 6, 1984 COMVG-84-ll OFFICE OF THE SECRETARY MEMORANDUM FOR:

Commissioner Gilinsky ;

'l ; f FROM:

Samuel J. Chilk, Sec Q

SUBJECT:

GRAND GULF LOW POWER P RATION The Commission meeting of June 1, 1984 concludes SECY action on COMVG-84-ll.

Attachment:

SRM dtd 6/6/84 on Grand Gulf Commission Mtg cc:

Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal OGC OPE 8511140215 851017 MO PDR FOIA GILINSKB5-437 PDR

__ __.=

i 3/2 i j#,%>,%

UNITED STATES

/ /,,

e NUCLEAR REGULATORY COMMISSION j

9

,, y WASHINGTON, D.C. 20555 k{'45fW I

          • ,o COMVG-84-ll OFFICE OF THE COMMISSIONH May 31, 1984 MEMORANDUM FOR THE COMMISSIONERS

SUBJECT:

GRAND GULF LOW POWER OPERATION i

i I

It is clear from the May 30, 1984, OGC memorandum that the staff's Grand Gulf Order which amended the plant license is illegal insofar as it relaxed the requirements for emergency power.

The Commission must act immediately to rescind that i

element of the Order.

The plant should be shut down until the regulations can be met, the adequacy of the plant license process determined, and the health and safety of the public assured.

To do otherwise would be a countenance flagrant violation of the Commission's regulations.

Let me remind you that.the staff stated in its May 24, 1984, memorandum to the Commission that the plant does not meet i

the requirements of 10 CFR.50 General Design Criterion 17.

Nor do I think it meets the requirements of the several additional GDC's, each of which refers to the availability of emergency power.

GDC-33 Reactor Coolant.Make-up

)

GDC-34 Residual Heat Removal

.GDC-34 Emergency Core Cooling GDC-37 Testing of the Emergency Cor,e Cooling System GDC-38 Containment Heat Removal GDC-41 Containment Atmospheric Cleanup a

GDC-44 Cooling Water Let me also stress that the plant's internal safety review process has been recognized to be inadequate and not in compliance with the regulations.

Nor has.NRC's review been satisfactory.

The Director of Licensing referred to the

' license review process as inadequate.

The NRC approved at least nine Technical Specifications and amendments for

~

non-existent equipment.

Moreover, substantial numbers of documents which underwent safety review by MP&L's mana,gement and which were submitted to.the NRC under oath have been found to be false.

Over 300' Technical Specifications and

-over 5600 pages of the Final Safety Analysis Report have l

e.c h /

sp

/ /_) _- tJ$'I cCL<t9'4-<3

\\

7

i required correction after they were submitted.

The causes l

for the massive management review breakdowns has not yet been determined by tha staff nor so far as I know have

-actions been taken that would prevent recurrence.

l SECY please track responses by c.o.b.

today.

~

s t/

e Victor Gilinsky cc:

SECY OPE OGC t

i e

4 1

4 6

t i

i i

1-

j o rto g $

g UNITED STATES IN RESPONSE, PLEASE 8

NUCLEAR REGULATORY COMMISSION REFER TO:

M840601C o

3 W ASHIN GTON, D.C. 20555 t

19.... p$

June 6, 1984 OFFICE OF THE SECR ETAR Y MEMORANDUM FOR:

William J.

Dircks, Executive Director for Operations

^

)

FROM:

Samuel J.

Chilk, Secret 7

SUBJECT:

STAF? REQUIREMENTS - DI 3CUSSION OF GRAND GULF ORDER, 2:00 P.M.,

PkiDAY, JUNE 1, 1984, COMMISSIONERS ' CONFERENCE ROOM, D.C.

OFFICE (OPEN TO PUBLIC ATTENDANCE)

The Commission met to discuss the Grand Gulf plant currently operating under NRC license condition that restricts operation to low power levels.

The Comm,ission, by a vote of 3-2 (Commissioners Gilinsky and Asselstine dissenting), voted to oppose Commissioner Gilinsky's proposal that NRC not allow the plant to operate until the Commission has acted on an exemption request.

The Commission, by a vote of 3-2 (Commissioners Gilinsky and Asselstine dissenting), voted to oppose Commissioner Asselstine's motion that the Commission rescind the portion of the staff's order that modifies the technical specifications for the plant, the limiting condition for operation.

The Commission directed the staff to proceed as it is and to consider the exemption request when it arrives.

(EDO)

(SECY Suspense:

6/18/84) cc:

Chairman Palladino Commissioner Gilinsky Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commission Staff Offices PDR - Advance DCS - 016 Phillips