UNITED STATES
[
NUCLEAR REGULATORY COMMISslON
[
.d
REGION V
,
O
5
.f
SUITE 202. W ALNUT CREEK PLAZA
'
0
1990 N. CALIFORNIA SOULEVARD
- eee*
WALNUT CREEK. CALIFORNI A 94598
i
l
FEB 101978
'
i
'
Docket Nos. 50-528
50-529
-
50-530
Arizona Public Service Company
P. O. Box 21666
Phoenix, Arizona 85036
l
Attention: Mr. E. E. Van Brunt, Jr.
Vice President, Construction
Projects and ANPP Director
i
Gentlemen:
Subject: NRC Inspection of Palo Verde Units 1, 2 and 3
This refers to the inspection conducted by Messrs. T. W. Bishop and
G. Hernandez of this office on January 16-20, 1978, of activities
authorized by NRC Construction Permit Nos. CPPR-141,142 and 143 and
to the discussion of our findings held by Mr. Bishop with you and-
other members of your staff at the conclusion of the inspection. .
Areas examined during this inspection are described in the enclosed
)
inspection report. Within these areas, the inspection consisted of
'
selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspectors.
,
Based on the results of this inspection, it appears that one of
your activities was not conducted in full compliance with the NRC
requirements, as set forth in the Notice of Violation, enclosed
herewith as Appendix A.
This item of noncompliance has been cate-
gorized into a level as described in our correspondence to all NRC
licensees dated December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office,
within thirty (30) days of your receipt of this notice, a written
'
'
8508150672 850703
LEIGHTOS4-293 PDR
l
. -
-. .
.-
-
._
.
'
-
.
.
-
.
FEB 10 B78
Arizona Public Service Co.
-2-
i
statement or explanation in reply including:
(1)correctivesteps
which have been taken by you and the results achieved; (2) corrective
steps which will be taken to avoid further violations; and (3) the
,
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and.the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you be-
i
lieve to be proprietary, it is necessary that you submit a written
application to this office, within 30 days of the date of this letter,
requesting that such information be withheld from public disclosure.
1
The application must include a full statement of the reasons why it
is claimed that the information is proprietary. The application
should be prepared so that any proprietary information identified is
contained in an enclosure to the application, since the application
,
without the enclosure will also be placed in the Public Document Room.
If we do not hear from you in this regard within the specified period,
the report.will be placed in the Public Document Room.
,
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
1
Sincerely,
hhn
G. S. Spencer, Chief
.
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
IE Inspection Report No. 50-528,
'
529,530/78-01
.
,