I
This refers to the inspection conducted by Messrs. B. R. Crowley and
R. W. Wright of this office on May 15-18, 1978, of activities authorized
by NRC License No. DPR '67 and Construction Permit No. CPPR-144 for the
St. Lucie Units 1 and 2 facilities, and to the discussion of our findings
held with Messrs. C. M. Wethy and B. J. Escue at the conclusion of the
inspection.
i
,
Areas examined during the inspection and our findings are discussed in
'
!
the enclosed inspection report. Within these areas, the inspection
consisted of s'lective examinations of procedures and representative
e
records, interviews with personnel, and observations by the inspectors.
'
One new unresolved item resulted from this inspection and is discussed
in the enclosed report.
This item will be examined during subsequent
inspections.
.
'
.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
These
items and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
,
Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:, (1)
corrective steps which have been taken by you and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
,
,
,
hh 01 g 2 050703
LE10HToo4_yyy
pyg
Fot A -14-213
Lf 12.4
-
,
....p.e+=
.
m e.
y __
w
.
.
,
'o
,.
t
Florida Power and
Light Company
-2-
JUN 15 E?d
.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10. Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.- If this report contains any information that you (or your contractor)
'
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must include a full statement
of the reasons on the basis of which it is claimed that the information
'
as proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
-
,
.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
.
Sincerely,
s
.
C. E. Murphy, Chie
Reactor Construction and Engineering
Support Branch
.
'
'
Enclosures:
1.
Appendix A. Notice of Violation
2 '.
Inspection Report Nos. 50-335/78-13
'
and 50-389/78-6
!
cc w/encli
'
Mr. C. M. Wethy, Plant Manager
.
St. Lucie Plant
P. O. Box 128
Ft. Pierce, Florida 33450
'
Mr. Nat Weems, Assistant QA Manager
P. O. Box 128
Ft. Pierce, Florida 33450
'
,
i
i
..
!
~~
'
-
' % . . .m.
- . . .
_
_