Forwards Insp Rept 50-389/76-02 on 760922-24.No Deviations Noted
ML20134B451
Person / Time
Site: 05000000, Saint Lucie
Issue date: 11/02/1976
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17198A269 List: ... further results
References
FOIA-84-293 NUDOCS 8508150629
Download: ML20134B451 (2)


See also: IR 05000389/1976002

Text

RhCOMMISSI0N

,

  • *i *

3

.

$

230 PEACHTREE STREET, N.^'. SUITE S

'

8

8

ATLANTA, C eor TIA 30303

-

.....,/

~

.

'

NOV

2 1976.

t

1"u wex

.

.

. . .

In Reply Refer To:

"

,

IE:II:DHD-

.

.

g

50-389/76-2

..

.

-

!.

, , ,

,,

,

.

1

.

.

.

i

'

b

'

I

Florida Power and Light Company

-

j

ATTN:

Dr. R. E. Uhrig, Vice President

of Nuclear and General Engineering

e

!

P. O. Box 013100

'

,

9250 West Flagler Street

j

Miami, Florida 33101

-

_

.

.

Gentlemen:

-

i

This refers to the inspection conducted by Mr. D. H. Danielson of this

'

office on Septe5ber 22-24,1976, of activities associate'd with your

i

'

application for an NRC Construction Permit for St. Lucia Plant, Unit 2

I

and to the discussion of our findings held with Mr. B. J. Escue at

j

the conclusion of the inspection.

-

3

.

!

Areas examined during the inspection and our findings are discussed in

1

the enclosed inspection report.

Within these areas, the inspection

.

consisted of selective examination of procedures and representgtive

,

records, interviews with personnel, and observations by the inspector.

i

,

1

Within the scope of this inspection we identified no sign'ificant

deviations from the requirements of 10 CFR 50, Appendix B, " Quality

Assurance Criteria for Nuclear Power Plants," of the NRC regulations.

-

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

'

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office requesting that such information be withheld from public

disclosure.

If no proprietary information is identified, a written

statement to that effect should be submitted.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary.

The application should be prepared so that

i

-

information sougtit to be withheld is incorporated in a separato paper

and referenced in the application since the application will be placed

in the Public Document Room.

Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

-

specified, the enclosed report and this latter may then bo placed in

the Public Document Room.

' Fot A -Uf-M3

'

8500150629 050703

t

I

PDR

FOIA

LEICHT004-293

PDR

'

%g

,

.

, . . . . - . -

.

,

.

4

_ . _ _ . _ . . . . _ . - . _ . -

,.

d

nu'

4 b/5

'

p

..

,

.

.w

.

. ..

.

.

.

.

Florida Power cud Light

..-2-

.

,l

. *

'

'

.

Company

,

-

'

-

-

,

.

  • ' ~

..

I

b

e

.

Should you have any questions concerning this. let'ter, we will beI lad

g

'

to discuss 'them with yo'u.'

' !'

,

'

'

.

.

r

-

-

j

Very truly yours,

'

'

t

.

.

o

C. E. Mu hy, Ch

f

Reactor Construction and Engineering

. Support Branch

._.

Enclosures

.

IE Inspection Report No.

~

50-389/76-2

'

,

,

-

.

.

.

.

.

,

.

.

-

..

,

.

,

,;

.

.

J

.

.

l

.

-

.

.

i

e

',

i

.

.

s

.

.

.

a

t

.

j

e

-

i

1

A

.

l

.

l

-

,

.

3

.

6

I

.

.

-

-

- - -

.

,

.._. _

. . . . .

. . . .

..

__

. . . , _ .