MONTHYEARML20217H6231999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML20217J4331999-10-15015 October 1999 Forwards Insp Rept 50-461/99-19 on 990913-17.One Violation Re Individual Failure to Follow Radiation Protection Procedures When Accessing High Radiation Area Noted & Being Treated as Noncited Violation U-603280, Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p)1999-10-12012 October 1999 Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p) ML20217C0871999-10-11011 October 1999 Forwards Proprietary Attachment Inadvertently Omitted from Encl 2 to Submitting Responses to NRC RAI Re License Transfer Application for Plant.Proprietary Encl Withheld U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included1999-10-0808 October 1999 Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included U-603279, Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld1999-10-0707 October 1999 Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld U-603275, Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station1999-10-0707 October 1999 Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station ML20217A9881999-10-0101 October 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20217A7361999-10-0101 October 1999 Forwards Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Identified,One Re Failure to Place Control Switch in Proper Position to Identify Piece of out-of-svc Equipment & Being Treated as NCVs ML20217J1251999-09-30030 September 1999 Refers to Investigation 3-1997-040 Conducted from 971028- 980921 & Forwards Nov.Investigations Determined That During Jan 1997,supervisor Qv Dept Discriminated Against Qv Inspector in Retaliation for Inspector Contacts with NRC ML20217J1421999-09-30030 September 1999 Refers to Investigation 3-97-040 Conducted from 971028- 980921 & Forwards Nov.Investigation Concluded That Recipient Engaged in Deliberate Misconduct in That Recipient Discriminated Againt Qv Inspector for Having Contacted NRC ML20212G6751999-09-22022 September 1999 Forwards Comment Submitted to NRC by Environ Law & Policy Ctr Re Proposed License Transfer for Clinton Power Station U-603272, Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl1999-09-22022 September 1999 Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl U-603225, Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl1999-09-20020 September 1999 Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl ML20212G6981999-09-20020 September 1999 Requests That NRC Reject Proposed License Transfer for Clinton Power Station & That NRC State That Public Interest in Safe Nuclear Power Industry Will Not Be Subordinated to Interest in Maximizing Profit by Limiting Liability ML20217H3421999-09-17017 September 1999 Forwards Request for Addl Info Re Licensee 990723 Application for License Transfer & Conforming Administrative License Amend.Response Requested within 20 Days of Receipt of Ltr 05000461/LER-1996-010, Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events1999-09-13013 September 1999 Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events 05000461/LER-1999-011, Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments1999-09-10010 September 1999 Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments U-603269, Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed1999-09-10010 September 1999 Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed ML20211Q2671999-09-0808 September 1999 Informs That NRC Tentatively re-scheduled Initial Licensing Exams for License Operator License Applicants During Weeks of June 5 & 12,2000.Validation of Exams Will Occur at Station During Weeks of May 15,2000 U-603229, Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl1999-08-25025 August 1999 Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl U-603243, Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.71999-08-23023 August 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.7 ML20211D2201999-08-23023 August 1999 Confirms 990817 Telcon with J Neuschwanger & D Mcneil Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Plant U-603258, Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage1999-08-23023 August 1999 Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage ML20211B0871999-08-20020 August 1999 Responds to J Hopkins Inquiry Re Application for Order Consenting to License Transfer & Approving Conforming Administrative License Amend Filed by Ilpr & Amergen Energy Co on 990723 U-603259, Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired1999-08-19019 August 1999 Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired ML20211A8931999-08-19019 August 1999 Forwards Insp Rept 50-461/99-13 on 990611-0728.Two Violations Noted & Being Treated as Ncvs.Violation Re Three Examples Where Licensee Procedural Requirements for Minor Maint Work Were Not Followed U-603253, Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 9908131999-08-16016 August 1999 Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 990813 ML20210U3771999-08-12012 August 1999 Forwards Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amend & Opportunity for Hearing Re Amend Request for Approval of Clinton Power Station License NPF-62 Transfer to Amergen U-603250, Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 9907291999-08-10010 August 1999 Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 990729 U-603249, Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 9908091999-08-10010 August 1999 Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 990809 ML20210N2961999-08-0909 August 1999 Forwards Form of Nuclear Decommissioning Master Trust Agreement,Per CPS Application for License Transfer & Conforming Administrative License Amend U-603248, Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR551999-08-0606 August 1999 Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR55 U-603236, Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS1999-08-0202 August 1999 Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS ML20210J0541999-07-30030 July 1999 Forwards Three Original Signature Pages of Gr Rainey for Application for License Transfer & Conforming Administrative License Amend, for NRC Files U-603178, Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS1999-07-29029 July 1999 Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS U-603237, Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 0001311999-07-28028 July 1999 Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 000131 U-603240, Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.711999-07-27027 July 1999 Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.71 U-603235, Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.7901999-07-23023 July 1999 Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.790 ML20210A4401999-07-16016 July 1999 Forwards Insp Rept 50-461/99-10 on 990422-0610.Four Violations Being Treated as Noncited Violations ML20209G7671999-07-12012 July 1999 Ack Receipt of Encl FEMA Correspondence ,which Transmitted FEMA Evaluation Rept for 981118 Biennial EP Exercise at Clinton Power Station.No Deficiencies Were Observed ML20209D5691999-07-0707 July 1999 Forwards Insp Rept 50-461/99-12 on 990607-11.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Observations of Work in Progress & Interviews with Personnel U-603231, Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date1999-07-0707 July 1999 Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date U-603214, Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events1999-07-0606 July 1999 Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events ML20196J9651999-07-0202 July 1999 Confirms Discussion Between Members of Staffs to Conduct Meeting on 990714 at Clinton Power Station to Discuss Results of Restart Insp & Licensee Progress in Addressing Remaining Long Term C/A Actions to Sustain Improvements ML20196J7131999-06-30030 June 1999 Informs of Closure of Response to Requests for Addl Info to GL 92-01,Rev 1,Supplement 1, Reactor Vessel Structural Integrity, for Clinton Power Station Unit 1 U-603218, Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant1999-06-28028 June 1999 Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant U-603212, Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys1999-06-24024 June 1999 Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys U-603227, Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology1999-06-24024 June 1999 Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology ML20196A3471999-06-16016 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-461/99-11 Issued on 990430.Corrective Actions Will Be Examined During Future Inspections 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARU-603280, Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p)1999-10-12012 October 1999 Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p) ML20217C0871999-10-11011 October 1999 Forwards Proprietary Attachment Inadvertently Omitted from Encl 2 to Submitting Responses to NRC RAI Re License Transfer Application for Plant.Proprietary Encl Withheld U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included1999-10-0808 October 1999 Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included U-603279, Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld1999-10-0707 October 1999 Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld U-603275, Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station1999-10-0707 October 1999 Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station U-603272, Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl1999-09-22022 September 1999 Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl U-603225, Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl1999-09-20020 September 1999 Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl ML20212G6981999-09-20020 September 1999 Requests That NRC Reject Proposed License Transfer for Clinton Power Station & That NRC State That Public Interest in Safe Nuclear Power Industry Will Not Be Subordinated to Interest in Maximizing Profit by Limiting Liability 05000461/LER-1996-010, Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events1999-09-13013 September 1999 Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events U-603269, Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed1999-09-10010 September 1999 Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed 05000461/LER-1999-011, Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments1999-09-10010 September 1999 Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments U-603229, Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl1999-08-25025 August 1999 Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl U-603243, Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.71999-08-23023 August 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.7 U-603258, Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage1999-08-23023 August 1999 Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage ML20211B0871999-08-20020 August 1999 Responds to J Hopkins Inquiry Re Application for Order Consenting to License Transfer & Approving Conforming Administrative License Amend Filed by Ilpr & Amergen Energy Co on 990723 U-603259, Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired1999-08-19019 August 1999 Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired U-603253, Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 9908131999-08-16016 August 1999 Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 990813 U-603250, Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 9907291999-08-10010 August 1999 Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 990729 U-603249, Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 9908091999-08-10010 August 1999 Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 990809 ML20210N2961999-08-0909 August 1999 Forwards Form of Nuclear Decommissioning Master Trust Agreement,Per CPS Application for License Transfer & Conforming Administrative License Amend U-603248, Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR551999-08-0606 August 1999 Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR55 U-603236, Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS1999-08-0202 August 1999 Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS ML20210J0541999-07-30030 July 1999 Forwards Three Original Signature Pages of Gr Rainey for Application for License Transfer & Conforming Administrative License Amend, for NRC Files U-603178, Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS1999-07-29029 July 1999 Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS U-603237, Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 0001311999-07-28028 July 1999 Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 000131 U-603240, Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.711999-07-27027 July 1999 Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.71 U-603235, Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.7901999-07-23023 July 1999 Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.790 U-603231, Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date1999-07-0707 July 1999 Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date U-603214, Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events1999-07-0606 July 1999 Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events U-603218, Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant1999-06-28028 June 1999 Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant U-603212, Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys1999-06-24024 June 1999 Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys U-603227, Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology1999-06-24024 June 1999 Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology 05000461/LER-1999-007, Forwards LER 99-007-00,re Design Error Causing Main Steam Isolation Valve Leakage Control Sys to Be Outside Design Basis.Commitment Made by Util,Listed1999-06-12012 June 1999 Forwards LER 99-007-00,re Design Error Causing Main Steam Isolation Valve Leakage Control Sys to Be Outside Design Basis.Commitment Made by Util,Listed 05000461/LER-1999-008, Forwards LER 99-008-00,re Failure of Motor Driven Reactor FW Pump Regulating Valve.Commitment Made by Util,Listed1999-06-12012 June 1999 Forwards LER 99-008-00,re Failure of Motor Driven Reactor FW Pump Regulating Valve.Commitment Made by Util,Listed U-603213, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-461/99-01.Corrective Actions:Calculation 19-AK-05, Calculation for DG Load Monitoring, Was Revised Using Correct Horsepower for Hydrogen Mixing Compressors1999-05-28028 May 1999 Responds to NRC Ltr Re Violations Noted in Insp Rept 50-461/99-01.Corrective Actions:Calculation 19-AK-05, Calculation for DG Load Monitoring, Was Revised Using Correct Horsepower for Hydrogen Mixing Compressors ML20209G7731999-05-27027 May 1999 Forwards Copy of Final Rept for 981118,Biennial Radiological Emergency Preparedness Exercise for Clinton Nuclear Power Station.No Deficiencies Were Noted U-603207, Provides Util Rept Confirming Completion of Actions Required by NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs1999-05-13013 May 1999 Provides Util Rept Confirming Completion of Actions Required by NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs U-603201, Forwards 4-yr Updated Certification Rept for Plant Training Simulator.Nrc Form 474, Simulation Facility Certification Also Encl Which Was Developed in Accordance with Reg Guide 1.149 & Ansi/Ans Std Ansi/Ans 3.51999-05-0505 May 1999 Forwards 4-yr Updated Certification Rept for Plant Training Simulator.Nrc Form 474, Simulation Facility Certification Also Encl Which Was Developed in Accordance with Reg Guide 1.149 & Ansi/Ans Std Ansi/Ans 3.5 U-603196, Provides Notification That Util Has Completed Thermo-Lag 330-1 Fire Barrier Corrective Actions as Described in 970619 & s in Addition to Repair of Butt Joint Described in1999-04-27027 April 1999 Provides Notification That Util Has Completed Thermo-Lag 330-1 Fire Barrier Corrective Actions as Described in 970619 & s in Addition to Repair of Butt Joint Described in U-603205, Forwards Annual Radioactive Effluent Release Rept for Clinton Power Station for Period Jan-Dec 1998. Rev 17 to ODCM for Clinton Power Station, Also Encl1999-04-27027 April 1999 Forwards Annual Radioactive Effluent Release Rept for Clinton Power Station for Period Jan-Dec 1998. Rev 17 to ODCM for Clinton Power Station, Also Encl U-603197, Provides Details of Other Activities Being Taken as Part of CPS Plan for Excellence Re Ensureing That CPS Physical Plant & Functional Characteristics Are Consistent with & Are Being Maintained IAW CPS Design Bases1999-04-24024 April 1999 Provides Details of Other Activities Being Taken as Part of CPS Plan for Excellence Re Ensureing That CPS Physical Plant & Functional Characteristics Are Consistent with & Are Being Maintained IAW CPS Design Bases U-603194, Provides Notification That Ta Staber,License SOP-31298,has Resigned Position,Effective 990401.License Status Should Be Changed to Expired1999-04-15015 April 1999 Provides Notification That Ta Staber,License SOP-31298,has Resigned Position,Effective 990401.License Status Should Be Changed to Expired U-603189, Requests That Status of License SOP-31187-1,for Le Anderson, Be Changed to Expired,Per 10CFR50.74.Util Determined That Individual No Longer Has Need for SRO License1999-04-0505 April 1999 Requests That Status of License SOP-31187-1,for Le Anderson, Be Changed to Expired,Per 10CFR50.74.Util Determined That Individual No Longer Has Need for SRO License U-603190, Provides Update for Certain 10CFR50.74(f) Info Addressed in Licensee 980619 Submittal,But Not Included in Final Response1999-04-0202 April 1999 Provides Update for Certain 10CFR50.74(f) Info Addressed in Licensee 980619 Submittal,But Not Included in Final Response U-603185, Forwards Response to NRC RAI Re CPS GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs, Program1999-03-30030 March 1999 Forwards Response to NRC RAI Re CPS GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs, Program U-603186, Forwards Rept on Status of Clinton Power Station Decommissioning Funding,Iaw 10CFR50.75(f)1999-03-29029 March 1999 Forwards Rept on Status of Clinton Power Station Decommissioning Funding,Iaw 10CFR50.75(f) U-603184, Submits Info Re Current Levels of Property Insurance & Sources of Insurance for CPS as Listed,Per 10CFR50.54(w)(3)1999-03-26026 March 1999 Submits Info Re Current Levels of Property Insurance & Sources of Insurance for CPS as Listed,Per 10CFR50.54(w)(3) 05000461/LER-1999-005, Forwards LER 99-005-00,re Inoperability of Standby Gas Treatment Sys Train a Caused by Inadequate Design of Control Circuit.Commitments Listed1999-03-15015 March 1999 Forwards LER 99-005-00,re Inoperability of Standby Gas Treatment Sys Train a Caused by Inadequate Design of Control Circuit.Commitments Listed U-603165, Forwards Revised Data Point Ref File Sheet for Clinton Power Station Computer Point That Inputs to Erds.Change Necessary to Support Plant Mods to Drywell Floor Drain Instrumentation1999-03-12012 March 1999 Forwards Revised Data Point Ref File Sheet for Clinton Power Station Computer Point That Inputs to Erds.Change Necessary to Support Plant Mods to Drywell Floor Drain Instrumentation U-603179, Provides Notification That RG Giuliani & R Zacholski,No Longer Have Need for Operating License.License Status Is Therefore Requested to Be Changed to Expired1999-03-10010 March 1999 Provides Notification That RG Giuliani & R Zacholski,No Longer Have Need for Operating License.License Status Is Therefore Requested to Be Changed to Expired 1999-09-22
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L6571990-09-19019 September 1990 Advises That Dp Hall No Longer Associated W/Facility Since Dec 1989.Mail Should Be Addressed to Js Perry JSP-739-90, Requests Expedited Review & Approval of Proposed Change to Emergency Tech Specs Re Div III Nuclear Sys Protection Sys Inverter Concerning Inoperability of Emergency Shutdown Svc Water Sys Pump1990-09-12012 September 1990 Requests Expedited Review & Approval of Proposed Change to Emergency Tech Specs Re Div III Nuclear Sys Protection Sys Inverter Concerning Inoperability of Emergency Shutdown Svc Water Sys Pump U-601729, Notifies That Bn Chambers Permanently Reassigned to Position Not Requiring Operator License.Certification of Chambers Need to Hold License Previously Provided by Dp Hall Withdrawn1990-08-27027 August 1990 Notifies That Bn Chambers Permanently Reassigned to Position Not Requiring Operator License.Certification of Chambers Need to Hold License Previously Provided by Dp Hall Withdrawn JSP-676-90, Responds to 900725 Notice of Violation & Proposed Imposition of Civil Penalty Documented in Insp Rept 50-461/90-09. Corrective Action:Critique Initiated to Identify Precise Causes & Contributing Factors Leading to Event1990-08-23023 August 1990 Responds to 900725 Notice of Violation & Proposed Imposition of Civil Penalty Documented in Insp Rept 50-461/90-09. Corrective Action:Critique Initiated to Identify Precise Causes & Contributing Factors Leading to Event U-601723, Forwards Results of fitness-for-duty Program for 900103-0630,per 10CFR26.711990-08-16016 August 1990 Forwards Results of fitness-for-duty Program for 900103-0630,per 10CFR26.71 U-601722, Forwards Reissued NPDES Permit IL00369191990-08-10010 August 1990 Forwards Reissued NPDES Permit IL0036919 U-601721, Provides Response to Re Process for Requalification Exam Security Agreements.Security Agreement Forms Revised to Direct Individuals Not to Participate in Any Instruction Involving Operators or Senior Operators1990-08-0808 August 1990 Provides Response to Re Process for Requalification Exam Security Agreements.Security Agreement Forms Revised to Direct Individuals Not to Participate in Any Instruction Involving Operators or Senior Operators U-601716, Forwards Response to Violations Noted in Insp Rept 50-461/90-10.Response Withheld (Ref 10CFR73.21(c)(2))1990-08-0303 August 1990 Forwards Response to Violations Noted in Insp Rept 50-461/90-10.Response Withheld (Ref 10CFR73.21(c)(2)) U-601715, Provides Addl Info Re Proposed Amend to Plant Tech Spec 3/4.8.1.1, AC Sources - Operating, Per .Amend Will Allow Testing Frequency of Diesel Generator to Be Returned to Monthly1990-08-0202 August 1990 Provides Addl Info Re Proposed Amend to Plant Tech Spec 3/4.8.1.1, AC Sources - Operating, Per .Amend Will Allow Testing Frequency of Diesel Generator to Be Returned to Monthly U-601708, Forwards Revised Pages to Semiannual Radioactive Effluent Release Repts for Jul-Dec 1988,Jan-June 1989 & Jul-Dec 19891990-07-19019 July 1990 Forwards Revised Pages to Semiannual Radioactive Effluent Release Repts for Jul-Dec 1988,Jan-June 1989 & Jul-Dec 1989 U-601702, Forwards Rev 9D to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)1990-07-0202 July 1990 Forwards Rev 9D to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML20044A3001990-06-22022 June 1990 Forwards Update to 890817 Response to Bulletin 88-008,Suppl 3, Thermal Stresses in Piping Connected to Rcs. Unisolable Piping Connected to RCS Identified & Evaluated to Determine Which Piping Could Be Subj to Stratified Flow Phenomena ML20044A4601990-06-22022 June 1990 Provides Followup to 900622 Request for Waiver of Compliance Re Tech Spec Limiting Condition for Operation Concerning Standby Emergency Diesel Generator 1B.Rev to Attachment 1 of Original Request for Waiver Encl ML20043H5021990-06-19019 June 1990 Requests Changes to License NPF-62,correcting Typos, Refs to Fsar,Testing to Be Done During Initial Plant Startup & Incorporating Revised Operating Power/Flow Map for Two Reactor Recirculation Loop Operation ML20043G8221990-06-0707 June 1990 Provides Update to Util Response to Item 1 of Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. ML20043F0591990-06-0606 June 1990 Forwards Endorsements 44-50 to Nelia Policy NF-261 & 25-31 to Maelu Policy MF-121 & 10 & 11 to Maelu Policy N-85 & M-85,respectively ML20043D0531990-05-31031 May 1990 Forwards 1989 Annual Rept for Illinois Power Co & Soyland Power Cooperative,Inc ML20043C7501990-05-25025 May 1990 Forwards Rev 20 to Illinois Power Nuclear Program QA Manual. Rev Evaluated by Util as Not Reducing Quality Program Commitments ML20043B4891990-05-21021 May 1990 Informs NRC of Plant Initiatives for 1990 to Improve Corrective Action Program Effectiveness,In Response to SALP Rept & Violations Noted in Insp Rept 50-461/89-32. Centralized Commitment Tracking Sys Upgraded ML20043B1141990-05-17017 May 1990 Suppls 900330 Response to Station Blackout Rule.Calculation of Heatup of Main Control Room Due to Loss of Ventilation Following Station Blackout Revised to Properly Account for Heat Sinks & Credit Existing Masonry Walls ML20043D9901990-05-14014 May 1990 Responds to NRC 900413 Ltr Re Violations Noted in Insp Rept 50-461/90-02.Corrective Actions:Safety Evaluation Prepared & Reviewed for Level Instrumentation & Annunciators Identified in Updated SAR ML20043A9811990-05-14014 May 1990 Notifies That Wc Metzner Resigned from Position of Licensed Operator W/Util,Effective 900430 ML20042E6181990-04-13013 April 1990 Updates 890406 Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Condition Rept Initiated to Address Issue to Drain Instrument Air Filter Regulators ML20012E8991990-03-27027 March 1990 Forwards Rev 9C to Physical Security Plan.Rev Does Not Decrease Effectiveness of Plan.Rev Withheld (Ref 10CFR73.21) ML20012D9451990-03-20020 March 1990 Informs of Current Activities Re Restoration of Shutdown Svc Water (SX) Sys to Operability Following Cleaning of Div I HX Per Generic Ltr 89-13.SX Sys to Be Restored by Returning Sys Flows to Design Values ML20012D9641990-03-19019 March 1990 Lists Present Levels of Property Insurance Coverage & Sources of Insurance,Per 10CFR50.54(w)(2) ML20012D9901990-03-19019 March 1990 Responds to NRC 900216 Ltr Re Violations Noted in Insp Rept 50-461/89-38.Corrective Actions:Maint Supervision Added Critical Points to Existing Maint Work Requests & Preventive Maint Activities & Training Program Updated ML20012D4321990-03-16016 March 1990 Responds to Bulletin 88-008,Suppl 3, Thermal Stresses in Piping Connected to Rcs. Detailed Analytical Review & Proposed Schedule for Implementing Required Actions Scheduled to Be Completed by 900625 ML20012A2771990-02-28028 February 1990 Forwards Final Response to NRC Bulletin 88-010,Suppl 1, Nonconforming Molded Case Circuit Breakers. Actions Taken by Util Have Established That All safety-related Circuits Remaining in Stock Can Be Verifiably Traced to Mfg ML20012C2511990-02-23023 February 1990 Responds to Ninth SALP Rept 50-461/89-01 for Sept 1988 - Oct 1989.Rept Concluded That Overall Performance Satisfactory & Identified Strengths in Areas of Emergency Preparedness U-601611, Notifies That Gd Setser Resigned Position W/Util,Effective 9002131990-02-20020 February 1990 Notifies That Gd Setser Resigned Position W/Util,Effective 900213 ML20011F6501990-02-12012 February 1990 Responds to NRC 900112 Ltr Re Violations Noted in Insp Rept 50-461/89-37.Corrective Actions:Radiation Protection Technicians Provided W/Method for Identifying Radiation Work Permits Which Change Radiological Conditions ML20006C6721990-02-0505 February 1990 Responds to NRC 891207 Ltr Re Violations Noted in Insp Rept 50-461/89-35.Corrective Actions:Emergency Planning Bulletin Issued to All Emergency Response Organization Members Emphasizing Importance of Attending Required Training ML20006D1951990-01-30030 January 1990 Responds to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Util Intends to Discontinue Sending Ack Upon Receipt of Vendor Manual Matls ML20006A8291990-01-23023 January 1990 Forwards Rev 3 to Inservice Exam Plan. Changes to Text Described.Approval of Changes by 900601 to Allow Time to Plan Refueling Outage Activities Re Inservice Exam Program Requested ML20005H2711990-01-12012 January 1990 Advises That Licensee Will Remove Terminal Blocks for Control Circuits within 100% Relative Humidity Harsh Environ at Plant by End of Second Refueling Outage Currently Scheduled to Begin in Sept 1990 ML20006A7121990-01-10010 January 1990 Forwards Revised Pages to 1987 Radiological Environ Monitoring Rept ML20005F0001990-01-0505 January 1990 Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Util Revised Plant Operating Procedures for Hpcs,Lpcs & RHR Pumps & Vibration Monitoring Program Expanded to Include ECCS Pumps at Plant ML20006A7921989-12-29029 December 1989 Responds to 891129 Ltr Which Forwarded Insp Rept 50-461/89-31,requesting Identification of Actions Underway to Ensure That Falsification of Interim Security Screening Records Would Be Detected in Timely Manner in Future U-601573, Responds to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Detailed Procedures Controlling Actuator Adjustments,Repair,Preventive Maint & Other Activities Used & Updated Frequently1989-12-29029 December 1989 Responds to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Detailed Procedures Controlling Actuator Adjustments,Repair,Preventive Maint & Other Activities Used & Updated Frequently ML20005E0891989-12-27027 December 1989 Advises That Revised Fitness for Duty Program Will Meet 10CFR26 Requirements,Effective 900103.Util Intends to Test for Substances Listed at Indicated cut-off Levels ML20006C2961989-12-21021 December 1989 Responds to NRC 891121 Ltr Re Violations Noted in Insp Rept 50-461/89-32.Corrective Actions:Review Performed to Identify Surveillances Which Require Lifting of Leads in Main Control Room ML20005D9521989-12-15015 December 1989 Forwards Monthly Operating Rept for Nov 1989 for Clinton Power Station Unit 1 & Corrections to Oct 1989 Rept ML20005E7781989-12-12012 December 1989 Advises That False Alarm Criteria Will Be Implemented by 900131,per Insp Rept 50-461/89-31.Util Established New Criterion of 100 False Alarms for Security Sys in 24 H Period ML20011D1741989-12-0707 December 1989 Informs of Changes Made to Util Fitness for Duty Program Procedure.Change Specifies That Supervisor - Medical Programs,Assistant Director - Labor Relations or Manager - Nuclear Planning & Support Will Generate Computer List ML19332F0071989-11-30030 November 1989 Responds to Violations Noted in Insp Rept 50-461/89-29. Corrective Actions:Preventive Maint for Ph Monitor & Liquid & Gaseous Gamma Monitors Added to Appropriate Tracking Programs ML19332E9431989-11-29029 November 1989 Forwards Executed Amends 4 & 5 to Indemnity Agreement B-91, Reflecting Change in Ownership of License,Effective 890327 ML19332D5031989-11-27027 November 1989 Responds to Generic Ltr 89-21 Re Status of Implementation of USI Requirements.Results of Util Review & Reporting of Status of Implementation of USIs Encl ML19332D0291989-11-22022 November 1989 Informs That Effective 891201,JS Perry Will Assume Responsibility for Mgt of Nuclear Program at Util ML19332D0431989-11-22022 November 1989 Informs NRC of Change in Schedule for Providing Info Re Environ Qualification Testing of Terminal Blocks for Control Circuits of Conax Electrical Penetrations.Wyle Labs Test Results & Util Review of Results Will Be Sent by 900112 1990-09-19
[Table view] |
Text
g U-600279 LO8-85 (10 - 1G-L 1A.120 ILLINDIS POWER COMPANY -
October 16, 1985 Docket No. 50-461 Director of Nuclear Reactor Regulation Attn: Mr. W. R. Butler, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20553
Subject:
Clinton Power Station Requirements for Reduction of Risk of Anticipated Transients With.sut Scram (ATWS) Events for Light-Water-Cooled Nuclear Power Plants (10CFR50.62)
This letter is Illinois Power's (IP) reply to 10CFR50.62(d) which requires each license o submit a schedule for meeting the requirements of paragraphs (c)(1) through (c)(5) of 10CFR50.62. Paragraphs (c)(1) and (c)(2) are only applicable to pressurized water reactors and not te the design of Clinton Power Station (CPS). The design of the CPS ATWS systems is complete and satisfies the requirements of paragraphs (c)(3) through (c)(5) . Installation of the ATWS systems has also been completed. Clinton Power Station Technical Specification 3/4.1.5
" Standby Liquid Control System" will be revised prior to fuel load to accommodate the 86 gallons per minute flow equivalency requirement.
Illinois Power's position is that no additional Technical Specification changes are required to implement the ATWS Rule. This is consistent with the position presented to the NRC by the BWR Owner's Group.
~
Listed in the attachment to this letter are the requirements of 10CFR50.62 paragraphs (c)(3) through (c)(5) and the CPS method of implementation. The guidance regarding system and equipment specifications published on June 26, 1984, in the Federal Register is also addressed.
Sincerely yours, F. A. ang berg g 102{O POR 9 % ha [ Manager - Licensing and Safety A
SMK/kaf Attachment cc: B. L. Siegel, NRC Clinton Licensing Project Manager NRC Resident Office Illinois Department of Nuclear Safety g Regional Administrator, Region III, USNRC 7 4
. Attachm:nt to Letter U-600279 C,PS Implementation of 10CFR50.62 Requirements REQUIREMENT - 10CFR50.62 (c)(3)
Each boiling water reactor must have an alternate rod injection (ARI) system that is diverse (from the reactor trip system) from sensor output to the final actuation device. The ARI system must have redundant scram air header exhaust valves. The ARI must be designed to perform its function in a reliable manner and be independent (from the existing reactor trip system) from sensor output to the final actuation device.
REQUIREMENT - 10CFR50.62 (c)(5)
Each boiling water reactor must have equipment to trip the reactor coolant recirculating pumps automatically under conditions indicative of ;
an ATWS. This equipment must be designed to perform its function in a reliable manner.
CPS IMPLEMENTATION A non-safety related ARI System and ATWS Reactor Pump Trip (RPT)
System are provided to mitigate the potential consequences of an ATWS
.l event. These systems currently satisfy the requirements of paragraphs (c)(3) and (c)(5). Specific system and equipment specifications are discussed below.
Conformance to IEEE 279 " Criteria for Protection Systems for Nuclear Power Generating Stations" -
The RPT and ARI systems do not conform to the guidance of IEEE 279.
This is consistent with the requirements of 10CFR50.62.
Redundancy and Diversity -
The equipment used in the ARI and RPT systems are independent and diverse from the Reactor Protection System (RPS) equipment, where possible. The ARI system functions independently of the RPS by providing an alternate means of venting the scram air headers by opening the redundant scram valves. The ARI function is initiated manually, or I automatically by either Reactor Pressure Vessel (RPV) high pressure or RPV low water level. A two-out-of-two logic system for the diverse trip
- signal is used. The RPT system functions independently of the nuclear safety-related RPS system by providing an alternate means of tripping the recirculation pump motors and the low frequency motor / generator (LFMG) setc. A two-out-of-two logic system for the diverse trip signal i
is used. The trip logic for the system is initiated by either RPV high pressure or RPV low water level. The trip logic activates the trip coils in the recirculation pump and the LFMG set motor circuit breakers.
Once the trip logic is automatically initiated, the circuit breakers are manually reset through the normal breaker controls.
Four locally mounted (outside primary containment), non-safety related, non-indicating pressure transmitters measure reactor pressure for the ARI and RPT functions at four (reactor vessel quadrant) physically separated locations, similar to those used for RPS. These trarsmitters sense pressure from the same sensing lines used for the RPS. Cables from thase transmitters are routed to the ATWS panels.
Each pressure transmitter provides a signal to a trip module in its instrument channel (two channels per ATWS system). High reactor l
l
! I r
. - _ _ . . . - _ _ _-_ - -- , __ __ _m , -
Attachm:nt to L2tter U-600279 pressure initiates a trip signal in that channel. Both pressure trip inputs in either system must be initiated to cause ARI and RPT.
Four locally mounted (outside primary containment), non-safety related, non-indicating level (differential pressure) transmitters measure reactor water level for the ARI and RPT functions at four (reactor vessel quadrant) physically separated locations, similar to those used for RPS. These transmitters sense pressure from the same sensing lines used for the RPS. Cables from these transmitters are routed to the ATWS panels. Each level transmitter provides a signal to a trip module in its instrument channel (two channels per ATWS system).
Low reactor water level initiates a trip signal in that channel.
The ARI function is also capable of being manually initiated from the main control room by pushbutton switches. Both pushbutton switches for either channel must be armed by rotating the collar and depressed before the manual ARI function will be initiated for that channel.
" Electrical Independence -
Two separate and independent non-safety related 125VDC power
~
sources are provided tur the transmitters, control logic and solenoid coils. These power supplies are 20 minute time duration batteries
- separate from the RPS.
The ARI and RPT systems electrical components and wiring (transmitters, cabling, switches, and logic circuitry) assigned to each di. vision are separated from the other division's components and wiring by six inches or a metallic barrier. AR1 and RPT systems electrical components and wiring are separated from RPS components and wiring by six inches or a metallic barrier.
- Environmental and Seismic Qualifications -
The ARI and RPT systems equipment are qualified to meet the normal and abnormal environmental conditions. The equipment is not seismically qualified.
The ARI and RPT systems are classified as non-safety related.
Current design, procedures and/or practices are considered adequate for the testing, surveillance, and maintenance of these systems. Specific NRC requirements for non-safety related quality assurance for the ARI and RPT systems will be addressed by IP following the issuance of guidance from the Staff in addition to that provided in Generic Letter 85-06 " Quality Assurance Guidance for ATWS Equipment that is not Safety Related".
Two separate and independent non-safety related 125VDC power soerces are provided for the transmitters, control logic and solenoid oils. The system shall remain functional following an ATWS event including loss of off-site power and shall function to prevent the consequences of an ATWS event throughout the first 20 minutes of the event, based on the battery supply discussed under Electrical Independence.
2
Attachmsnt to Letter U-600279
Provisions for testing the systems control logic and valve solenoid coil continuity are provided. A test switch activates relay logic which inhibits the solenoid valve coils and the ARI and RPT activating relays from being energized. During testing, a signal is injected into the trip units for either two reactor pressure signals or two reactor water level signals to simulate a trip condition. Relay contacts that energize the solenoid valves and the activating relays are checked and then returned to normal. Indicating lights show the ARI and RPT systems are in test. Returning the systems from the test mode to normal function requires reset of both the test switch and a test circuit seal-in switch. This two-step process is provided since otherwise resetting the test switch to normal during a test would scram the reactor.
In order to minimize the chance of inadvertent ARI or RPT -6 actuation, an unavailability goal of inadvertent actuation of 1x10 spurious actuations/ year has been established. This assumes testing of the systems on a quarterly basis. Power supply failure has not been included. This goal is consistent with the unavailability goals of safety systems and is also comparable to similar designs of ATNS mitigating equipment. The two-out-of-two logic configuration used in the CPS design meets the unavailability goal.
REQUIREMENT - 10CFR50.62 (c)(4)
Each boiling water reactor must have a standby liquid control system (SLCS) with a minimum flow capacity and boron content equivalent in control capacity to 86 gallons per minute (gpm) of 13 weight percent sodium pentaborate solution. The SLCS and its injection location must be designed to perform its function in a reliable manner. The SLCS initiation must be automatic and must be designed to perform its function in a reliable manner for plants granted a construction permit after July 26, 1984, and for plants granted a construction permit prior to July 26, 1984, that have already been designed and built to include this feature.
CPS IMPLEMENTATION Clinton Power Station has an SLCS with an 86 gpm injection capacity. The CPS Technical Specification 3/4.1.5, " Standby Liquid Control System" will be revised prior to fuel load to require a minimum of 10.0 weight percent sodium pentaborate concentration . This will satisfy the 13 weight percent equivalent requirement for a 218 inch diameter reactor vessel as described in Generic Letter 85-03
" Clarification of Equivalent Control Capacity for Standby Liquid Control Systems". The CPS SLCS is manually initiated. The operators are procedurally (CPS No. 3314.01 " Standby Liquid Control") required to start both 43 gpm standby liquid control (SLC) pumps'for SLC injection.
Specific system and equipment specifications are discussed below.
'Conformance to IEEE 279 " Criteria for Protection Systems for Nuclear l Power Generating Stations" -
The SLCS is in general conformance with IEEE 279. Specific compliance with IEEE 279 is detailed below.
3
Attachmtnt to Letter U-600279 General Functional Requirement (Paragraph 4.1) - The SLCS is manually initiated by operator action, in accordance with the CPS upgraded Symptomatic Emergency Operating Procedures, as approved by the Staff.
Sodium pentaborate injection is required if the suppression pool Boron Injection Initiation Temperature Limit is exceeded and reactor power is indeterminate or greater than 3 percent. The basis for these limits is in accordance with the Staff approved BWR Owner's Group Generic Emergency Procedures Guidelines.
Single Failure Criterion (Paragraph 4.2) - The SLCS is a backup method of manually shutting down the reactor to cold subcritical conditions by independent means other thar. the normal method by the control rod system. However, the discharge pumps and pump motors, the explosive valves, and the storage tank discharge valves are redundant so that no single failure in one of these components will cause or prevent initiation of SLCS.
Quality of Components and Modules (Paragraph 4.3) - The control components of SLCS are qualified Class 1E in accordance with IEEE 323, "IEEE Standard for Qualifying Class IE Equipment for Nuclear Power Generating Stations."
Equipment Qualification (Paragraph 4.4) - Equipment qualification is discussed under Environmental Qualification.
Channel Integrity (Paragraph 4.5) - The SLCS is not required to operate during a design basis accident. It is designed to remain functional following an SSE.
Channel Independence (Paragraph 4.6) - The SLCS is a backup method of manually shutting down the reactor to cold saberitical conditions by independent means other than the normal method by using the control rod system. It is therefore kept independent of the control rod scram system. There are two channels of control circuits for discharge pumps and motors, explosive valves and storage tank discharge valves. These two channels are independent of each other, so that failure in one channel will not prevent the other from operating.
Control and Protection Interaction (Paragraph 4.7) - The SLCS has no interaction with plant control systems. It has no function during normal plant operation and it is completely independent of control systems and other safety systems.
Derivation of System Inputs (Paragraph 4.8) - Display instrumentations in the main control room provide the operator with information on suppression pool water temperature, neutron flux level and control rod position. Based on this information, the operator can manually initiate SLCS, as required by CPS Emergency Operating Procedure 4404.01,
" Reactivity Control - Emergency."
Capability of Sensor Checks (Paragraph 4.9) - The explosive valve control circuits continuity is continuously monitored and is indicated in the main control room.
4
Attachm:nt to Letter U-600279 Capability for Test and Calibration (Paragraph 4.10) - The explosive valves may be tested during plant shutdown. The explosive valve control circuits are continuously monitored and indicated in the main control room. The remainder of the SLCS may be tested during normal plant operation to verify each element, passive or active, is capable of performing its intended function. In the test mode, demineralized water instead of sodium pentaborate solution is circulated from, and back to, the SLCS test tank.
Channel Bypass or Removal from operation (Paragraph 4.11) - The discharge pumps and pump motors are redundant, so that one pump may be removed from service during normal plant operation.
Operating Bypass (Paragraph 4.12) - The SLCS han no function during normal plant operation.
Indication of Bypass (Paragraph 4.13) - Removal of components from service is manually indicated in the main control room.
Access to Means for Bypass (Paragraph 4.14) - Removal of components from service during normal plant operation is under administrative control.
Multiple Set Points (Paragraph 4.15) - The actual injection operation of SLCS is not dependent on, or affected by, set points, because the system is manually initiated.
Completion of Protective Action Once it is Initiated (Paragraph 4.16) -
The explosive valves remain open once fired, and once initiated the injection valves will not close and discharge pump motors will not stop running unless terminated by operator action.
Manual Initiation (Paragraph 4.17) - The SLCS may only be manually initiated.
Access to Set Point Adjustments Calibration and Test Points (Paragraph 4.18) - The actual injection cperation of SLCS is not dependent on or affected by any set point adjustment or calibration, because the system is manually initiated. The control circuits, discharge pumps, pump motors, and motor-operated valves are accessible for test and service.
Setpoint adjustment for the sodium pentaborate solution temperature and level are inside the containment or within the main control room and are under administrative control.
Identification of Protective Actions (Paragraph 4.19) - The following ,
items are located in the main control room for operator information:
Analog Indication 1
(1) Storage tank level (2) System pressures (3) Explosive valve continuity 5
Attachm:nt to Letter U-600279 Indicating Lamps (1) Pump status and automatic trip (2) Explosive valve continuity (3) Position of injection line manual service valve in SLC sparger line (4) Position of storage tank outlet valve (5) Position of test tank discharge manual service valve Annunciators and Status Lights The standby liquid control system main control room annunciators and status lights indicate:
(1) Manual or automatic out of service condition of SLC system "A" and/or "B" due to:
- a. Operation of manual out-of-service switch,
- b. The loss of continuity of any explosive valve primers.
- c. Storage tank outlet valve in test / status,
- d. Overload trip or power loss in pump or storage tank outlet valve controls.
(2) Standby liquid storage tank high or low temperature (3) Standby liquid tank high or low level (4) Standby liquid pump "A" or "B" auto trip.
Instrument indications for the following are mounted locally at the equipment for operator utilization:
Analog Indication (1) Storage tank level (2) System pressures (3) Storage tank temperature Indicating Lamps (1) Pump status (2) Storage tank operating heater status (3) Storage tank mixing heater status Information Readout (Paragraph 4.20) - The discharge pressure of sodium pentaborate pumps is indicated in the main control room. Also, storage tank level is indicated in the main control room.
- System Repair (Paragraph 4.21) - The control circuits, pumps and pump motors may be repaired or replaced during normal plant operation. This is possible because of the redundant electrical control train provided.
Identification (Paragraph 4.22) - All controls and instrumentation located in main control room panels are clearly identified by nameplates.
- Redundancy and Diversity -
The SLCS is functionally redundant to the control rod drive system in achieving and maintaining the reactor suberitical. Therefore, the SLCS as a system by itself is not required to be redundant, although the active components and control channels are redundant for serviceability.
Diversity of initiating circuits is not employed for the SLCS design.
The SLCS provides, however, a diverse means for reactivity control.
6
Attachment to Letter U-600279
- Electrical Independence and Physical Separation -
The SLCS is separated both physically and electrically from the control rod drive system. The SLC system electrical control channels are separated in accordance with the requirements of Regulatory Guide 1.75, Revision 2 - Physical Independence of Electrical Systems.
- Environmental Qualification -
No components of SLCS are required to operate in the drywell environment. A maintenance valve and isolation check valve are the only components located inside the drywell and the maintenance valve is normally locked open. Other SLCS equipment is located outside the drywell and is capable of operation following a safe shutdown earthquake (SSE). The controlo essential for the injection of SLCS are qualified Class 1E. Specific conformance to the requirements of IEEE 323 " General Guide for Qualifying Class 1 Electric Equipment for Nuclect Power Generator Statien=" is met by the development of written procedures and responsibilities for the dcsign of all Class IE electric equipment.
This includes preparation of specifications, qualification procedures, and documentation. Standards manuals are maintained containing specification, practices, and procedures for implementing qualification requirements, and an auditable file of qualification documents is available for review.
"Scismic Qualification -
The standby liquid control process equipment, instrumentation, and controls essential for injection of the neutron absorber solution into the reactor are designed to withstand Seismic Category I carthquakn loads. Non-direct process equipment, instrumentation, and controls of the system are not required to meet Seismic Category I requirements, however, the local and main control room mounted equipment is located in seismically qualified panels.
' Quality Assurance -
The SLCS is in compliance with the Illinois Power Quality Assurance Program. The Quality Assurance Program for design and construction of CPS is described in the Illinois Power Nuclear Power Construction Quality Assurance Manual. The Quality Assurance Program during the operational phase of CPS is described in the Illinois Power Nuclear Power Operational Quality Assurance Manual.
' Power Supply -
The power supply to one explosive-operated injection valve, storage tank outlet valve, and injection pump and control circuit is powered from Division 1, 480 VAC. The supply to the other explosive-operated injection valve, storage outlet valve, and injection pump and control circuit is powered from Division 2, 480 VAC. The power supply to the tank heaters and heater controls is provided from a reliable AC source.
The ,$ower supply to the main control room benchboard indicator lights and the level and pressure sensors is powered from an emergency instrument bus.
7
Attachm2nt to Letter U-600279
' Testability -
Testability is in conformance with Regulatory Guide 1.22, Revision 0 - Periodic Testing of Protection System Actuation Functions.
The SLCS is capable of testing initiation to actuated devices, except the explosive valves, during normal operation. In the test mode, demineralized water is circulated in the SLCS loops rather than sodium pentaborate. The explosive valves may be tested when the plaat is shut down. Otherwise, continuity in the explosive valve initiation circuits is continuously monitored during plant operation.
The standby liquid control is manually initiated in the main control room by turning a key-lock switch for System A, or a different key-lock switch for System B to the RUN position. The switch slip contacts remain in the activated position, but the mechanisms spring returns to the center (NORMAL) position from which the key may be removed. This design minimizes the frequency of inadvertent actuation by placing system initiation under sdministrative control.
8