i TOLEDO EDISON Docket No. 50-346
- ' LOWELL E. ROE
~'
License No. NPF-3 ww.
p o....
Serial No. 509 u'ssi ano.same May 23, 1979 Director of Nuclear Reactor Regulation Attention:
Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Reid:
Unit 1 (DB-1).This letter transmits items pertaining to the Davis-Besse Nuc Nuclear Regulatory Commission order docketed May 17 Operat a
ower Station associated with NRC letter dated May 18, 1979 from Mr. R. N. Reid, ar
, 1979, as well as those
.Attachme,nt,A provides a matrix to cross reference station procedures concerns of the above documents.
The matrix itemizes the procedures accompanying the letter Very truly yours, 7
7
,J).J,j.r.bn.
o s 4- --
p,,,), bi 3 D>J % 6 LER:TJM f
i m} k ~~ f/ml.
cc:
J. Zwetzig l
Operating Reactors Branch No. 4
- uf~. %
J,/> j/ff:
Division of Operating Reactors I
V. S. Nuclear Regulatory Commission i
{
i Washington, D. C. 20555 Te
. f, k
b
~
/
8510070123 850717 PDR COMMS NRCC g
CORRESPONDENCE PDR THE TOLEOQ EDtSON COMPANYEOSON PLAZA 300 MADISON AVENUE TOLECO. CHO 43652
e e:
y D;vis-Besse Nuclear Power Station Unit 1 Procedure Matrix Attachment A Page 1 of 3 4
Matrix Items Category Associated Item of Associated Item of Order Dated May 16, 1979 Control of Essential Locked Valves NRC Letter of May 18, 1979 A
~
Power'ReliefValveSticlhing B
- 6 C
Testing, System Operability, Keeping RO Informed
- 8 D
AFW Flow Indication
- 6 la E
Removal of ICS Control of AFW 7a
'lb F
Automatic Anticipatory Reactor Trips.'
- 2, 7a ic C
Small Break Analysis
- 7a Id
- 12, 7a 8
I
.c
- s.
O g,-
e w
x--
m
...... - 7 3
- n..
i
)
i D:vis-Besse Nuclear Power Station Unit 1
~
j Procedure Matrix Attachment A 1
Page 2 of 3 4
Procedure No.
Title A
B C
D E
_F C_
SP 1105.16 SFRC System Procedure SP 1106.06
~
X Auxiliary Peed _ System X
X EP 1202.01 Load Rejection i
X EP 1202.02 Station Blackout 3
X X
J 1
4 j
EP 1202.04 Reactor /Turline Trip X
I EP 1202.06 Loss.RC & RCS Pressure X'
X X
Y EP 1202.14 X
Loss RC Flow - RCP Trip 1
X X
j EP 1202.22 High Condenser Pressure EP EP 1202.24 Steam Supply System Rupture l
X i
EP 1202.26 Loss of SC. Peedwater X
X X
{
AB 1203.02 Total Loss of AC Power X
X i
AB 1203.04 Depress.'W/ Safety Grade Equipment X
1 j
AD 1803.00 Safety Tagging Procedure X
X i
AD 1838.00 Surveillance Test Program X
1 AD 1838.02 Performance of Surveillance Tests i
X j
AD 1839.00 Station Operations X
I X
AD 1839.02 i
Operation / Cont. col Locked Vivs.
X i
l
~
e p
. D:vis-Besse Nuclear Pow.er Station Unit 1
}
, Procedure Matrix Attachment A Page 3 of 3 l
Procedure No.
Title i
A B
C D
E F
G AD 1839.03 Operation / Control Capped Vive.
X
~
AD 1844.00 Maintenance i
X X
AP 3003.41 - 44 HP Inj., Flow Hi * -
p AP 3003.49 - 30 LP Inj. Flow Hi X
AP 3003.51 - 54 HP Inj. Flow Lo X
X AP 3003.59 - 60 LP InJ. Flow Lo
~
ST 5051.01 ECCs Subsystems Monthly STt.
ST 5062.01
.X Containment Spray Monthly S. T.
ST 5071.01 X
APW Monthly S. T.
ST 5075.01 X
Service Water Monthly S. T.
X ST 5081.01 X
Diesel Generator Monthly S. T.
PT 5'186.01 X
Locked valve Verification X
SP 1105.04 Integrated control System I
X e
I*
i I
l i
i
.1 s
i 1
- -