Text
.. -. _...
. ~ _.
, e' t** "8 %,
UNITE 3 STATES
[',,
NUCLEAR REGULATORY COMMIS$1 N 8
a nacioN iis e
i 3
l no moosavaLT no4o g
,p oces su.vu,itumo e som I
December 7, 1983 2
1 MEMORANDP' FOR: Thomas A. Rehm, Assistant for Operations Office of the i
Executive Director for Operations i
l FROM:
A. Bert Davis, Deputy Regional Administrator, Region III
SUBJECT:
REPORT POR COMMISSIONER GILINSKY ON DAVIS BESSE REGULATORY IMPROVEMENT PROGRAM Enclosed is a proposed transmittal memorandum and report related to the Davis Besse Regulatory Improvement Program, which we reconsnend be sent to e
I Co:mnissioner Gilinsky.
If you have any questions on this, please contact me.
}
A er i
Deputy Regional Administrator 4
[
Enclosure:
As stated 1
l l
t I
)
i i
t i
)
I i
i 1
j m
DRAFT MEMORANDUM FOR: Coassissioner Gilinsky FROM:
William J. Dircks, Executive Director for Operations
SUBJECT:
DAVIS BESSE. REGULATORY IMPROVEMENT PROGRAM Recognizing your interest in the regulatory performance of Toledo Edison Company's Davis Besse facility, I am sending you a copy of a report describing a meeting held by kesion III and the Office of Nuclear Reactor Regulation with
,the company. The meeting was held to launch a Regulatory improvement Program at this facility.
If you have any questions on this matter, we would be pleased to discuss them.
William J. Dircks Executive Director for Operations Inclosure:
As stated cc w/enclosuret Chairman Falladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal H, li. OW R. C h a. Y
- "b3?g UNITED STATES
- *[jk C
NUCtEAR REGUtATORY COMMISSION s:EDON W
.i j
tes moossvatt mono L-
/
auss sLLvm. stumois son?
NOV 2 31983 1
Do'ket No. 50-346
)
c i
Toledo Edison Company i
ATTN:
Mr. Richard P. Crouse Vice President Nuclear Edison Plaza 300 Madison Avenue i
Toledo, OH 43652 Gentlemen:
This refers to the management meeting conducted by members of my staff and me on November 4, 1983, at the Davis-Besse Administration Building with
,Mr. Johnson, members of your staff, and you.
The enclosed report identifies the areas discussed during the meeting. As indicated in the report, the meeting was held.to discuss the need for a Regulatory Improvement Program to improve your performance at Davis-Besse.
No items of noncompliance with NRC requirements were identified during the 3
i course of this meeting.
l In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s) 1 will be placed in the NRC Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written application to withhold information contained therein within thirty days of the date of this letter.
Such application must be consistent with the re-quirements of 2.790(b)(1).
If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be placed in the Public Document Room.
I We will gladly discuss any questions you have concerning this meeting. We plan to meet with you in December, 1983 and January, 1984 to monitor the l
e I
l t
-~
b b
Toledo Edison Company 2
development of the Regulatory Improvement Program and periodically thereafter to monitor its implementation.
Sincerely,
" Original Signed by A. B. Davis" A. B. Davis Deputy Regional Administrator
Enclosure:
Inspection Report No. 50-346/83-23(DPRP) cc w/ enc 1:
T. D. Murray, Station Superintendent DNB/ Document Control Desk (RIDS)
' Resident Inspector, RIII Harold W. Kohn, Ohio EPA James h'. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health O
RI!
R!II R
I I
R!f!
R rs/db r
D is f11/22/83
- /JJ
U. S. NUCLEAR REGULATORY COMMISSION REGION III, Report No. 50-346/83-23(DPRP)
Docket No. 50-346 License No. NPF-3 1
Licensee: Toledo Edison Company Edison Plaza 300 Madison Avenue
]
Toledo, OH 43652 Management Meeting At: Davis-Besse Administration Building Route 2 Oak Harbor, OH i
Prepared By:
. R sf
// -J 3 "/ J Mni Resident Inspector Date Yw ief
// J5 */3 Approved By:
a Reacto Projects Section 2B Date i
I I
l i
1 e
1 t
1 e
i
o.
DETAILS 1.
Attendees Toledo Edison Company I
W. A. Johnson, President R. P. Crouse, Vice-President Nuclear Mission T. D. Murray, Station Superintendent J. F. Helle, Director of Nuclear Facility Engineering C. T. Daft, Quality Assurance Director L. A. Grime, Nuclear Safety Director T. J. Nyers, Nuclear Services Director J. Faris, Administrative Assistant to Station Superintendent 1
R. F. Peters, Nuclear Licensing Manager j
A. K. Zarkesh, Drawing Control Program Manager j
J. Greer, Quality Assurance Supervisor 4
I Nuclear Regulatory Commission A. B. Davis, Deputy Regional Administrator for Region III W. D. Shafer, Branch Chief.of Projects 2 Region III z
J.,F. Stolz, NRR Branch Chief 4
W. G. Rogers, SRI for Davis-Besse l
A. DeAgazio, NRR Project Manager for Davis-Besse C. Anderson, Inspector Trainee Region III l
2.
Meeting Summary Meeting on November 4, 1983 (Report No. 50-346/83-23(DPRP)).
a.
Scope of Meeting A special, announced meeting was held with corporate and site management to request the licensee to develop a Regulatory i
Improvement Program (RIP) that would encompass all aspects of
)
management and operation for which an improvement in performance j
is needed at Davis-Besse Unit 1 Plant.
l b.
Background
i This meeting was requested by Region III as a result of ecccerns
!!o originally addressed in the licensee's comprehensive corrective l
action program (see response to IE Inspection Report 83-01),
concerns identified in subsequent inspection reports and concerns identified during a site. visit of Commissioner V. Gilinsky, on October 4, 1983.
1 1
2 e
- -+,.,, -. -
mm.,-,-__
_ ~.-.. _
.- _.. -_..,.. - _. ~,..., - -,
.e
. ~, ~-.
c.
Specifics Mr. Davis began the, meeting by discussing the events that led up to the meeting (see Section 2).
Based on these events he stated that the licensee should develop a Regulatory Improvement Program to improve its management controls and plant operations. He explained that the RIP is a licensee developed program which identifies areas needing improvement, determines the cause of weaknesses and formulates a plan for correction of the weaknesses. Additionally, the implementation ~ plan has scheduled milestones for each area of weakness and should be completed within two years.
Periodically the NRC will meet with the licensee's senior management to monitor the development and implementation of the RIP.
Mr. Davis gave some examples of areas which should be considered by the licensee for incitsion in the RIP. These examples were:
Evaluation of personnel practices to assure they are adequate to identify and maintain staff quality and quantity in each department to operate the plant and perfore the licensing functions; evaluation of corporate / plant managerc and supervisors to determine if their workloads are manageable scJ realistic, work location is appropriate and the proper time is being devoted to plant activities; evaluation of the technical specifications and final and updated safety analysis report to determine operability lini,ts on safety-related systems, and improve managements systems and personnel capability to ensure a more thorough evaluation of LERs, corrective actions and resolution of commitments. He also stated that the Commissioner's concerns and the open commitments of the comprehetsive corrective action program should be included in the RIP.
Though the NRC had concerns in a number of areas, Mr. Davis stated that the RIP evaluation should not be limited to these areas but should cover all weaknesses identified by the licensee.
Mr. Shafer continued the presentation by giving the licensee copies of other RIPS developed by other licensees experiencing similar problems in the past. As an example of a typical problem area, Mr. Shafer and Mr. Rogers described the need for evaluation of the Quality Assurance Department staffing qualifications and training.
Mr. Rogers stated that training on Quality Assurance Department requirements were necessary for all personnel. Training at Davis-Besse was also identified as needing management attention.
Mr. Davis then discussed a number of the items he felt represented Commissioner Gilinsky's concerns with Davis-Besse.
At the end of this discussion, Mr. Crouse stated that a full diagnostic evaluation would be performed over the Nuclear Mission to determine weak areas and define the RIP.
3
J d.
Summa ry It was mutually agreed that in approximately six weeks TECO would meet with the'NRC to work out the first draft of the RIP.
The next management level meeting on the RIP would be the first or second week in January. After this meeting, the licensee will formally submit the RIP to the NRC.
Mr. Davis concluded the meeting by stating that the RIP was a living document which could be revised with concurrence from Region III Lat the completion goal should be no more than two years.