| Site: | 05000000, Davis Besse |
| Issue date: | 11/07/1983 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shafer W NRC |
| Shared Package | |
| ML20132B273 | List:
|
| References | |
| NUDOCS 8510070155 | |
| Download: ML20133B912 (2) | |
Text
- ,y I. ** ~
e.
UNIT CL i1' 'ti
""~*,
I E' n,,, :
s, t c,t 'l 4
- r. '
R f C IN. It' y....'
7#6 b('Uf8 iI.'
I:
'(,
/
CLEN ELLYN ttLINi (Dl*7 8
November 7, 1983 MEMORANDD' FOR:
k'ayne Shafc:, Chief, Proj ects Eranch 2 FROM:
A. Eert Dtvis, Deputy Regior.d Administrator
SUBJECT:
TOLEDO EDISON COMPANY REGULATORY DTROVEMENT PROGRAM Based on our meeting with Toledo Edison Company on November 4, 1983, and our discussions vith John F. Stolz and Al DeAgazio of NRR, I have developed the enclosed list of notes and action items which I believe represent our agree =ents with TECo and NK.R.
Please review these items and let me know if you disagree with any of them, or if you believe additional items should be included.
May I have your response by November 14, 1983 please.
N M
A. Bert Davis Deputy Regional Ad=inistrator
Enclosure:
As stated
... p cc v/ enclosure:
C. E. Norelius R. L. Spessard l
8510070155 850717 PDR COMMS NRCC CORRESPONDENCE PDR
.~
TOLEDO EDISON COMPANY REGULATOLY IF3ROVEMENT PROGRAM (Notes and Action Items) i 1.
TECo has agreed to develop a Regulatory Improvement Program (RIP).
Mr. Shafer and his people will meet with TECo before the end of November to work out the first draft of this RIP.
2.
The first higher management level meeting on the RIP will be the first or second week in January, 1984.
After this meeting, the licensee will formally submit the RIP to the NRC.
3.
Mr. Davis and Mr. Stolz vill converse by telephone on November 7, 1983 to discuss the strategy regarding informing Commissioner Gilinsky of the proposed actions for upgrading TECo's performance at Davis-Besse.
4.
Mr. Shafer and his staff will perform brief write-ups on the following Commissioner Gilinsky concerns:
1, 3, 5, 11, 12, 13, 14, and 15. NRR will prepare writeups on items 2, 4, 6, 7, 8, 9, and 10.
Mr. Shafer may also prepare written comments for items 7, 9, and 10.
These short write-ups will be prepared by Nove=ber 9, 1983 so that we may fax them to NRR for their review before they are used as a basis for discussion with Commissioner Gilinsky. Likewise NRR will provide their write-ups to RIII for our review.
5.
It is our goal to develop a RIP which can be accomplished in no more than a two year period.
The RIP will identify areas which need improvement and will identify the necessary actions in each area to bring about this improvement. The actions will have scheduled dates associated with them.
We will meet with the licensee at least bi-monthly to discuss the
. progress being made in epch area. The ~ RIP will be a living document,.
- "~
- which-wdil be revised as appropriate if there are significant changes'or' schedule slippages.
6.
Mr. Shafer should take the lead, utilizing the knowledge and judgements of other NRC people as appropriate, to develop what our position will be regarding the amount of time a Vice-President and a Plant Manager should be involved in activities which do not directly support the operation of the reactor facility.
7.
Mr. Shafer will resolve with NRR the adequacy of the location of the SR0s at Davis-Besse with respect to the new rule requirement which will be effective on January 1, 1984 Based on comments made at the November 4 meeting, it appears that the licensee believes he has the Resident Inspector's agreement with the licensee's position on this matter. The matter needs to be pursued with NRR since the licensee's position may not be consistent with NRC requirements, i
p
.e.-
'/
, /
UNITED ST ATE.t
.[ ', [1 NUCLEAR REGULATORY COMMISSION y
E REGION iti k,
[
799 ROOSEVELT ROAD
'm f
CLEN ELLYN ILLINolS 60137
....+
November 23, 1983 NOTICE OF SIGNIFICANT LICENSEE MEETING PLEASE NOTE: Meeting Previous Scheduled for November 29, 198 Name of Licensee: Toledo Edison Company Name of Facility: Davis-Besse Nuclear Station Docket No.:
50-346 Dafe and Time of Meeting: Thursday, December 1, 1983 at 10:30 a.m.
Location of Meeting: Region III Office 799 Roosevelt Road Glen Ellyn, IL 60137 Purpose of Meeting: Enforcement Conference to discuss the re~ ults of the s
Appendix R inspection at the Davis-Besse station.
NRC F.eadquarters Attendee:
J. A. Axelrad, Director, Enforcement Staff, IE RIII Attendees:
J. G. Keppler, Regional Administrator R. L. Spessard, Director, Division of Engineering W. S. Little, Chief, Engineering Branch 2, Division of Engineering Other appropriate NRC personnel.
Licensee Attendees:
W. A. Johnson, President and Chief Operating Officer R. P. Crouse, Vice President, Nuclear T. J. Myers, Director, Nuclear Services T. D. Murray, Superintendent. Davis-Besse Others as designated by the licensee.
NOTE: Attendance by NRC personnel atithe meeting should be made known by COB November 30, 1983, by telephone call to I. N. Jackiv, FTS 388-5697.
Distribution:
E. Blackwood, Executive Coordinator for R-gional Operations, DEDROGR R. C. DeYoung, Director, Inspection and Enforcement J. M. Taylor, Deputy Director, Of fice of Inspection and Enforcement E. L.~ Jordan, Director, Division of Emergency Preparedness and Engineering Response J. A. Axelrad, Director, Enforcement Staff, IE J. Lieberman, Director and Chief Counsel, Regional Operations and Enforcement, ELD J. Stolz, Chief, Operating Reacto s Branch No. 4 J. G. Partlow, Acting Director, Quality Assurance, Safeguards and Inspection Programs, IE A. DeAgazio, Operating Reactor Project Manager
A November 23, 1983 Docket No. 50-346 Toledo Edison Company AITN: Mr. Richard P. Crouse Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:
This confirms our discussion with your staff rescheduling the November 29, 1983 meeting to December 1, 1983, at 10:30 a.m. (CST) as the date and time to conduct an Enforcement Conference with you and members of your staff at the NRC Region III office in Glen Ellyn, Illinois. This Enforcement Conference concerns the results of the Appendix R (Fire Protection) inspection.
We will gladly discuss any questions you may have concerning this matter.
Sincerely,
" Original Signed By W. D. Shafer" C. E. Norelius, Director Division of Project and Resident Programs ec: T. D. Murray, Station Superintendent DMB/ Document Control Desk (RIDS)
Resident Inspector (RIII)
Harold W. Kohn, Ohio EPA James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health
'~
K,n LJ f
[
RII1
- p.RIIIg' RI 1Shapg, II }gj
}'
Jack w r1 Sp qa44 4.>
. br..
- '> iu23/83 f -9.
/