ML20133B480

From kanterella
Jump to navigation Jump to search
SER Re Review of Tech Spec 3/4.7.1, Standby Svc Water Sys. Recommends Action Paragraph Be Modified to Read as Listed. SALP Input Encl
ML20133B480
Person / Time
Site: Grand Gulf 
Issue date: 03/21/1984
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19276B572 List: ... further results
References
FOIA-84-459 NUDOCS 8507200305
Download: ML20133B480 (2)


Text

,

_.s SAFETY EVALUATION REPORT GRAND GULF TECHNICAL SPECIFICATION 3/4.7.1 STANDBY SERVICE WATER SYSTEM AUXILIARY SYSTEMS BRANCH By letter dated September 9, 1983, the applicant requested changes to the Grand Gulf Technical Specification No. 3/4.7.1, " Standby Service Water System."

We have reviewed the requested changes and find th e m, t o b e acceptable with the following modifications.

Paragraph 3.7.1.1 starts with the word "The" and should start with the phrase "Each of the following."

Action paragraph e should be modified to read as follows.

"In all Operational Conditions with the SSWS subsystem inoperative, declare the associated diesel generator inoperative and take the ACTION required by Specification 3.8.1.2.

The provisions of Specification 3.0.3 are not applicable."

Paragraph 4.7.1.1 starts with the words "The req 0 ired" and should start with the phrase "At least the above required."

i 8507200305 850515 PDR FOIA BELL 84-459 PDR

_ ~

1

'f.

SALP INPUT Plant:

Grand Gulf Nuclear Station 1.

Management Involvement and Control in Assuring Quality:

Category 3 2.

Approach to Resolution of Technical Issues from a Safety Standpoint:

Category 2 3.

Responsiveness to NRC Initiatives:

Not Applicable 4.

Enforcement History:

Not Applicable a

5.

Reporting and Analysis of Reportable Events:

Not Applicable 6.

Staff (Including Management): Not Applicable 7.

Training and Qualification Effectiveness:

Not Applicable The following is the narrative for Items 1 and 2 above.

. The applicant has proposed modifications to a technical specification which, for the most part, brings the Grand Gulf specification in line with the standard. This modification should have been made daring the original technical specification review time.