BAY 151965 p, (4 Ms. Nina Bell Nuclear Information and Resource Service 1346 Connecticut Avenue, NW, 4th Floor IN RESPONSE REFER Washington, DC 20036 TO F01A-84-459
Dear Ms. Bell:
This is in further response to your letter dated June 1,1984, in which you requested, pursuant to the Freedom of Information Act (F0IA), two categories of documents relating to operation of the Grand Gulf nuclear power reactor and the Transamerica Delaval, Inc., diesel generators in use at the Grand Gulf nuclear power plant.
The documents listed on the enclosed appendices B and C are responsive to your request. Appendix B documents are being placed in the NRC's Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, in file folder F01A-84-459 for your inspection and copying. The documents listed on enclosed Appendix C have previously been made available for inspection and copying at the PDR. Access to these documents may be acquired by referring to the accession number listed by each of these documents.
Several remaining documents are undergoing review for a disclosure determi-nation.
You will be notified upon completion of the review.
Sin (rely,
!gp
. M. Felton, Director Division of Rules and Records Office of Administration
Enclosures:
As stated
$gg720g6050515 DELLG4-459 PDR k
F
~
Re: F01A-85-459 APPENDIX 8 l
1.
03/03/84 News Article - Mississippi Power Not Sure if Review Will DelayStartup(1page) 2.
03/07/84 Memo to W. V. Johnston, J. Knight, D. Muller, R. Houston, L. Rubenstein and W. Russell from Thomas Novak Re: Review of Proposed Changes to the Grank Gulf Technical Specifications j
(1page) f 3.
03/08/84 News Article - N-Plant's Manual Reviewed by Panel and Watchdog Commission Reviews N-Plant Manual (1 page) 4.
03/08/84 Memo to F. Miraglia, L. Rubenstein, F. Rowsome, and R. Houston I
from Thomas Novak Re: Review of Onsite/Offsite Power Enhancement Program for Grand Gulf Unit I w/ attachments Ltr. dated 2/24/84 to J. Richard and Ltr. dated 2/26/84 to Mr. Denton (29 pages) 5.
03/12/84 Handwritten Notes Re: Suspended or Revoked License (1 page) 6.
03/12/84 Memo to Darrell Eisenhut from Richard Vollmer Re: Grand Gulf Technical Specifications w/ enclosures Sections Reviewed and Coments Regarding Revisions (7 pages) 7.
03/12/84 Memo to Darrell Eisenhut from Roger Mattson Re: Grand Gulf Technical Specifications Re-Review w/ enclosures Sumary Listing, Annotated Index and Detailed Results (67 pages) 8.
03/16/84 Memo to Harold Denton from Hugh Thompson Re: Grand Gulf Technical Specifications w/ enclosure Tech Spec (6 pages)
...wg.j,.,03ri6/84' 'MdM 'tir Thokas'floval TroWRfillsn RusselY1bi:' tenriTEh'N "# '
Specification Changes, Administrative Controls w/ enclosures Safety Evaluation and SALP Input (4 pages) 10.
03/16/84 Memo to Tho~ias Novak fron Willian Russell Re: Technical Specification Changes, Administrative Controls w/ enclosures Safety Evaluation and SALP Input (4 pages) 11.
03/16/84 Note to H. Denton from T. Novak Re: Grand Gulf Tech Specs w/ enclosure Listing of the Tech Spec Changes (44 pages) 12.
03/19/84 Memo to H. Denton, E. Case, R. Mattson, D. Eisenhut and R. Purple from Thomas Novak Re: MP&L Proposal to Restart Grand Gulf I w/ enclosure Ltr. from MP&L dtd. 3/18/84 to Denton (5 pages)
- 13. 03/20/84 Memo to Thomas Novak from R. Wayne Houston Re: Review of Onsite/Offsite Power Enhancement Program for Grand Gulf Unit 1 (1 page) k
F
-2 Re: F0!A-85-459
- 14. 03/20/84 Meeting Sumary Distribution w/ enclosures Ltr. dtd. 3/20/84 from L. Kintner w/ enclosures List of Attendees and Information Received from Licensee (8 pages)
- 15. 03/21/84 Memo to Thomas Novak from L. Rubenstein Re: Prioritization of Changes to Grand Gulf Technical Specifications w/ enclosures Various Letters and Technical Specification (9 pages) 16.
03/21/84 Memo to Mississippi Power & Light Company from M. Houston Re:
Sumary of March 9,1984, Meeting with MP&L to Discuss Technical Specification Review Program w/ enclosures Meeting Attendees, Tech Specs Review and Objectives j
(14pages)
- 17. 03/21/84 Memo to Thomas Novak from L. Pubenstein Re: Grand Gulf Technical Specifications Change w/ enclosure Safety Evaluation Report (3 pages) 18.
03/22/84 Memo to E. Adensam frorr B. Sheron Re: Review of Grand Gulf Problem Sheets w/ enclosure List of Items (3 pages) 19.
03/23/84 Memo to Elinor Adensam from Frank Congel Re: Grand Gulf Technical Specification w/ attachment Safety Evaluation Report (5pages) 20.
03/27/84 Letter to Victor Gilinsky Re: Grand Gulf Technical Specifications (2 pages) 21.
03/27/84 Memo to Thomas Novak from R. Houston Re: CSB Related Input Re:
Prioritization of Mississippi Power & Light's Technical Specification Problem Sheets for Grand Gulf w/ enclosures
....l.tr. 4,td,.,11/3/83,,to,T. yogak ang,Ltrgdthp3,/,01f83t,o.,,,,.
m,...-
y,.,
4 C. Tliomas U tiagesf 22.
03/27/84 Memo to Thomas Novak from William Russell Re: Changes to Grand Gulf Technical Specifications (2 pages) 23.
03/30/84 Memo to Thomas Novak from R. Wayne Houston Re: ICSB Review of Proposed Technical Specification Changes for Grand Gulf Unit 1 (1page)
- 24. 03/30/84 Memo to Frank Miraglia from Thomas Novak Re: Review of Grand Gulf Technical Specification Program (1 page) 25.
03/30/84 Memo to Thomas Novak from R. Wayne Houston Re: Review of Onsite/0ffsite Power Enchancement Program for Grand Gulf Unit I w/ enclosure Onsite/0ffsite Power Supply Reliability (7 pages)
- 26. 04/02/84 Note to Tim Collins and Others Re: Robert Capra Re: Meeting with MP&L to Discuss the Results of NRR's Re-Review of Grand Gulf 1 Technical Specifications w/ enclosures RSB Coments.
ASB Review PSB Coments and Various Tables (23 pages)
F
-3 Re: F01A-8S-459
- 27. 04/02/84 Memo to Thomas Novak from R. Wayne Houston Re: Grand Gulf Technical Specification Changes w/ enclosure Safety Evaluation Report (7pages)
- 28. 04/04/84 Memo to Elinor Adensam from George Lear Re: Review of Proposed Changes to Technical Specifications (2 pages)
- 29. 04/04/84 Memo to Thomas Novak from William Russell Re: SER Input for Proposed Change to Grand Gulf Technical Specification Regarding Control Room Temperature Limit w/ enclosure HFB SER Input (4 pages) 30.
04/09/84 Memo to Thomas Novak from L. Rubenstein Re: Re-Prioritization of Changes to Grand Gulf Technical Specifications (1 page) 31.
04/09/84 Note to R. Mattson and Others from M. Dean Houston Re: Change in Meeting on Grand Gulf Power Reliability (1 page) 32.
04/09/84 Memo to Elinor Adensam from M. Houston Re: Forthcoming Meeting with Mississippi Power & Light Company Regarding TDI Diesel Generators w/ enclosure Agenda (3pages) 33.
04/10/84 GGNS Tech Spec Change Listing (3 pages)
- 34. 04/10/84 Note to B. Youngblood from W. Butler Re: CSB Related Input Re:
Identification of MP&L Technical Specification Problem Sheets That Need Resolution for Low Power Operation w/ enclosure Technical Specification Problem Sheet (3 pages) 35.
04/12/84 Memo to Thomas Novak from R. Wayne Houston Re: ICSB Review of Proposed Technical Specification Changes for Grand Gulf w/ enclosures ICB's Evaluation and ICSB SALP Input (11 pages)
- * ^
ra
- 36. ^04/12/84 Wmd t'o'El'1'66P'Adsfisis fF66*Ko'ber't toinik Re: fviiuitioM81 Proposed Snubber Technical Specification Changes for Grand Gulf w/attachnent Technical Specification Changes (3 pages) 37.
04/12/84 Memo to Thonas Novak from L. Rubenstein Re: Re-Prioritization of Problen Sheets Associated with Grand Gulf Technical Specifications (1 page)
- 38. 04/12/84 Memo to Elinor Adensam from Robert Bosnak Re: Evaluation of Proposed Snubber Technical Specification Changes for Grand Gulf w/ attachments Evaluation, Ltr. dtd. 4/13/84 to T. Novak, Tech Specs, Memo dtd. 4/13/84 to T. Novak and ICSB'S Evaluation (27 pages)
- 39. 04/13/84 Note to Grand Gulf 1 TS Reviewers from R. Capra Re: Response to Questions Asked by H. Denton Regarding Grand Gulf 1 TS Order w/ enclosures Problem Shetts (19 pages)
- 40. 04/16/84 Note to Grand Gulf 1 TS Reviewers from R. Capra Re: Concurrence or Revisions in SER for Grand Gulf TS Order (1 page)
4-Rei FOIA-85-459
- 41. 04/18/84 Memo to Darrell Eisenhut from Roger Mattson Re: Grand Gulf 1 -
Inconsistencies in FSAR VS AS-Built Plant w/ enclosures Inconsistencies Within the DSI Scope of Responsibility (4 pages)
- 42. 04/18/84 Note to D. Eisenhut from Thomas Novak Re: Informing Commission Technical Assistants of Plan to Issue Grand Gulf Order (1 page)
- 43. 04/19/84 Memo to James O'Reilly from Darrell Eisenhut Re: Possible Enforcement Action Regarding Grand Gulf w/ enclosure Inconsistencies:
FSAR vs. As-Built Plant (3 pages)
- 44. 04/25/84 Memo to D. Muller, W. Johnston, J. Knight, R. Houston, L. Rubenstein and W. Russell from Thomas Novak Re: Grand Gulf Technical Specification Review w/ enclosures MP&L Technical Specification Problem Sheets and MP&L Response to NRC Concerns (93pages)
- 45. 05/01/84 Handwritten Notes Re: Grand Gulf Full Power Issues (I page)
- 46. 05/01/84 Grand Gulf Full Power Issues (1 page)
- 47. 05/01/84 Memo to Thomas Novak from L. Rubenstein Re: Prioritization of Problem Sheets for Full Power Operation of Grand Gulf w/ enclosure Ltr. dtd. 04/09/84 to Thomas Novak (2 pages)
- 48. 05/09/84 Memo to Thomas Novak from William Johnston Re: Grand Gulf Technical Specification Review (2 pages)
- 49. 05/10/84 fieno to Thomas Novak from L. Rubenstein Re: Review of Onsite/
Offsite Power Enhancement Program for Grand Gulf 1 (1 page)
.,......,.5 0.,.a i05/10/84.MenotoT.NovakandL.RubenstejnfrqmFrankRowsomefe:
.....Gra'60'Gdi f V0lnddbTil t' ' 'tVCore dir6ge' Dde' fo~TCTI' [flesel ' ' '
v....
y Failures w/ enclosure Grand Gulf Station Blackout Risk Assessment (19 pages)
- 51. 05/18/84 Justification for Disassenbly, Specific Concerns, Engine Inspections - Various Notes (11 pages)
- 52. 05/18/84 Memo to William Dircks from Victor Gilinsky Re: Grand Gulf Electrical Power Supplies w/ enclosure Control Sheet to Dircks fromGilinsky(2pages)
- 53. 05/24/84 Memo to the Commission from William Dircks Re: Grand Gulf Electrical Power Supplies (1 page)
- 54. Undated Note to E. Eisenhut from E. Adensam Re: Trandmittal of BN'S on TDI DG ' Issues to the Comission on Grand Gulf (1 page)
(
- 55. Undated GGNS Tech Spec Change Listing (3 pages)
I l
1 l
~
Re. FOIA-85-459
- 56. Undated Memo to W. Johnston, J. Knight, R. Houston, L. Rubenstein and W. Russell from Thomas Novak Re: Grand Gulf Technical SpecificationReview(2pages)
- 57. Undated Grand Gulf Tech Spec Changes (2 pages)
- 58. Undated Technical Specification Problem Sheets (64 pages) l
- 59. Undated Table 1 Grand Gulf License Amendments (3 pages)
- 60. Undated Steps to Resolve Grand Gulf Technical Specification Changes l
w/ enclosures Sheets with Various Topics (9 pages)
- 61. Undated Handwritten Notes Re: Steps to Resolve Grand Gulf Technical Specification Changes (2 pages)
- 62. Undated Handwritten Notes Re: Slide for TS Briefing (2 pages)
- 63. Undated Grand Gulf Nuclear Station Tecn Spec Review Program w/ enclosure Ltr. dtd. 3/8/84 to Mr. Denton from L. Dale Re:
Technical Specifications and FSAR Certification w/ enclosure Audit of Nuclear Plant Technical Specifications (29 pages)
- 64. Undated Tech Spec Problem Sheet Priority Definitions (2 pages)
- 65. Undated Letter to J. Richard from Thomas Novak Re: Grand Gulf Technical Specifications Review w/ enclosure Handwritten Notes Re: TS Resulting from Earlier Review (8 pages)
- 66. Undated Handwritten Chart Re: Safety Significance Categories (3 pages)
' ' ' 67. U'nd'ated ' ' Ha'ndwTritibn' Nofss Ne":Resulis' of NYlR'P'rl'oriMz'$t' ion h$few
~'
of Licensee Problem Sheet (1 page) 60.
Undated Status of NRC Concerns (15 pages)
- 69. Undated Results of R II Review of TS Problem Descriptions as of April 11, 1984 (1 page)
- 70. Undated Technical Specifications w/ enclosures Various Other Topics (40pages)
- 71. Undated GGNS Tech Spec Change Listing (3 pages)
- 72. Undated NRC Concerns Not Defined in Problem Sheets (2 pages)
- 73. Undated NRC Concerns Not Defined in Problem Sheets (2 pages)
6 Re: F01A-85-459
- 74. Undated Handwritten Note to Darrell Eisenhut Re: Power Level (1page)
- 75. Undated Handwritten Notes Re: Grand Gulf Review (3 pages) 76.
Undated Handwritten Notes Re: Prioritization Results (1 page)
- 77. Undated Handwritten Notes Re: Telecon of J. Starling w/ enclosure Technical Specifications Sorted by Technical Specification (12pages)
- 78. Undated Priority IB Items Previously Submitted to NRC (2 pages) 79.
Undated Priority IB Items to be Submitted to NRC (2 pages)
- 80. Undated Technical Specification Problem Sheet (2 pages) 81.
Undated Technical Specification Problem Sheet (2 pages)
- 82. Undated Technical Specification Problem Sheet (2 pages) 83.
Undated Technical Specification Problem Sheet (1 page) 84.
Undated Technical Specification Problem Sheet (2 pages) 85.
Undated Technical Specification Problem Sheet (2 pages) 86.
Undated Technical Specification Problem Sheet (2 pages) 87.
Undated Handwritten Notes Re: Conments on Grand Gulf Technical Specification Problen Sheets - Core Performance Branch (10pages.)
s.
88.
Undated Handwritten Notes Re: Continuous Burn (1 page) 89.
Undated Handwritten Notes Re: Hydrogen Control System (2 pages) 93.
Undated Handwritten Chart Re: Grand Gulf Green Tickets (1 page) 91.
Undated Plan for GG Full Power License Amendment For TS Changes (1page)
- 92. Undated Handwritten Note Re: FollowuptotheSALP(1page)
- 93. Undated Handwritten Notes Re: Grand Gulf Status Report April 30, 1984 (12pages) 94.
5/31/84 Note to T. Novak from E. Adensam Re: Grand Gulf Green Tickets w/ enclosure Grand Gulf Green Tickets (3 pages)
.y.
Re: F01A-85-459
- 96. Undated Telecon Note from J. Hannon Re: Integrated Living Schedule (1 page) b
- 97. Undated Grand Gulf Status Report April 30,1984(12pages)
- 98. Undated Grand Gulf Open Items (1 page)
- 99. Undated Grand Gulf Open Items Full Power License (2 pages) 100. Undated Grand Gulf Open Items (1 page) 101. Undated Handwritten Notes Re: StaffingConcerns(2pages) 102. Undated Grand Gulf Open Items (1 page) j 103. Undated Grand Gulf Ooen Items (1 page) i 104. Undated Grand Gulf Open Items (1 page) i 105. Undated Footnotes - Section 2 FSAR Inconsistencies (12 pages)
I 106. Undated Sketch Sheet Re: FSAR and SER (1 page) 107. Undated - Matrix Footnotes Sorted for FSAR Discrepancies (1page) 108. Undated Handwritten Notes Re: FSAR vs. As Built in General Agreement
(
(1page) 109. Undated - Matrix Footnotes Sorted by FSAR vs. As-Built Discrepancies w/ enclosure Inconsistencies; FSAR ys. As-Built
... Planf ( 3 'p' age s )' '
110. Undated Memo to Elinor Adensam from M. Houston Re: Forthcoming Meeting with flississippi Power & Light Company (1 page) 111. Undated Grand Gulf Diesel Position (1 page) 112. Undated Grand Gulf Technical Specifications Review (4 pages) 113. Undated Letter to J. McGaughy Re: NRC Staff Review and Processing of Grand Gulf Technical Specification Changes for a Full Power License Amendment w/ enclosure Control Sheet (2 pages) 114. Undated Licensing Status of Grand Gulf 1 (6 pages) 115. Undated Grand Gulf Unit 1 Significant Issues (2 pages) l
r
' Re: FOIA-85-459 116. Undated Grand Gulf Full Power Issues (1 page) 117. Undated Licensing Status for Grand Gulf 1 (6 pages) 118. Undated Grand Gulf Green Tickets (2 pages) 119. Undated Grand Gulf Green Tickets (1 page) 120.
Undated Handwritten Notes Re: Green Tickets Comparison of Inquiries w/ enclosure Ltr. to Edward Market from N. Palladino (3 pages) 121. Undated Letter to J. McGaughy from Thomas Novak Re: Certification of Grand Gulf Technical Specifications and As-Built Plant (2 pages) 122. Undated MPL Information Regarding Grand Gulf Technical Specification Changes w/ enclosure Licensee Information (4 pages) 123. Undated Licensee Information Regarding Grand Gulf Technical Specification Change Priorities (2 pages) 124. Undated Status of Technical Specifications Review (1 page) 125. Undated Handwritten Memo to E. Adensam Re: Status Report in Review of Grand Gulf Technical Specification Changes w/ enclosure Table (5pages) 126.
Undated MP&L Priority 1 Problem Areas in T.S. (1 page) 127. Undated Technical Specification Problem Sheets (22 pages) 128., Undated Technical Specifica, tion Problen Sheets, (26 pages) 129. Undated Order Requiring Diesel Generator Inspections (5 oages) 13').
Undated Letter to J. McGaughy from T. Novak Re: NRC Staff Review and Processing of Grand Gulf Tech Spec Changes for a Full Power License Amendment w/ enclosure Handwritten Notes Re: Procedure for Review of MP&L TS Changes (4 pages) 131. Undated Second page of letter from Thomas Novak (1 page) 132. Undated - Procedure for Review of MP&L Technical Specification Changes (1 page) 133. Undated Second page of letter from Thomas Novak (1 page) 134. Undated Memo to Edson Case from T. Rehm Re: Response to Markey Questions of March 13,1984(1page) 135. Undated Memo to Edson Case from T. Rehm Re: Response to Markey Questions of March 13, 1984 (1 page)
r
~'~
Re: FOIA-85-459 136.
Undated Handwritten Notes Re: Slide for TS Briefing (1 page) 137. Undated Handwritten Notes Re: Processin Specification Changes (2 pages)g of Grand Gulf Technical 138. Undated Handwritten Notes Re: Grand Gulf TS w/ enclosure MP&L Priority 1 Problem Areas in T.S. (3 pages) 139. Undated Handwritten Notes Re: Comparison of 3/9/84 MTG MPL Potential TS Changes (1 page) 140. 03/20/84 Chronology of Grand Gulf Technical Specification Development j
(1page) i 141. 04/09/84 Evolution of GGNS Technical Specifications (2 pages) 142. Undated Facsimile Transmittal Request to D. Kerrelli from E. Adensam w/ enclosure Tech Spec Changes (8 pages) 143. 04/19/84 Table 1 from MP&L (1 page) 144. 05/04/84 Contributing Factors to Technical Specification Inconsistencies (1page) 145. 04/28/84 Problem Sheet Listing (12 pages) 146. Undated Technical Specification Problem Sheet (10 pages) 147.
Undated Handwritten Sunnary Sheet w/ enclosure Problem Sheet Listing (13pages) 148.
02/27/84 !!emo to Thomas Novak from Frank Miraglia Re: Grand Gulf Operating Experience w/ enclosure Operating Experience Review (7 pages) 149.
03/21/84 Summary of March 9,1984, Meeting with !!P&L to Discuss Technical Specification Review Program w/ enclosures Meeting Attendees and Tech Spec Review Program (14 pages) 150.
03/29/84 Memo to Thomas Novak from Frank Schroeder Re: Review of Mississippi Power and Light Company's Proposed Station Blackout Risk Assessment for Grand Gulf Unit I w/ attachment Evaluation (7pages) 151. 03/30/84 Memo to Frank Miraglia from Thomas Novak Re: Review of Grand Gulf Technical Specification Program w/ enclosures Summary of March 9, 1984. Meeting Attendees and Tech Spec Review Program (37pages)
' Re: F01A-85-459 152. 04/10/84 Note to B. Youngblood from W. Butler Re: CSB Related Input Re: Identification of MP&L Tech Spec Problem Sheets that Need Resolution for Low Power Operation w/ enclosure Technicia Specification Problem Sheet (3 pages) 153. 04/10/84 Memo to W. Johnston, J. Knight, R. Houston, L. Rubenstein and W. Russell from Thomas Novak Re: Grand Gulf Technical Specification Review w/ enclosures MP&L Priority 1 Problem Areas and SER Format (4pages) 154. 04/12/84 Memo to Thomas Novak from R. Wayne Houston Re: ICSB Review of Grand Gulf Unit 1 Problem Sheets (1page) 155. 04/16/84 Memo to Thomas Novak from R. Wayne Houston Re: ICSB Review of Proposed Technical Spe ification Changes for Grand Gulf L' nit I w/ enclosure ICSB's Evaluation (14pages) 156. 04/17/84 Memo to Elinor Adensam from William Gammill Re: Proposed Amendment to Operating License for Grand Gulf (1page) 157. 04/25/84 Note to Tom Novak from Frank Rowsome Re: Grand Gulf Diesel Order (2 pages) 158. 05/01/84 Memo to T. Novak from L. Rubenstein Re: Review of Grand Gulf Tech Spec Problem Areas for Power Operation Exceeding 5 Percent Power (1page) 159.
05/02/84 Memo to Thomas Noval from William Russell Re: Review of Grand Gulf Technical Specifications Changes (2 pages) 160. 05/03/84 Memo to E. Adensam from M. Srinivasan Re: Status of PSB Items - Grnad Gulf Tech Spec Review Meeting April 27, 1984 (2 pages) 161.
05/03/84 Meno to Thomas Novak from Daniel Muller Re: Review of Grand Gulf Tech Spec in the Rets Area Relative to Your Memo of April 25, 1984 (2 pages) 162. 05/03/84 Memo to Thomas Novak from Daniel Muller Re: Review of Grand Gulf Tech Spec in the Rets Area Relative to Your Memo of April 25, 1984 w/ enclosures Various Memos to T. Novak (16 pages) 163. 05/04/84 Memo to Thomas Novak from William Johnston Re: Grand Gulf Technical Specification Review (1page) 164.
05/17/84 Memo to Elinor Adensam from Robert Bosnak Re: Evaluation of Proposed Snubber Technical Specification Changes for Grand Gulf w/ attachment Evaluation of Tech Spec Changes (6 pages)
' Re: FOIA-85-459
{
165. 05/18/84 Memo to Thomas Novak from R. Wayne Houston Re: Review of to May 6,1984 Letter from Mississippi Rower
& Light w/ enclosure Memo dtd. 5/11/84 to Thomas Novak (5 pages) 166. 05/22/84 Memo to Thomas Novak from L. Rubenstein Re: Revised Interim Technical Specifications for Diesel Generators and Gas Turbine Generators at Grand Gulf - SER w/ enclosure Safety Evaluation
~
Report (5pages) 167. 05/23/84 Memo to Hugh Thonpson from Lawrence Crocker Re: Evaluation of Grand Gulf Shift Advisors w/ enclosure Evaluation of Shift Advisors (31pages) 168. 06/01/84 Memo to Elinor Adensam from L. Kintner Re: Status Report on Review of Grand Gulf Technical Specifications w/ enclosure Requests for Tech Spec Changes (9 pages) 169.
06/05/84 SER Water Ensin Transfer Capability Evaluation (6 pages) 3 170.
05/10/84 Memorandum for the Comission from William J. Dircks, subject: Grand Gulf Restart Decision (3 pages) 171.
03/28/84 Memorandum for the Comission from William J. Dircks, subject: LER Data on Personnel Errors (31 pages)
, 7 Re: F01A-85-459 APPENDIX C 1.
02/24/84 Letter to J. B. Richard from Darrell Eisenhut Re: Grand Gulf x
Unit 1 Technical Specificatiens Acc. No. 8403070354 (1 page) 2.
03/1984 Grand Gulf Nuclear' Fover Plant Audit of Nuclear Plant Technical Specifications by J. M. Fehringer, H. C. Rockhold and T. L. Cook Acc. No. 8403260335(17pages) 3.
03/27/84 Memo to William Dircks from Samuel Chilk Re: Briefing on Grand Gulf Technical Specification Requirements Acc. No. 8404090479 (1 page) 4.
03/28/84 Memo to Elinor Adensam from L. Kintner Re: Forthcoming Meeting with Mississippi Power & Light Company Regarding Grand, Gulf Nuclear Station, Unit 1 Acc. No. 8404170251 (1 page)
~
5.
04/04/84 Memo to Elinor Ademsam from M. D. Houston Re: Forthcoming Meeting with Mississippi Power & Light Company Regarding On-Site Reliability Acc. No. 8404130390(1page) 6.
04/18/84 Letter to J. P. McGaughy from Elinor Ademsam Re: Issuance of Order Restricting Conditions for Operation w/ enclosure Order Acc. No. 8404300291 (113 pages) 7.
04/19/84 Memo to Commissioners from William Dircks Re: Grand Gulf Operating Experience Acc. No. 8405150426 (2 pages) 8.
04/19/84 Letter to Harold Denton from J. P. McGaughy Re: Grand Gulf Nuclear Statien Units 1 and 2 Acc. No. 8404250026 (2 pages) 9.
04/25/84 Letter to J. P. McGaughy from Elinor Adensam Re: Grand Gulf Unit 1 Technical Specifications Review w/ enclosure NRC Concerns Not Defined in Problem Sheets Acc. No. 8405210489 (6 pages)
(
- 10. 04/25/84 Letter to J. P. McGaughy from Elinor Adensam Re: Grand Gulf Unit 1 Technical Specifications Review w/ enclosure NRC Concerns Not Defined in Problem Sheets Acc. No. 8405210489(5pages)
- 11. 04/30/84 Letter to Office of Inspection & Enforcement from R. E. Boyer Re: Potential 10 CFR 21 Problem Acc. No. 8405010370 (1page)-
12.
05/03/84 Memo to William Dircks from Victor Gilinsky Re: Grand Gulf Restart Decision Acc. No. 8405220322(1page)
- 13. 05/14/84 Letter to Nunzio Palladino from Gillespie Montgomery Re: Grand Gulf Nuclear Station Acc. No. 8407110456 (1 page)
- Re: FOIA-85-459
- 14. 05/22/84 Letter to-J. P. McGaughy from Elinor Adensam Re: Issuance of Order Requiring Diesel Generator Inspection w/ enclosure l
Order Acc. No. 8406040294 (42 pages)
- 15. 05/25/84 Letter to Mr. Denton from L. F. Dale Re: Grand Gulf Nuclear Station Units 1 and 2 Acc. No. 8405300464 (1 page)
- 16. 05/30/84 Memo to James O'Reilly from Darrell Eisenhut Re: Possible Enforcement Action Regarding Grand Gulf Acc. No. 8406070125 (1page) j i
- 17. 05/30/84 Memo to Comission from Herzel Plaine Pe: Staff's May 22, 1984 Order in Grand Gulf Acc. No. 8501180260 (8 pages)
- 18. 05/31/84 Note to Carlton Kammerer Re: Response to Inquiries w/ enclosures l
Ltr. to Wm. C11fford Smith dtd. 05/31/84,:Ltr. to Bennett Johnston dtd. 05/18/84 and Licensing Status Report Acc. No. 8408070048 (7 pages)
- 19. 05/31/84 Letter to Nunzio Palladino from Edward Markey Re: Grand Gulf l
Nuclear Station Acc. No. 8408080432 (2 pages) 4 20.
06/03/84 Letter to Harold R. Centon, f rom J. G. Cesare, sutdect-Grand Gulf Nuclear Station Unit 1, MP&L Response to Generic Letter 84-11 Acc. ho. 8406070201 (9 pages) l l
21.
.02/02/84 Memo to Comissioner Gilinsky from William Dircks Re:
Preparation of Technical Specifications w/ enclosures Procedures Used for Preparation of Tech Specs for New Operating Licenses and Preparation of Grand Gulf Tech Specs Acc. No. 8402090594 (6 pages) l 22.
03/02/84 Memo to William Dircks from Samuel Chilk Re: Briefing on Status of Grand Gulf Acc. No. 8403120934 (1 page) j 23.
03/02/84 Memo to William Dircks from Samuel Chilk Re: Briefing on i
Status of Grand Gulf Acc. No. 8403120034 (1 page) i 24.
04/11/84 Memo to Thomas Novak from Frank Miraglia Re: Adequacy of Grand Gulf Technical Specification Review Program and its I:nplementation w/ enclosure Evaluation of Tech Specs Acc. No. 8404250061 (7 pages) 25.
03/24/84 Transcript of Proceedings - Discussion of Grand Gulf Diesel l
Generator Inspection Order Acc. No. 8406020342 (61 pages) 26.
06/01/84 Discussion of Grand Gulf Order Acc. No. 8406110112 (59 pages) 27.
06/04/84 Letter to Harold Denton Re: Grand Gulf w/ enclosures Affidavit, Offsite/Onsite AC Power Supplies and FSAR Chapter 15 Evaluation Acc. No. 8406060026 (24 pages) i t
s-( [> ^\\,'. <
Ll.
/
3
[-] l hN"I-.
~
\\ucear In"ormation and Resource Service 1346 Connecticut Avenue NW. 4th Floor. Washin( cn. D.C. 20036 (202)296-7552 June 1, 1984 James M. Felton, Director Division of Rules and Records Office of Adminstration MEDOM OF INFORMATION U.S. Nuclear Regulatory Commission ACT REQUEST Washington, D.C. 20555
)COTA.g y, 9
FREEDOM OF INFORMATION ACT REOUEST Jg g g.g
Dear Mr. Felton:
Pursuant to the Freedom of Information Act, 5 U.S.C. 522, as amended, the Nuclear Information and Resource Service re-quests the following documents regarding the Grand Gulf nuclear plant.
Please consider " documents" to include reports, studies, test results, correspondence, memoranda, meeting notes, meeting minutes, working papers, graphs, charts, diagrams, notes and summaries of conversations and interviews, computer records, and any other forms of written communication, including internal NRC Staff memoranda.
The documents are specifically requested from, but not limited to, the Office of Inspection and Enforcement (IEE); Office of the Executive Legal Director (OELD); Office of Analysis and Evaluation of Operational Data (AEOD); Office of Nuclear Regulatory Research (Research); Office of Nuclear Reactor Regulation (NRR); Generic Issues Branch of the Division of Safety Technology, NRR; Office of the General Counsel (OGC); and the Operating Reactors Branches of the Division of Licensing.
In your response, please identify which documents correspond to which requests below.
Pursuant to this request, please provide all documents pre-pared or utilized by, in the possession of, or routed through the NRC related tot
- 1. Operation of the Grand Gulf nuclear power reactor produced since January 1, 1984, including operation with the Transamerica Delaval Inc. diesel generators; and
- 2. The Transamerica Delaval Inc. diesel generators in use at the Grand Gulf nuclear power plant.
In our opinion, it is appropriate in this case for you to waive copying and search charges, pursuant to 5 U.S.C.
552 (a) (4) ( A) "because furnishing the information can be considered as primarily benefiting the general public."
The G7c 13 / / d /\\
<)
o a viio v u~q5,7
Y.'
e.tw,+
4 2 --
Nuclear Information and Resource Service is a non-profit organization serving local organizations concerned about nuclear power and providing information to the general public.
Since y,
ammo Nina Bell Nuclear Safety Analyst cc: File