July 13,1989 af Docket No. 50-317/318 NEMORANDUM FOR: Robert A. Capra, Director Project Directorate I-I Division of Reactor Projects I/II FROM:
Conrad E. McCracken, Chief Plant Systems Branch Division of Engineering and Systems Technolog:/
SUBJECT:
SAFETY EVALUATION REPORT RELATING TO PROPOSED TECHNICAL SPECIFICATION CHANGES FOR EMERGENCY DIESEL GENERATOR INSPECTION INTERVAL (TAC NOS. 71590 AND 71591)
Plant Name:
Calvert Cliffs Nuclear Power Plant, Units I and 2 Licensee:
Baltimore Gas and Electric Company Review Status:
Complete Enclosed (Enclosure 1) is the Plant Systers Branch Safety Evaluation Report i
relating to the proposed change to Section 4.8.1.1.2d of Calvert Cliffs Technical Specifications. The proposed change wiil extend the frequency of the emergency diesel generator (EDG) inspection requirement from 18 to 24 months.
This will correlate the EDG inspection intervals with the current refueling cycle of every 24 months.
1 Our SALP input is provided in Enclosure 2.
We consider our efforts on TAC Nos. 71590 and 71591 to be complete.
etpel signed tg Conrad E. McCracken, Chief Plant Systems Branch Division of Engineering and Systems Technology
Enclosures:
As stated cc w/ enclosures:
S. McNeil CONTACT: D. Shum X20860 DISTRIBUTION Dccket File Plant File JWermiel JKudrick RArchitzel AThadani LShao 4g TGody (SALP only)
[L
&L.
DShum l j'.
SPLB:DESL, SPLB: DEST SPLB: DEST DShum;cf V -
RArchitzel CMcCracken 7// /89 7//f/89 7/G/89 3
520 NAME: Calvert Cliffs TACs 71590/1 89NZlBQ1623dammt X h &[S/76 3f(1 Y
f$ d