ML20117P732
Text
l
(,
~
Ja a w I
L l
i MEMORANDUM FOR:
Robert A. Capra, Project Director l
Project Directorate I-1 Division of Reactor Projects - I/II i
FROM:
M. W. Hodges, Chief Reactor Systems Branch Division of Engineering & Systems Technology
SUBJECT:
TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT CHANGES ON CEA DROP TIME AND INCORE DETECTION SYSTEM (TAC NOS. 64601 & 64602)
)
Plant Name:
Calvert Cliffs Units 1 and 2 Docket Nos.:
50-317 & 50 318
)
TAC Nos:
64601 1 64602 Project Directorate:
Project Directorate I 1
)
Project Manager:
S. A. McNeil Review Branch:
SRXB/ DEST l
Review Status:
Complete The Reactor Systems Branch has prepared the enclosed evaluation daltimore Gas and Electric Company's prop (osed )
of the January 20, 1987 Technical Specification change request for Calvert Cliffs Units 1 and 2.
The proposed change increases the surveillance interval of Surveillance Requirements 4.1.3.4.c and 4.3.3.2.b on CEA Drop Times and Incore Detection System, respectively, from at least once per 18 months to at least once per 2
refueling interval. The Reactor Systems Branch concludes that the proposed Technical Specification changes are acceptable.
This completes our efforts on TAC Nos. 64601 and 64602.
Our input for a SALP evaluation is provided in Enclosure 2.
M 81Ened W M. W. Hodges, Chief Reactor Systems Branch Division of Engineering & Systems Technology DISTRIBUTION
Enclosure:
As stated Docket File SRXB R/F cc:
L. Shao A. Thadani M. W. Hodges S. Varga S. A. McNeil T. Collins B Boger SRXB Members D. Fieno D. Fieno R/F
Contact:
D. Fieno, SRXB, x27141 j )
Calvert Cliffs P/F
/ (
! )FC :SRA i..... : _4)E.,f...._ _ :.......-.-1%P. :. _ _ _ c S..f :
- SRXB: DEST /
- SRXB:DESTg JAME :DFIEN0:gn
- TCOLLINS
- MWH0DGIS
) ATE :6/5 /87
- 6/s/87
- 6/8/87 OFFICIAL RECORD COPY (
M elSbN