ML20117P777
Text
l
's '
p n
%r JUL 2 81987 MO OtANDUM FOR:
Robert A. Capra, Director Project Directorate I-1 Division of Reactar Projects - I/II FROM:
Jerry L. Mauck, Acting Chief Instrumentation & Control Systems Branch Division of Engineering & Systems Technology
SUBJECT:
SAFETY EVALUATION REPORT FOR ITEM 2.2 (PART 1) 0F MNERIC LETTER 83-28. EQUIPMENT CLASSIFICATION (PROGRAM FOR ALL SAFETY RELATED COMPONENTS) FOR CALVERT CLIFFS > NUCLEAR POWER PLANT, UNITS 182 Plant Name:
Calvert Cliffs Nuclear Power Plant, Units 1&2 Utility:
Baltimore Gas & Electric Company Docket No.:
50-317/318 TAC Nos.:
53659/53660 Licensing Status:
OR Resp. Directorate: PD I-1 Project Manager:
S. McNeil Review Branch:
ICSB l
Review Status:
Complete for this item.
l The licensee was required by Generic Letter 83-28 Item 2.2.1 to describe in j*
considerable detail their program for classifying all safety-related components l
other than RTS components as safety-related on documents and in information i
handling systems that are used to control plant activities that may affect l
these components. The licensee has responded and our review of these responses as documented in the enclosed contractor's report (EG&G-NTA-7427) finds the
,l i
licensee's responses for this item to be acceptable. The enclosed SER documents our concurrence with the contractor's findings and also finds the licensee's responses for this item to be acceptable. We, therefore, consider Item 2.2.1 to be closed by this action. TAC Nos. 53659 and 53660 are not closed by this i
action since Generic Letter 83-28. Item 2.2.2 remains open. SALP input for the l
review of Item 2.2.1 is enclosed.
j i
Jerry L. Mauck, Acting Chief i
Instrumentation and Control Systems Branch j
DivisionofEngjneering&SystemsTechnology
Enclosures:
As stated t
cc: See next page DISTRIBUTION:
4 4
Contact:
D. Lasher (ICSB/ DEST),x28443 J. Joyce J. Mauck
/.
D. Lasher ICSB: DES W I
ST DLasher:W' uck Slf6
,v m
V v
4 Robert A. Capra -
cc w/ enclosure:
l S. Varga l
A. Thah ni S. McNeil 4
1
)
o l
I I
i 4