Special Rept:On 960425,inoperability of loose-parts Detection Sys Channel for More than 30 Day Identified. Work Order Initiated to Inspect Instrumentation
ML20117J975
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/31/1996
From: Boyce R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9606040028
Download: ML20117J975 (2)


Text

...- -- ~ - - . .

. . L. . Robert W.Boycs Plar;t Manager

,, Limerick Generating Station

. . c ,,-

3 PECO NUCLEAR ncoene. c - ev Limerick Generating Station A Unit of PECO Energy PO Box 2300 Sanatoga, PA 19464-0920 610 718 2GB 3

T.S. 3.3.7.10 T.S. 6.9.2 l

t i May 31, 1996 Docket No. 50-352 l- License No. NPF-39 i

i U.S. Nuclear Regulatory Commission i Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Unit 1 i Special Report for th4 Inoperability of a Loose-l' Part Detection System Channel for More Than 30

, Days i:

L This Special Report in being submitted pursuant to the  ;

requirements of Limerick Generating-Station (LGS), Unit 1 l Technical Specifications (TS) Section 6.9.2 as required by  !

TS Section 3.3.7.10, " Loose-Part Detection System." TS

.Section 3.3.7.10 requires that with one or more of the required Loose-Part Detection System (LPDS) channels inoperable for more than 30 days, a Special Report must be prepared and submitted within 10 days outlining the cause of

'the malfunction and the plans for restoring the channel (s) to operable status.

On April 25, 1996, Unit 1 was operating at 88% power with power ascension in progress following a scheduled load drop.

During performance of procedure ST-6-107-590-1, " Daily Surveillance Log /OPCONS 1, 2, 3," a channel check was performed for the eight LPDS channels per TS Surveillance Requirement 4.3.7.10a. At 0215 hours0.00249 days <br />0.0597 hours <br />3.554894e-4 weeks <br />8.18075e-5 months <br /> on April 25, 1996, Operations personnel identified that the channel / detector

which monitors the acoustic level on the Control Rod Drive housing 02-31 was malfunctioning and was subsequently declared inoperable.

This channel malfunction has been isolated to its instrumentation contained within the inerted Unit 1 Primary Containment. A work order has been initiated to inspect the ,

9606040028 960531 2 .f ADOCK 05000352 PDR ,

s PDR. ..

I l

.+

l May 31, 1996 ,

Page Two instrumentation within the Primary Containment during the next Unit 1 outage of sufficient duration.

The malfunctioning channel / detector has no impact on plant operation and no interim corrective actions are necessary. j A supplement to this Special Report will be submitted once i the cause is determined and plans identified for restoring the channel to an operable status.

If you have any questions or require additional information, please contact Mr. James L. Kantner at (610) 718-3400.

Very truly yours, j i

l DMS:cah I cc: T. T. Martin, Administrator Region I, USNRC N. S. Perry, USNRC Senior Resident Inspector, LGS l