ML20203G024

From kanterella
Jump to navigation Jump to search
Special Rept:On 860102,HPCI Sys Actuated & Water Injected Into Reactor Pressure Vessel Through Loop B Core Spray Nozzle Only.No Corrective Action Will Be Taken Since HPCI Operated as Designed to Control Level
ML20203G024
Person / Time
Site: Limerick Constellation icon.png
Issue date: 03/24/1986
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
CON-#286-682 OL, NUDOCS 8604280213
Download: ML20203G024 (2)


Text

,

L,] :-  %

PHILADELPHIA ELECTRIC COMPANY 23ol MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.191o1 (215)841 4000 March 24, 1986 Docket No. 50-352 Dr. Thomas E. Murley, Regional Administrator U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406

SUBJECT:

Special Report - High Pressure Coolant Injection

(HPCI) System Actuations and Injections - Limerick Generating Station - Unit 1

REFERENCE:

Technical Specifications 3.5.1.f and 6.9.2

/

Dear Dr. Murley:

This Special Report is being submitted to meet the requirements of Limerick Generating Station Technical Specifications 3.5.1.f and 6.9.2. Specification 3.5.1.f states, "In the event an ECCS system is actuated and injects water into the reactor coolant system, a Special Report shall be submitted to the Commission pursuant to Specification 6.9.? within 90 days describing the circumstances of the actuation and the total accumulatc. actuation cycles to date. The current value of the usage factor for each affected safety injection nozzle shall be provided in this Special Report whenever its value exceeds 0.70".

Technical Specification 6.9.2 states, "Special Reports shall be submitted to the Regional Administrator of the Regional Of fice of the NRC within the time period specified for each report".

This report concerns the occurrence of one High Pressure Coolant Injection (HPCI) system actuation and injection into the reactor coolant system of Unit No. 1. Below is a description of the HPCI system actuation and injection event.

On January 2, 1986 the High Pressure Coolant Injection (HPCI) system actuated and injected to the reactor pressure vessel. The HPCI was actuated manually to control reactor level following a reactor scram caused by a main turbine trip.

8604280213 860324 PDR ADOCK 05000352 t S PDR.

l 0 yd< p.9

(

d I Dr. Thomas E. Murlcy March 24, 1986 Page 2 Reactor parameters prior to the transient were as follows:

Reactor Power - 3259 MWt Reactor Coolant System Pressure - 1003 PSIG Moderator Temperature - 542 deg. F Core Flow - 98.9 Mlbm/Hr.

Feedwater Flow - 14.1 Mlbm/Hr.

Feedwater Temperature - 426 deg. F Average HPCI flow was approximately 5,600 gpm which operated continuously for approximately 2 minutes. The injection into the reactor pressure vessel was through the "B" loop Core Spray nozzle only. This constitutes the fourth HPCI actuation and injection to date.

The usage factor for this event for the "B" loop Core Spray nozzle is 9.00N6. Since the effect of this HPCI injection on the "B" loop Core Spray nozzle is negligible, the projected usage f actor for this safety injection nozzle, based on the effect of all design transients occurring over the 40 year life of the plant, remains unchanged at 6.07N1. The usage factors for all other safety injection nozzles remain unchanged as a result of this event.

Since HPCI operated as designed to control level, no corrective action is to be taken.

Should you require additional information, please do not hesitate to contact us.

Very truly yours, Q c44_ 1_-

W. T. Ullrich Supe rintendent Nuclear Generation Division cc: E. M. Kelly, Senior Resident Inspector See Attached Service List