Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217G99614 October 1999SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 &VT-2
Incorporated by reference
ML20217H52230 September 1999Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With
BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With30 September 1999Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With
ML20217P63529 September 1999Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear StationsSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20212A74410 September 1999Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & SafetyHydrostatic
VT-2
Incorporated by reference
Finite Element Analysis
Liquid penetrant
BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With31 August 1999Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With
ML20212B92631 August 1999Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With
ML20210R64213 August 1999ISI Outage Rept for A2R07Boric Acid
Hydrostatic
VT-2
Moisture barrier
Liquid penetrant
ML20210U8114 August 1999SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a
ML20210R34331 July 1999Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With
BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With31 July 1999Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With
ML20210K98630 July 1999Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related MovsStroke time
ML20210E22521 July 1999B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
Pressure Boundary Leakage
M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function12 July 1999Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function
ML20216D38412 July 1999Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function
ML20209G1758 July 1999SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09)
ML20209H37130 June 1999Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With
BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With30 June 1999Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With
ML20207H77730 June 1999Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2
ML20207H78530 June 1999Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation
ML20207H79430 June 1999Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation
ML20207H80730 June 1999Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal OperationsAnticipated operational occurrence
Hydrostatic
ML20207H75628 June 1999Pressure Temp Limits Rept (Ptlr)Hydrostatic
Pressure and Temperature Limits Report
ML20207H76228 June 1999Pressure Temp Limits Rept (Ptlr)Hydrostatic
Pressure and Temperature Limits Report
ML20195J80031 May 1999Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With
BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With31 May 1999Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With
ML20209H74831 May 1999Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2
ML20207B64825 May 1999SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station
ML20195B25919 May 1999Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood StationsOffsite Dose Calculation Manual
Process Control Program
ML20206R69930 April 1999Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With
BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With30 April 1999Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With
M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)28 April 1999Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)Shutdown Margin
ML20195C79628 April 1999Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)Shutdown Margin
BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With31 March 1999Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With
ML20205P70031 March 1999Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With
ML20205B50926 March 1999SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2Boric Acid
VT-2
Incorporated by reference
Scaffolding
ML20205C51021 March 1999Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial CorrectionsUltimate heat sink
Offsite Circuit
ML20204G38319 March 1999Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11Boric Acid
VT-2
Incorporated by reference
Scaffolding
M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function17 March 1999Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) FunctionShutdown Margin
ML20206A88317 March 1999Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) FunctionShutdown Margin
ML20196A07216 March 1999Cycle 8 COLR in ITS Format & W(Z) FunctionShutdown Margin
ML20207M92312 March 1999Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results
ML20207J4378 March 1999ISI Outage Rept for A1R07Hydrostatic
VT-2
Liquid penetrant
Scaffolding
ML20204H9943 March 1999Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear StationsSafe Shutdown
Boric Acid
High Radiation Area
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Control of Heavy Loads
Fuel cladding
Liquid penetrant
Overexposure
Affidavit
Depleted uranium
BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With28 February 1999Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With
ML20204C76728 February 1999Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.WithAnnual Radiological Environmental Operating Report
ML20206U90115 February 1999COLR for Braidwood Unit 2 Cycle 7. Page 1 0f 13 of Incoming Submittal Was Not IncludedShutdown Margin
BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With31 January 1999Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With
ML20205M70631 December 1998Unicom Corp 1998 Summary Annual Rept. with