MONTHYEARL-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions1999-10-0404 October 1999 Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity1999-04-30030 April 1999 Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl1999-04-0202 April 1999 Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design ML20069K2781994-06-10010 June 1994 Application for Amends to Licenses NPF-2 & NPF-8,changing RTS & ESFAS Setpoints Associated W/Sg Water Level. Westinghouse Nonproprietary & Proprietary Version of Rept, SG Lower Level Tap... Encl.Proprietary Rept Withheld ML20064C2111994-02-23023 February 1994 Application for Amend to License NPF-2,revising TS, to Allow Implementation of 2 Volt Interim Plugging Criteria 1999-09-15
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARL-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions1999-10-0404 October 1999 Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity1999-04-30030 April 1999 Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl1999-04-0202 April 1999 Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20198R5181997-10-29029 October 1997 Amends 132 & 124 to Licenses NPF-02 & NPF-08,respectively, Changing TS 3/4.4.9, Specific Activity & Associated Bases to Reduce Limit Associated W/Dose Equivalent iodine-131 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20137E2891997-03-24024 March 1997 Amends 125 & 119 to Licenses NPF-2 & NPF-8,respectively, Revising TS to Incorporate Latest Revised Topical Repts Governing Installation of Laser Welded SG Tube Sleeves ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design 1999-09-15
[Table view] |
Text
. . . ~ . . . . . . . . - . .
.M17ng Address'- .
Alstnma Power company '
.' 600 North 18th Street.-
Post Office Box 2641 -
Birmingham, Alabama 35291
.. Telephone 205 783-6090 R. P. Mcdonald
. Senior Vice President Flintridge iscilding AlabamaPower November- 26,1984 Docket No. 50-348 50-364 Director, Nuclear Reactor Regulation
- U. S.' Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. S. A.' Varga Joseph M. Farley Nuclear Plant - Units 1 and 2-Supplemental Response to Generic Letter 83-43, Reporting Requirements of 10CFR50.72 and 10CFR50.73
- Gentlemen:
Pursuant w recent communications with.the NRC Staff, this letter supplements Alabama Power Company's September 14, 1984 letter which proposed changes to the Farley Nuclear Plant Technical Specifications
' Sections 3, 4 and 6 and the Bases of Section 3/4 to implement the new reporting requirements of 10CFR50.72 and 10CFR50.73 (LER Rule). ,
This supplement reflects the final technical specification changes necessary to implement the new LER Rule and includes'the comments of the NRC Staff. 'Each of the changes resulting from discussions with the NRC
- Staff is provided in Attachment 1.
! In order to facilitate the issuar.ce of the proposed technical specification change'which -implements the new LER Rule,- all the proposed
, changed pages from the February 3, July 6 (Item 1 only), and September l~ 14 technical. specification change requests and this supplement have been l- compiled and are provided in Attachment 2. It-should be noted, that l : page 6-21 of Attachment 2 reflects not only the page number. change as a
! result of the new LER Rule, but also a change to technical specification u 6.10.2.n which was included in the July 6,1984 proposed technical specification change for deleting the snubber tables. Currently the .
snubber technical specification change is-scheduled to be completed by-the NRC Staff prior to this LER Rule technical specification' change; L therefore, in order to ensure that' the correct page is issued, the L snubber-technical specification change is included in pageL6-21 of Attachment 2.
O[
y~ _
~ ~
h 0 b PDR s 1
p W..
P. _
- _ __m. . . . . _ _ . , , . , y_, , , . , , , , , _ , , , , _, _
Mr. S. A. Varga November 26, 1984 Page 2
.U. S. Nuclear _ Regulatory Comission Alabama Power Company requests that the NRC review and approve
-these proposed changes to the Technical Specifications by January 21, 1985 in order to eliminate the inconsistency between the new LER Rule and the existing technical specifications.
Because the original proposed technical specification change of September 14, 1984 and this supplement are being submitted at the request of the NRC and since Generic Letter 83-43 stated that no license j amendment fee is required for changes which implement the Generic Letter, no License Application Fee is enclosed.
If you have any questions, please advise.
Yours very trul ,
N b R. P. Mcdonald RPM /CJS:ddb-D-Tech Spec-II Attachments cc: Mr. L. B. Long Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford Mr. G. F. Trowbridge Mr. Dan Turner
- s. . . . .
- . - ~ . . . . - .. . - - .
l Attachment 1 1)' Change to : Technical Specification 3.4.9, Modes 1, 2, 3,~ 4 and 5 Action "a" )
(Both Units 1 and 2). This change was identified as item 5 in Attachment 1 '
of the September 14, 1984 Alabama Power Company submittal.
j
.- .In the September 14, 1984 submittal, Al abama Power Company proposed to delete Reportable Occurrence submittals from Technical Specification Sections 3 and 4, _ pursuant to 10CFR50.73 and Generic Letter 83-43. The NRC
> . Staff stated during recent telephone conversations that an annual report
, - would be required in lieu of the current Reportable Occurrence, if the l reactor coolant specific activity limit of 1.0 microcurie / gram or 100/E were r
exceeded.' An annual reactor coolant system specific activity report is included in Attachment 2 as a' new Technical Specification 6.9.1.13 (page 6-20 both units) .. This proposal is consistent with the most recent revision g of the Westinghouse Standard Technical Specifications.
I
- 2) Change to Technical Specifications 3.5.2, Action "b" and 3.5.3, Action "c" .
(both ' Units 1 and 2) . This-change was identified as item 6 in Attachment 1 F of the September 14, 1984 Alabama Power Company submittal .
~
In the September 14, 1984 submittal, Alabama Power Company proposed to delete submittals which were already required to be reported pursuant to
! 10CFR50.73. During recent telephone conversations, the NRC Staff stated that certain information which is not specifically included in the applicable 10CFR50.73 provisions is necessary for NRC evaluation; therefore, a Special Report would be required.in the event of an ECCS actuation.
Alabama Power Company hereby withdraws the proposed changes to Technical Specification 3.5.2 and 3.5.3 which were included in the September 14, 1984
- letter.
I
- 3) Change to Technical Specification 4.7.10.3 (both Units 1 and 2). Tni s .
change was identified as item 8 in Attachment 1 of the September 14, 1984 Alabama Power Company submittal.
In the September 14, 1984 submittal, Alabama Power Company proposed to
- delete technical specification reports which were no longer required.
!' pursuant to 10CFR50.73. Since a record of all sealed source and fission
- detector leak tests and results, as well as a record of annual physical inventory of all sealed source material of record, are . required to be i maintained for NRC audit for a minimum of 5 years-(Technical Specification 6.10.1) and since the stated purpose' of the LER Rule was .to reduce unnecessary-reporting, Alabama Power Company proposed that Technical Specification 4.7.10.3 be deleted.
~
.The NRC Staff stated during recent telephone conversations that an annual
- seal source leakage report will- continue' to be required in the Technical >
Specifications. An annual sealed source leakage report is included in ,
Attachment 2 as a new Technical Specification 6.9.1.14 (page 6-20 for both p units). ,
1
Attachipent 1 Page 2-
- 4) Change to Technical Specification 3.12.1, action "b" (both Units 1 and 2).
This change was identified as item 11 in Attachment 1 of the September 14, 1984 Alabama Power Company submittal.
In the September 14, 1984 submittal, Alabama Power Company proposed to delete action "b" in its entirety. Subsequent communications with the NRC Staff have indicated that the NRC would prefer that the action statement be modified to require a Special Report rather than delete it in its entirety.
Alabama Power Company has revised page 3/412-1 for both units to reflect the requirement for a Special Report.
- 5) In the September 14, 1984 submittal, Alabama Power Company proposed to add a new Annual Diesel Generator Reliability Data Report pursuant to Generic Letter 84-15. The NRC Staff stated during recent telephone conversations that the annual report description should be clarified to ensure that the information identified in section C.3.b of Regulatory Guide 1.108 Revision 1,1977 is provided in the Annual Diesel Generator Reliability Report.
The requested clarification' has been included in Attachment 2 (page 6-19 both units) . This proposed change is consistent with the reporting information requirement of the existing Technical Specifications.
l-
.~