Advises That GE Reviewing Encl to Ref Ltr to Determine Any Addl Proprietary Submittals That GE Has Made to Support Design Certification for Sbwr.Preliminary List of GE Proprietary Submittals for 1995 Encl
ML20086N910
Person / Time
Site: 05200004
Issue date: 07/19/1995
From: Quinn J
GENERAL ELECTRIC CO.
To: Quay T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
MFN-110-95, NUDOCS 9507260071
Download: ML20086N910 (2)


Text

y , , ,- - .... - -

}o ' :.:

b f 1

3 GENuclearEnergy. l

.l. E. . Manager GeneralElecnic Company .i q- .  ; LMR aru1S6 Programe 175 Curtner Annue, neC 165 San . lone, CA 95125-1014 .

  • 406 925-1005(phone) 406 925-3991 (facsimile) 1 I July 19,1995 MFN 110-95 t Docket STN 52-004_  ;

Document Control Desk U. S.-Nuclear Regulatory Commission

. Washington DC 20555 d

Attention: Theodore E. Quay, Director-

  • Standardization Project Directorate >

.I

Subject:

SBWR - REVIEW OF PROPRIETARY INFORMATION i

Reference:

1.etter from D. M. Crutchfield (NRC) to J. E. Quinn (GE),'same subject, .j dated April 12, 1995  !

, GE is reviewing the enclosure to the reference letter to determine if there are additional' l proprietary submittals that GE has made to' support design certification for the SBWR.' Our '!

intention is to begin with the most recent submittals and work back so 'as to deal Lwith; j proprietary information submitted in support of the testing program and TRACG code first. t

~ We expect that this review can be completed by the end of August 1995.

l In the meantime, we have generated the attached preliminan list of GE proprietary submittals '  ;

year-to-date 1995.

1 i

Sincerely,  !

j, ,

~Ja 4 Quinn ,

Attachment:

Preliminary List of 1995 SBWR Proprietary Submittals to the NRC  :

cc: P. A. Boehnert (NRC/ACRS) (2 paper copies w/att. plus E-Mail w/att.) - l I. Catton (ACRS) (1 paper copy w/att. plus E-Mail w/att.)  !

S. Q. Ninh (NRC) (2 paper copies w/att. plus E-Mail w/att.)

y J. II. Wilson (NRC) (1 paper copy w/att. plus E-Mail w/att.) ,

i j [

9507260071 950719 p D- l 1

i PDR ADOCK 05200004 A PDR <

- , . .. .: . - . - . . - - . , .= - -.

j Attrchm:nt to MFN 110-95 PRELIMINARY LIST OF 1995 SBWR PROPRIETARY SUBMITTALS TO THE NRC DATE MFN NO. SUBJECT

1. 1/18/95 003-95 NRC Requests for Additional Information on the Simplified Boiling Water Reactor (SBWR) Design (RAI 950.23)
2. 1/19/95 006-95 NRC Requests for Additional Information on the Simplified Boiling i Water Reactor (SBWR) Design (RA! 950.51 AND 950.52)
3. 2/6/95 014-95 Meeting Summary of 1/9 and 1/11/95
4. 2/27/95 034-95 NRC Requests for Additional Information on the Simplified Boiling )'

Water Reactor (SBWR) Design RAls 901.52-901.72 Related to Licensing Topical Reports (NEDE-32176P, NEDE-32177P and NEDE-32178P)

5. 3/1/95 036-95 GE GIRAFFE Audit Report I
6. 3/8/95 039-95 GE GIRAFFE Testing and TRACG Computer Code
7. 4/13/95 046-95* SBWR Test and Analysis Program Description NEDC-32391P, Rev.

B (Proprietary)

8. 4/17/95 052-95 GE PANDA Audit Report (Proprietary)
9. 4/14/95 057-95 Thermal-Hydraulic Data Report of PANTHERS-PCC Tests
10. 4/21/95 062-95 SBWR PANTHERS Audit Report (Proprietary) (Cover letter for enclosure: Audit Report #ARP 95-3 (Proprietary), QA Audit of SBWR PANTHERS Test Program by Services and Projects Cual, dated 2/6 - 2/8/95 l 11, 4/25/95 063-95 PANTHERS-PCC Apparent Test Results )
12. 6/30/95 086-95 SBWR Second copy of PANTHERS-PCC Data Tape
13. 7/6/95 098-95 SBWR Data Analysis Report of PANTHERS PCC Tests i
14. 7/14/95 105-95 SBWR GIRAFFE Heat Removal Performance Tests TP&Ps j (including information and drawing package) Report TOGE110-T07 '

Revision May 31,1995 l l