MONTHYEARML20248E1991998-05-28028 May 1998 Informs That Staff Has Identified Six Ltrs (Enclosed) to GE Re Potential Proprietary Disclosure.Ltrs Specifically Requested That GE Review Encl to Determine If Contained GE Proprietary Info.Encl Withheld ML20247R4901998-05-20020 May 1998 Informs That Encl Staff Rept That Was Attached to Has Been Reviewed & Contains No GE Proprietary Info.W/O Encl ML20247M6911998-05-18018 May 1998 Forwards Staff Review of Rept, Giraffe Sbwr Sys Interactions Test Rept, (NEDC-3254OP,Revision-0).Informs That Review of Sbwr Was Terminated in 1996 ML20247M7021998-05-18018 May 1998 Forwards Staff Review of General Electric Panthers - IC Test Rept (Siet 00458RP95).Informs That Sbwr Was Terminated in 1996 ML20134L3181996-11-19019 November 1996 Advises That GE Pathers/Ic ATRs Submitted w/951025 Ltr Will Be Withheld from Public Disclosure Ref 10CFR2.790,based on Review of Listed Reasons for Maintaining Info as Proprietary ML20134F3861996-11-0101 November 1996 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 99900403/96-01 on 960708 ML20134D6271996-10-25025 October 1996 Provides Sbwr - Panthers/Ic Apparent Test Results,Phase 1 Affidavit Supporting Request to Withhold Info from Public Disclosure ML20129C2881996-10-21021 October 1996 Informs of Review & Determination That Info Identified in Apparent Test Results Contain Trade Secrets or Proprietary Commercial Info & Will Be Withheld from Public Disclosure ML20128M7491996-10-11011 October 1996 Provides Affidavit to Tests & Requests That NRC Accepts Request to Withhold Sbwr Panda steady-state Test S10-S13 Pcc Performance from Public Disclosure ML20128H4971996-10-0707 October 1996 Advises That GE Giraffe Sys Apparent Test Results Repts Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960321 Request ML20128H5141996-10-0707 October 1996 Informs That Licensee 951212 Request That GE Panda steady- State Tests S1 Through S6 Pcc Performance Apparent Test Results,Rev 1 Be Withheld from Public Disclosure,Per 10CFR2.790,granted ML20128H5301996-10-0707 October 1996 Informs That Licensee 960314 Request to Withhold GE Girafee Helium Tests Apparent Test Results Repts & Data Transmittal for Giraffe Helium Tests H3 & H4 from Public Disclosure,Per 10CFR2.790,granted ML20129F5031996-10-0303 October 1996 Advises That Info Submitted in 960109 Rept Entitled, Post-Test Calculations of Panda Pcc Steady-State Test, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954 ML20129F5061996-10-0303 October 1996 Advises That Info Submitted in 960109 Rept Entitled, Panther/Ic Apparent Test Results Phase 3, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954 ML20129E8831996-10-0202 October 1996 Informs That GE Panda Steady-State Tests Data Transmittal Rept Will Be Withheld from Public Disclosure,Per 10CFR2.790 (b)(5) & Section 103(b) of AEA of 1954,as Amended ML20129F6181996-10-0202 October 1996 Advises That Giraffe Sbwr Sys Interactions Test Rept Will Be Withheld from Public Disclosure Ref 10CFR2.790, Per 960617 Request ML20129F6341996-10-0202 October 1996 Advises That Panthers/Ic Atrs Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960222 Request ML20129G5841996-10-0202 October 1996 Advises That,Data Transmittal for Giraffe Helium Tests H1 & H2,as Requested by Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA ML20129E6361996-10-0101 October 1996 Advises That GE Panda Transient Integral Test Data Transmittal Repts Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960816 Request ML20129E8681996-10-0101 October 1996 Informs That Licensee 960222 Request to Withhold GE Panda Steady-State Tests S10-S13 Performance from Public Disclosure Per 10CFR2.790.Request Denied Because No Affidavit Was Submitted ML20129G6311996-10-0101 October 1996 Advises That Giraffe Helium Series Test Rept,As Requested by Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA ML20248F3891996-07-31031 July 1996 Forwards Rept on Staff Evaluation of GE Tracg Model Description,Rev 1,related to Containment Area,In Response to ML20115D0441996-07-11011 July 1996 Forwards Nonproprietary NEDO-32608, Giraffe Sbwr Helium Series Test Rept. Proprietary Rept Submitted by GE ML20115C4601996-07-0808 July 1996 Addresses Nonconformances Noted in Insp Rept 99900403/96-01 Re Panda Testing.C/A:Apparent Test Results Repts (ATR) Which Contains All Info Specified in ATRs in Test Spec & Test Plans Issued for Listed Tests ML20113C2071996-06-27027 June 1996 Forwards NEDO-32540, Giraffe Sbwr Sys Interactions Test Rept ML20113B5661996-06-24024 June 1996 Forwards Proprietary Test Rept for Giraffe Helium Series Tests.Test Procedures & Instrumentation Drawings Encl.Encls Withheld Per 10CFR2.790 ML20113A0111996-06-17017 June 1996 Forwards Proprietary Rev 0 of NEDC-32540P, Giraffe Sbwr Sys Interactions Test Rept. Transmittal Satisfies Items 38 & 39 of GE Re Updated Status of Test Documentation Submittals.Encl Withheld (Ref 10CFR2.790) ML20117M9651996-06-14014 June 1996 Forwards non-proprietary Rev 0 to Siet 00458RP95, PANTHERS-IC Test Rept ML20112J0791996-06-14014 June 1996 Forwards Proprietary Version of Rev 0 to 00458RP95, PANTHERS-IC Test Rept. Rept Prepared for GE by Siet S.P.A Under Contract to Enea.Rept Withheld from Public Disclosure Per 10CFR2.790 ML20117K7091996-06-10010 June 1996 Requests 30 Day Extension Until 960710 to Respond to NRC Re Nonconformances & Unresolved Items Noted in Insp Rept 99900403/96-01 on 960305-08 ML20112G6711996-06-0707 June 1996 Forwards Responses to NRC Questions & Comments Re Rev 1 of GE Scaling Rept NEDC-3228P, Scaling of Sbwr Related Tests ML20117H4561996-05-22022 May 1996 Clarifies Charges for TAC M84214,GE Sbwr - RAI - Initial Test Program (Chapter 14) on Invoice XM0439-96,dtd 960429 ML20117F5711996-05-14014 May 1996 Requests That Je Leatherman Be Removed from Svc List & Rh Buchholz Be Added ML20108B8451996-04-26026 April 1996 Requests Addl Review of Repts by Nrc,Per Input Provided by Domestic & Intl Utils to Go Further than Indicated in GE 960304 & 13 Ltrs W/Efforts on Tracg Qualification for Sbwr Application.Utils,Epri & GE Desire to Meet W/Nrc on 960528 ML20107A4681996-04-10010 April 1996 Requests Copies of English Translations of Repts on Par, to Facilitate Sbwr Review ML20101Q6961996-04-10010 April 1996 Forwards non-proprietary Apparent Tests Results (ATR) Repts for Helium Tests & tie-back Tests ML20101F8871996-03-21021 March 1996 Forwards Proprietary Apparent Test Results Rept (ATR) Sys Interaction Tests (Sit).Proprietary Repts Withheld (Ref 10CFR2.790) ML20101F2981996-03-20020 March 1996 Forwards Latest Revs of Panda Project Control Plan & QA Procedures ML20101B7591996-03-14014 March 1996 Advises That GE Redirecting Focus of Simplified BWR Programs from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger ML20101C4731996-03-14014 March 1996 Forwards Proprietary & Nonproprietary Apparent Test Results Rept for Four Helium Tests & Two tie-back Tests.Proprietary Repts Withheld Per 10CFR2.790.Affidavit Encl ML20101B7381996-03-13013 March 1996 Discusses Redirecting Focus of Sbwr Programs from 670 Mwe Size to 1,000 Mwe or Larger Size Plants Reducing Activity Level on Tracg Effort as It Applies to 670 Mwe Plant ML20101B7501996-03-12012 March 1996 Discusses Sbwr Closure of Vacuum Breaker Test Program ML20100N9301996-03-0404 March 1996 Informs That GE Redirecting Focus of Sbwr Program from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger. Listing of Open Activities,Desired Closure Objective & Schedule Encl ML20101B8011996-02-26026 February 1996 Discusses Sbwr Re NRC Site Visit & Insp to Panda,Ansaldo & Dodewaard ML20100J0321996-02-23023 February 1996 Submits non-proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting ML20100J0141996-02-23023 February 1996 Forwards Proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting.Encl Withheld ML20149K0521996-02-15015 February 1996 Forwards Proprietary Test Results for Giraffe Helium Tests H1 & H2.Attachment 1 to Ltr Provides List of Instruments Included on Computer Disk.Encl Withheld (Ref 10CFR2.790) ML20097F7101996-02-15015 February 1996 Forwards Sbwr Status & Schedule 960214 & Payments Made to NRC for Last Four Yrs,In Response to Ref Telcon Requests ML20100J4041996-02-12012 February 1996 Transmits Proprietary Rev 1 to Licensing Technical Rept NEDE-32176P, Tracg Model Description Open Items.Encl Withheld ML20100G8361996-02-12012 February 1996 Forwards Proprietary Rev 1 to Topical Rept NEDE-32176P, Tracg Model Description. Rev 1 to Topical Rept NEDE-32176P Withheld 1998-05-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20247R4901998-05-20020 May 1998 Informs That Encl Staff Rept That Was Attached to Has Been Reviewed & Contains No GE Proprietary Info.W/O Encl ML20134D6271996-10-25025 October 1996 Provides Sbwr - Panthers/Ic Apparent Test Results,Phase 1 Affidavit Supporting Request to Withhold Info from Public Disclosure ML20128M7491996-10-11011 October 1996 Provides Affidavit to Tests & Requests That NRC Accepts Request to Withhold Sbwr Panda steady-state Test S10-S13 Pcc Performance from Public Disclosure ML20115D0441996-07-11011 July 1996 Forwards Nonproprietary NEDO-32608, Giraffe Sbwr Helium Series Test Rept. Proprietary Rept Submitted by GE ML20115C4601996-07-0808 July 1996 Addresses Nonconformances Noted in Insp Rept 99900403/96-01 Re Panda Testing.C/A:Apparent Test Results Repts (ATR) Which Contains All Info Specified in ATRs in Test Spec & Test Plans Issued for Listed Tests ML20113C2071996-06-27027 June 1996 Forwards NEDO-32540, Giraffe Sbwr Sys Interactions Test Rept ML20113B5661996-06-24024 June 1996 Forwards Proprietary Test Rept for Giraffe Helium Series Tests.Test Procedures & Instrumentation Drawings Encl.Encls Withheld Per 10CFR2.790 ML20113A0111996-06-17017 June 1996 Forwards Proprietary Rev 0 of NEDC-32540P, Giraffe Sbwr Sys Interactions Test Rept. Transmittal Satisfies Items 38 & 39 of GE Re Updated Status of Test Documentation Submittals.Encl Withheld (Ref 10CFR2.790) ML20112J0791996-06-14014 June 1996 Forwards Proprietary Version of Rev 0 to 00458RP95, PANTHERS-IC Test Rept. Rept Prepared for GE by Siet S.P.A Under Contract to Enea.Rept Withheld from Public Disclosure Per 10CFR2.790 ML20117M9651996-06-14014 June 1996 Forwards non-proprietary Rev 0 to Siet 00458RP95, PANTHERS-IC Test Rept ML20117K7091996-06-10010 June 1996 Requests 30 Day Extension Until 960710 to Respond to NRC Re Nonconformances & Unresolved Items Noted in Insp Rept 99900403/96-01 on 960305-08 ML20112G6711996-06-0707 June 1996 Forwards Responses to NRC Questions & Comments Re Rev 1 of GE Scaling Rept NEDC-3228P, Scaling of Sbwr Related Tests ML20117H4561996-05-22022 May 1996 Clarifies Charges for TAC M84214,GE Sbwr - RAI - Initial Test Program (Chapter 14) on Invoice XM0439-96,dtd 960429 ML20117F5711996-05-14014 May 1996 Requests That Je Leatherman Be Removed from Svc List & Rh Buchholz Be Added ML20108B8451996-04-26026 April 1996 Requests Addl Review of Repts by Nrc,Per Input Provided by Domestic & Intl Utils to Go Further than Indicated in GE 960304 & 13 Ltrs W/Efforts on Tracg Qualification for Sbwr Application.Utils,Epri & GE Desire to Meet W/Nrc on 960528 ML20101Q6961996-04-10010 April 1996 Forwards non-proprietary Apparent Tests Results (ATR) Repts for Helium Tests & tie-back Tests ML20107A4681996-04-10010 April 1996 Requests Copies of English Translations of Repts on Par, to Facilitate Sbwr Review ML20101F8871996-03-21021 March 1996 Forwards Proprietary Apparent Test Results Rept (ATR) Sys Interaction Tests (Sit).Proprietary Repts Withheld (Ref 10CFR2.790) ML20101F2981996-03-20020 March 1996 Forwards Latest Revs of Panda Project Control Plan & QA Procedures ML20101B7591996-03-14014 March 1996 Advises That GE Redirecting Focus of Simplified BWR Programs from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger ML20101C4731996-03-14014 March 1996 Forwards Proprietary & Nonproprietary Apparent Test Results Rept for Four Helium Tests & Two tie-back Tests.Proprietary Repts Withheld Per 10CFR2.790.Affidavit Encl ML20101B7381996-03-13013 March 1996 Discusses Redirecting Focus of Sbwr Programs from 670 Mwe Size to 1,000 Mwe or Larger Size Plants Reducing Activity Level on Tracg Effort as It Applies to 670 Mwe Plant ML20101B7501996-03-12012 March 1996 Discusses Sbwr Closure of Vacuum Breaker Test Program ML20100N9301996-03-0404 March 1996 Informs That GE Redirecting Focus of Sbwr Program from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger. Listing of Open Activities,Desired Closure Objective & Schedule Encl ML20101B8011996-02-26026 February 1996 Discusses Sbwr Re NRC Site Visit & Insp to Panda,Ansaldo & Dodewaard ML20100J0141996-02-23023 February 1996 Forwards Proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting.Encl Withheld ML20100J0321996-02-23023 February 1996 Submits non-proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting ML20097F7101996-02-15015 February 1996 Forwards Sbwr Status & Schedule 960214 & Payments Made to NRC for Last Four Yrs,In Response to Ref Telcon Requests ML20149K0521996-02-15015 February 1996 Forwards Proprietary Test Results for Giraffe Helium Tests H1 & H2.Attachment 1 to Ltr Provides List of Instruments Included on Computer Disk.Encl Withheld (Ref 10CFR2.790) ML20100G8361996-02-12012 February 1996 Forwards Proprietary Rev 1 to Topical Rept NEDE-32176P, Tracg Model Description. Rev 1 to Topical Rept NEDE-32176P Withheld ML20100J4041996-02-12012 February 1996 Transmits Proprietary Rev 1 to Licensing Technical Rept NEDE-32176P, Tracg Model Description Open Items.Encl Withheld ML20097D1631996-02-0101 February 1996 Advises That Charges on TACs M84204 & M84214 Appear Inappropriate as Review of Sbwr Ssar Chapters 4 & 14 Were Stopped Months Before 951001-951223 Period & No Chapter 4 RAIs Have Been Received ML20117P2221996-01-27027 January 1996 Forwards Final Rept Thermal Properties of Concrete at High Temps, ML20096G5611996-01-18018 January 1996 Requests Withdrawal of Proprietary Version of TRACG02V User'S Manual & Associated Affidavit ML20096B8531996-01-0909 January 1996 Forwards Proprietary Info Re Sbwr - Panthers/Ic Apparent Test Results,Per .Encl Withheld (Ref 10CFR2.790) ML20096C0641996-01-0909 January 1996 Forwards Proprietary Responses to RAIs Re Sbwr License TR NEDE-32177P (Tracg Qualification).Responses Withheld Per 10CFR2.790 ML20095J5441995-12-18018 December 1995 Forwards Rev 0 to NEDO-32288, Scaling of Sbwr Related Tests ML20095G8551995-12-13013 December 1995 Requests Removal of Westinghouse TR WCAP-14416 from Sbwr Docket Stn 52-004 ML20094Q6061995-11-29029 November 1995 Forwards Nonproprietary Handouts Presented by GE During 951128 & 29 ACRS Thermal Hydraulic Subcommittee Meeting in San Jose,Ca ML20094Q7271995-11-29029 November 1995 Forwards Proprietary GE Handouts During Meeting for 951128 & 29 ACRS Thermal & Hydraulic Subcommittee in San Jose,Ca. Handouts Withheld Per 10CFR2.790 ML20100E1251995-11-10010 November 1995 Forwards Rev 1 to NEDO-32391,Suppl 1, Sbwr Test & Analysis Program Description Suppl 1 - Discussion of Pirt Parameters ML20094Q0061995-11-0808 November 1995 Forwards non-proprietary Version of RAI on Sbwr Design, ML20094P1841995-11-0707 November 1995 Responds to NRC Re GE 950216 Request for Exemption of Sbwr Drywell to Wetwell Vacuum Breaker from Single Failure Criteria ML20094E0411995-11-0101 November 1995 Forwards Nonproprietary Version of Tracg Containment Model Road Map as Agreed to at 950821 & 22 Meeting ML20094D0651995-10-31031 October 1995 Forwards Proprietary Response to RAI Re Simplified BWR, Including Questions Q901.75-78,81,82,84-88,92,95-102,105- 127,132-143,146-150 & 152-158.Encl Withheld (Ref 10CFR2.790) ML20095B0981995-10-31031 October 1995 Addresses NRC Unresolved Items Documented in Insp Rept 99900404/95-02 ML20094E8521995-10-27027 October 1995 Forwards Nonproprietary Version of Ref 2,in Response to NRC Ref 1 Request Re Sbwr Design, ML20094E7691995-10-26026 October 1995 Informs That First & Third Noted Handouts Should Be Reclassified as non-proprietary.Second & Fourth Noted Handouts Should Continue to Be Classified as Proprietary ML20094D0361995-10-26026 October 1995 Forwards Nonproprietary Response to Rea on Licensing Topical Repts NEDE-32176P,NEDE-32177P & NEDE-32178P ML20095L7781995-10-25025 October 1995 Forwards Proprietary Panthers/Ic Apparent Test Results, Phase 1.Encl Withheld 1998-05-20
[Table view] |
Text
.-
k' GENuclearEnergy
. J E Quinn, Projects Manager : GeneralElectric Company . .
LMR and SBWR Programs 175 Curtner Avenue. AVC 165 San Jose, CA 95125-1014 406 925-1005 (phone) 406 925-3991 (facsimile)
..g' March 16,1995 - MFN 042 '
Docket STN 52-004 -
Document Control Desk "
U. S. Nuclear Regulatory Commission Washington DC 20555 Attention: Richard W. Borchardt, Director Standardization Project Directorate
Subject:
PANTHERS-IC Testing Reorientation
Reference:
- 1) SBWR Test and Analysis Program Description, B. S. Shiralkar, '
., et al., Licensing Topical Report NEDO-32391, Revision A, September 1994
' 2) DSER to TAPD .
- 3) Isolation Condenser & Passive Containment CondenserTest Requirements,23A6999, Revision 3 1 i
This aresented letterintransmits proposed 1.
the TAPD (Reference chang)es The attachedto thepaperPANTHERS-IC (IC Testing test matrix from that i Reorientation) describes these changes which are in response to the NRC request for tests at lower pressure (Reference 2) and also due to GE's desire to reduce the -
number of structural cyclic tests. The changes do not impact the primary objectives of the test program as described in the TAPD.
GE needs the review and approval from its three Italian partners (Ansaldo, ENEA, and ENEL) before incorporating these changes in the next revision of the PANTHERS Test Specification (Reference 3). We would also like to request NRC's ,
concurrence to these changes. 1 Sincerely, u-es E. Quinn, Projects Manager LMR and SBWR Programs Enclosure l
cc: P. A. Boehnert (NRC/ACRS) )
- 1. Catton (ACRS) ;
S. Q. Ninh (NRC) 1 J. H. Wilson (NRC) j l- I sk kDO $4
,w h,
m ....
Attachment to MFN 042-95 :
PANTHERSIC TESTING REORIENTATION Introduction In order to comolete the PANTHERS-IC test program in a timely manner and with .
minimum cost, a reorientation of the test matrix is needed. The reorientation involves (1) a reduction in the total number of tests, (2) changes in the test matrix, and (3) modification of the test schedule to best utilize available resources at SIET.
Test Objectives The PANTHERS-IC test objectives, as stated in the SBWR Test Analysis and Program Description (NEDO-32391, Rev. A) remain unchanged. For the Thermal-Hydraulic Tests these objectives are:
- 1. Demonstrate that the prototype IC heat exchanger is capable of meeting its design requirements for heat rejection. (Component Performance)
- 2. Provide a sufficient data base to confirm the adequacy of TRACG to predict the quasi-steady heat rejection performance of a prototype IC 1: cat exchanger, over a range of operating pressures that span and bound the -
SBWR range. (SteadystateSeparateEffects)
- 3. Demonstrate the startup of the IC unit under accident conditions. (Concept Demonstratiors)
- 4. Demonstrate the noncondensable venting capability of the SBWR IC design, and condensation restart capability following venting. (Concept Demonstration)
For the Component Demonstration Test the objective is:
- 1. Confirm that the mechanical design of the IC heat exchanger is adequate to assure its structural integrity over a period of time between SBWR In-Service Inspections (ISI).
While the objectives remain the same, the approach used to satisfy them has changed. For the Thermal-Ilydraulic Tests, the test conditions in the matrix have been modified. For the Component Demonstration Tests, the number of test cycles has been reduced. Both of these changes are discussed below.
e 03/14/95
4 ,
Attachment to h1FN 042-95 l
. . i Matrix Chances The test matrix is given in Appendix B of the Test Specification (23A6999, Rev. 3).
Tables la - le (attached) show a revised matrix. The major changes are:
- 1. Structural tests are separated from thermal-hydraulic performance tests. In the current Test Specification, each steady-state performance test cycle (Type 2) represents a structural test cycle (Type 1). The matrix is revised to show that the Type 2 tests do not include steady-state operation at normal reactor pressure (8.618 kPa g). However,if steady-state operation at nonnal reactor pressure is included, then that test could represent one normal 1C operation cycle (Type 1) or one reactor heatup/cooldown cycle (Type 4), depending on the conditions tested. This allows flexibility by SIET to gather performance data without the need of the test being a structural test.
- 2. Steady-steady data can be collected at more than one pressure during a given test. The also allows flexibility by SIET to run thermal-performance tests together.
- 3. Steady-state performance pressures are revised to collect data at lower pressures. This broadens the performance of the IC to covei effects during postulated LOCAs. This change was made at the request of the USNRC.
- 4. Only one cycle is required for each performance pressure test condition.
- 5. Venting test conditions for Type 3 tests (non-condensable gas effects) have been revised to better reflect actual plant conditions during design basis transients. Specifically, the tests call for a mixture of air and helium to match the ratio of radiolytic gases (oxygen and hydrogen) which could be generated in the core during an isolation transient. In addition, since these tests are not designed to match the transieu system behavior of SBWR (e.g., steam flows are constant), there is no specific required flow. However, the flow requirements have been given such that useful data will be collected to understand the thermal performance degradation caused by non-condensable gas buildup.
- 6. Pool water level effects test conditions have also been revised to better reficct actual plant conditions (i.e., lower steam flowrates). As with the non-condensable gas effects tests, these tests will not match the actual transient performance of the IC system, but will supply data to understand the thermal performance degradation caused by the tubes becoming uncovered.
Test Reduction The structural design objective of the full 4cale IC test is to assure that the loads used in the design envelop the loads expected during the SBWR senice conditions. To meet this objective:
- a. The IC will be subjected to a range of pressure and thermal transients enveloping the loads expected during the senice.
03/14/95
7
?.: ; ,
9 [ ' b, '
Attachment to MFN 042-95 .l i
~
w..~
' '.' a 1 b. Temperatures and strains will be monitored with thermocouples and strain-gages at critical locations identified through heat transfer and stress - ]
analyses. Comparison of the measured temperatures and strains will be j used to verify and envelop the thermalloads used in the analyses.
- c. - The ASME Code limits thermal rachetting through limits on thermal' stress j
. cycles calculated using elastic or simplified inelastic ana. lyses. The cyclic _
stresses are used to calculate fatigue design margins, and the' cumulative :
inelastic strains are used to meet any functional deformation limits. While ]
no functional deformation limits exist for the IC design, changes in ;
distances bet'veen scribe marks at locations identified through analyses'will - j bc used to estimate permanent deformations which will be then used to 3 verify and envelop cyclic loads used in the analyses.' :i
~d. Acceleron.eters will be included to uncover any flow-induced or ' .
condensation-induced vibrations.
- e. The ASME Code design rules are formulated to prevent detectable crack .[
initiation by appropriate stress and cycle limits and by limiting the material ~ q operation to high ductility, large fracture toughness regimes. . The large . ;
design margins against these rules and the large ductility and fracture . l toughness ofInconel 600 predicate no crack initiation or growth in the IC 4 design. This will be verified through pre- and post-test non-destructive ;
. examination of selected header / tube weldjoints in this test.-
The test matrix required to m'eet the structural test objectives is designed to. .
- 1. Envelop all the thermal-hydraulic loading conditions expected during the j tests to assure that load estimates from the tests include the largest !
temperature gradients an'd the fastest thermal transients with prototype pressure loads. :
- 2. Include sufficient number ofload cycles to reveal any thermal rachetting _. l where the clastically calculated stress levels exceed the ASME Code j shakedown limits so that the measured deformations can be used to envelop the ASME alternative shakedown analysis approach.
GE has determined that 20 load cycles, with a large fraction of the cycles to [
include thermal transients, will be sufficient to meet the above criteria as well as -!
uncover unexpected vibrations or crack initiations at welds. .Therefore, the number of"nonnal" IC operation cycles has been reduced from 45 to 20. In -
addition, the number of reactor heatup/cooldown cycles has been reduced from !
85 to 5. The purpose of these tests is to gather structural measurementt to j' demonstrate conservatism in the structural analyses. ,
i 03/14/95
,. . Attachment to MFN 042-95 l-
Originally, PANTHERS-IC tests were to be run using steam from the neighboring ENEL power station and energy generated from an on-site boiler. The existing .
steam line from the power station is not sufficiently sized to operate the condenser .[
at maximum pressures.- 'i It has now been decided to only use steam from the power plant. In order to test at peak pressures, the existing 3 inch s' team line at SIET will be augmented with a ;
5 inch line. The larger line is expected to be in place approximately September 1.. ;
To make the most efficient use of the facility, the test program has been divided . ]
into four phases. These phases can be characterized as the following:
Phase: }
- 1. Thermal-hydraulic performance tests using the 3 inch steam line. -[
- 2. Reactor heatup/cooldown tests r
- 3. Thermal-hydraulic perfonnance tests using the 5 inch steam line.
- 4. Remaining structural and ATWS tests.
Table 2 shows the test conditions and schedule for each of the four phases.
0 i
i i
t l
i i
1 l
03/14/95
Attachment to MFN 042-95 l
l l
l l
REFERENCE MATRIX OF IC TEST CONDITIONS i
. Table la Steady-State Performance Test Conditions (Type 2) - ,
Test Condition Inlet Pressure Number [MPag (psig)]
2 7.920 (1150) 3 7.240 (1050) 4 6.21 (900) l 5 5.52 (800) 6 4.83 (700) _
7 4.14 (600) 8 2.76 (400) 9 1.38 (200) 10 0.69 (100) 11 0.21 (30)
Notes:
- 1. Measure steady-state data for 15 minutes.
- 2. More than one Test Condition can be collected in a single test.
- 3. To qualify as a structural Type 1 test cycle:
3.1. Initial pool temperature < 32 degrees C (90 degrees F), ,
3.2. Initial inlet pressure (P1) = 8.618 MPag (1250 psig),
3.3. Maintain inlet pressure for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (P2) = 8.618 MPag (1250 psig).
- 4. To qualify as a structural Type 4 test cycle:
4.1. Initial pool temperature < 32 degrees C (90 degrees F),
4.2. Initial inlet pressure (P1) = 8.618 MPag (1250 psig),
t 03/14/95 l
11 ..
+
- Attachment to MFN 042-95 , ,
Table Ib ~-
Non-condensable Gas Effects Test Conditions ' .f (Type 3) :
Test . Inlet Pressure, P3 ,
Condition [MPag (psig)] l Number ,
12-- 0.48 (70) 13- 2.07 (300)- :
Notes:
- 1. Hold pressure at P3 for 15 minutes. 1
- 2. Inject air / helium mixture until pressure reaches 7.653 MPag (1110 psig).
2.1. Nominal (i 10%) ratio of air to helium = 3.6 2.2. Total flow rate sufficient to conduct a test within one test day. ..
- 3. Vent from bottom vent until pressure returns to P3 or remains constant. ;
- 4. If pressure does not return to P3, vent from top vent until pressure returns .;
- to P3 or remains con'stant.
I
- 5. To qualify as a structural Type 1 test cycle: .
5.1. Init ial pool temperature < 32 degrees C (90 degrees F),- ,
5.2. Initial inlet pressure (P1) = 8.618 MPag (1250 psig), ?
5.3. Maintain initial inlet pressure for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (P2) = 8.618 MPag (1250 psig). t
- 6. To qualify as a structural Type 4 test cycle: -i 6.1. Initial pool temperature < 32 degrees C (90 degrees F), t 6.2. Initial inlet pressure (P1) = 8.618 MPag (1250 psig). .
.l t
l i
03/14/95 l
n.- 3 i
, Attachment to MFN042 .
1 Table Ic _
.{
Pool Water Level Effects Test Conditions '
(Type Sm)
Test Condition Inlet Pressure, P3 Number [MPag (psig)]
14 0.48 (70) 15 2.07 (300)
Notes:
- 1. Ifold pressure at P3 for 15 minutes.
- 2. Lower water level to mid-height of condenser tubes or until pressure reaches 8.618 MPag (1250 psig).
- 3. Raise water level to normal level and hold for 15 minutes. ,
- 4. To qualify as a structural Type 1 test cycle:
4.1. Initial pool temperature < 32 degrees C (90 degrees F),
4.2. Initial inlet pressure (P1) = 8.618 MPag (1250 psig), . ,
4.3. Maintain initial inlet pressure for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (P2) = 8.618 MPag (1250 ;-
psig). l
- 5. To qualify as a structural Type 4 test cycle:
5.1. Initial poo! temperature < 32 degrees C (90 degrees F), ,
5.2. Initial inlet pressure (PI) = 8.618 MPag (1250 psig),
i e
h I
L 03/14/95
! Attachmer 'FN 042-95 Table ld Startup Demonstration Test Conditions Test No. of Initial Inlet Inlet Inlet Initial Condition Cycle Cycles Pressure, P1 Pressure, P2 Pressure, P3 Pool Number Type MPag (psig) MPag (psig) MPag (psig) Temp.
[*C (*F)]
1 1 3 9.480(1375) 8.618(1250) < 21 (70) 18 5 1 8.618(1250) 9.480(1375) 8.618(1250) < 32 (90)
Notes:
- 1. In Test Condition 1, the inlet pressure P1 can be reduced in accordance with Test Specification Figure 6-2 if the initial pool temperature is less than 17 "C (62 "F). Hold pressure P2 for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
- 2. Test Condition 18 should be done at the end of the test series. Hold pressure P3 for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
Table le Structural Cyclic Test Conditions Test No. of InitialInlet Inlet Condition Cycle Cycles Pressure, P1 Pressure, P2 Number Type MPag (psig) MPag (psig) Notes
- 16 1 20 8.618 (1250) 8.618 (1250) 1,2,3 17 4 5 8.618 (1250) 1,4 Notes:
- 1. Initial pool temperature < 32 degrees C (90 degrees F).
- 2. Iloid pressure P2 for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
- 3. Number of cycles of Test Condition 16 can be reduced by number of earlier tests (including shakedown) which meet these criteria. However, at least 2 tests must be done at these conditions with the critical structural instrumentation operational.
- 4. Number of cycles of Test Condition 17 can be reduced by number of l earlier tests which meet these criteria, but not Test Condition 16. However, at least 2 tests must be done at these conditions with the critical structural instrumentation operational.
f 03/14/95 l
=.
. Attachment to MFN 042-95 s*
- o ,-
Table 2 Test Phases and Schedule Test Phase Test Condition Tentative Start Tentative End Number Number Date Date 1* 8** July 1,1995 July 20,1995 -
9 10 11 12 13 14 15 2 17. July 21,1995 August 31,1995 Install 5" line Ongoing August 31,1995 3 1 September 1,1995 September 28, 2 1995 3 '
4 5
6 7
4 16 September 29, December 31, 18- 1995 1995 Test period includes a shutdown of the ENEL power station scheduled to startJune 16 and last r;. proximately two weeks. During the shutdmyn, no steam will be available for testing. The shutdmm may be extended beyond the planned two weeks.
- If specified pressure cannot be reach with maximum steam flow, then perform the test at the maximum sustainable pressure up to 2.62 MPag (380 psig). Otherwise, perform the test during Phase 3.
i 1
l 1
l I
03/14/95