Proposed Tech Specs Re Replacement TS Page 248a Concerning PORC Membership & Review Responsibilities
ML20077D307
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/02/1994
From:
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20077D304 List:
References
NUDOCS 9412080169
Download: ML20077D307 (3)


Text

m--

s t

ATTACHMENT I TO JPN-94-065 REPLACEMENT TECHNICAL SPECIFICATION PAGE 248a RELATED TO l PORC MEMBERSHIP AND REVIEW RESPONSIBILITIES j i

I i

i L

f l

i New York Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50-333 DPR-59 9412080169 941202 PDR ADOCK 05000333 P PDR

.- . - - -. - -- . - . . - . ~ - .-- . _. - -

4 p

-JAFNPP i

.?

6.5.0.3 Designated technical reviewer (s) shall meet or exceed the qualifications described in Section 4 of ANSI N18.1-1971 for applicable positions, with the exclusion of the positions identified in ,

Sections 4.3.2 and 4.5. Individuals whose positions are described in Sections 4.3.2 and 4.5 i may qualify as designated technical reviewers provided they meet the qualifications described in other portions of Section 4. ,

6.5.0.4' The designated technical reviewer shall determine the need for cross disciplinary reviews. I Individuals performing cross-disciplinary reviews shall meet the same qualifications required  !

for designated technical reviewer (s).'

6.5.0.5 Each program and procedure required by Specification 6.8 and other procedures that affect -

l nuclear safety, and changes thereto, shall be reviewed from a safety perspective by a-  ;

qualified safety reviewer. Safety and/or environmental impact evaluations, when required, i shall be reviewed by PORC per Specification 6.5.1.6.a. .!

6.5.0.6 Nuclear safety related procedures and procedure changes shall be reviewed and approved, prior to implementation, by the appropriate member (s) of management. l 6.5.1 PLANT OPERATING REVIEW COMMITTEE (PORC) l 6.5.1.1 Function '

PORC shall function to advise the Resident Manager on matters related to nuclear safety and  !

environmental impact. i 6.5.1.2 Membership }

\

The Plant Operating Review Committee shall be composed of the:  !

I Chairman: General Manager - Operations Vice-Chairman / Member: General Manager - Support Services  !

Vice-Chairman / Member: General Manager - Maintenance i Member: Operations Manager i Member: Maintenance Manager  !

Member: Technical Services Manager i Member: Instrument and Controls Manager j Member: Radiological and Environmental .

Services Manager  !

Member: Site Engineering Manager j Member: Reactor Analyst Supervisor ,

4 Special consultants to provide expert advice may be utilized when the nature of a particular j problem dictates.  ;

I I

Ameng ent No. M,6, % i 248a j

JAFNPP 6.5.0.3 Designated technical reviewer (s) shall meet or exceed the qualifications describe 4 of ANSI N181-1971 for applicable positions 7with the exclusion of the positions identified in ections 4.3.2 and 4.5. Individuals whose positions are described in Sections 4.3.2 and 4.5 may qualify in other as designated portions of Section 4. technical reviewers provided they meet the qualifications descr 6.5.0.4 The designated technical reviewer shall determine the need for cross-disciplinary reviews.

Individuals performing cross-disciplinary reviews shall meet the same qualifications required for designated technical reviewer (s).

6.5.0.5 Each program and procedure required by Specification 6.8 and other procedures that affect nuclear safety, and changes thereto, shall be reviewed from a safety perspective by a qualified safety reviewer. Safety and/or environmental impact evaluations, when required, shall be reviewed by PORC per Specification 6.5.1.6.a.

6.5.0.6 Nuclear safety related procedures and procedure changes shall be reviewed and approved, .

prior to implementation, by the appropriate member (s) of management.

6.5.1 PLANT OPERATING REVIEW COMMITTEE (PORC) 6.5.1.1 Function PORC shall function to advise the Resident Manager on matters related to nuclear safety and environmental impact.

6.5.1.2 Membership The Plant Operating Review Committee shall be composed of the:

Chairman: General Manager - Operations Vice-Chairman / Member: General Manager - Support Services Vice-Chairman / Member: General Manager - Maintenance Member: Operations Manager Member: Maintenance Manager Member: Technical Services Manager Member: Instrument and Controls Manager Member: Radiological and Environmental Services Manager Mernber: Site Engineering Manager Member: Reactor Analyst Supervisor Special consultants to provide expert advice may be utilized when the nature of a particular problem dictates.

Amendment No. M, FI %

248a