Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217G512 | 14 October 1999 | Revised Page 285 to TS Re Allowed Containment Leakage Rate, Changing Rev 0 to Rev 1 | |
ML20217G434 | 14 October 1999 | Rev C to Proposed TS Change Re Conversion to Improved Standard TSs | |
ML20217D996 | 13 October 1999 | Risk-Informed ISI Program Plan for Ja Fitzpatrick | Non-Destructive Examination VT-2 |
ML20216J387 | 29 September 1999 | Proposed Tech Specs Pages,Extending LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer | |
ML20196F607 | 22 June 1999 | Proposed Tech Specs Re pressure-temp Limits | Hydrostatic |
ML20195B883 | 1 June 1999 | Proposed Tech Specs,Converting to Improved Std TS | |
ML20206U142 | 19 May 1999 | Proposed Tech Specs Revising AOTs for Single Inoperable EDG | Fire Protection Program |
ML20205K109 | 5 April 1999 | Proposed Tech Specs,Removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing | |
ML20204B632 | 21 March 1999 | Plant Referenced Simulation Facility Four Year Performance Testing Rept | Loop seal Squib Residual transfer Scram Discharge Volume Fuel cladding |
ML20199H361 | 15 January 1999 | Proposed Tech Specs Table 4.1-2 Re Local Power Range Monitor (LPRM) Signal Calibr | |
ML20206P054 | 31 December 1998 | Rev 3.2 to EDAMS/RADDOSE-V | Grab sample Met Tower |
ML20198M832 | 30 December 1998 | Proposed Tech Specs Page 258f Re Configuration Risk Mgt Program | |
ML20197G618 | 3 December 1998 | Proposed Tech Specs Reducing Size of Spent Fuel Rack Assembly N3 from 8x13 Cells to 8x12 Cells & Deleting Proposed Inclusion of Fuel Pool Water Level Inadvertent Drainage Into Amend | Operating Basis Earthquake Design basis earthquake Earthquake Fire Protection Program |
ML20154M718 | 16 October 1998 | Proposed Corrected Tech Specs Section 3/4.6.C,relocating Portions of Reactor Coolant Sys - Coolant Chemistry | Power change |
ML20155E783 | 15 September 1998 | Rev 2 to Ja FitzPatrick NPP IST Program for Pumps & Valves Third Interval Plan | Stroke time Hydrostatic Squib Cold shutdown justification Power Operated Valves |
ML20236X804 | 3 August 1998 | Proposed Tech Specs Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 | Safety Limit Minimum Critical Power Ratio |
ML20236M623 | 10 July 1998 | Proposed Tech Specs Pages Re Amend to Relocate TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process | Fire Protection Program |
ML20249B163 | 16 June 1998 | Proposed Tech Specs Re Relocation of Safety Review Committee Review & Audit Requirements | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20236L293 | 7 June 1998 | Proposed Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys | |
ML20217K039 | 30 March 1998 | Proposed Tech Specs Changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition for LSFT to Be Consistent w/NUREG-1433 | Grace period |
B110073, Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy | 28 February 1998 | Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy | |
ML20247F798 | 26 February 1998 | Proposed Tech Specs Re Allowed Containment Leakage Rate | Offsite Dose Calculation Manual Fire Protection Program |
ML20202G884 | 6 February 1998 | Revised Proposed TS Pages,Revising Allowed Outage Times for 4kV Emergency Bus Trip Functions & Replace Generic Actions for Inoperable Instrument Channels w/function-specific Actions | |
ML20202D402 | 6 February 1998 | Proposed Tech Specs Revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads | |
ML20202D562 | 6 February 1998 | Proposed Tech Specs Allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode | Hydrostatic Earthquake Fuel cladding Pressure boundary leak Offsite Circuit Fire Protection Program |
ML20199G592 | 7 January 1998 | Rev 0 to JAF-ISI-0003, Third ISI Interval,Ten-Yr ISI Plan | Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld |
ML20199G566 | 6 January 1998 | Rev 0 to JAF-ISI-0002, Third ISI Interval,Isi Program. W/28 Oversize Drawings | Packing leak Non-Destructive Examination Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Moisture barrier EVT-1 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld Scaffolding |
ML20203J697 | 12 December 1997 | Proposed Tech Specs,Revising Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions | Fire Protection Program |
ML20217J002 | 14 October 1997 | Proposed TS Pages Re Changes to Design Features Section, Including Revised Limits for Fuel Storage | Operating Basis Earthquake Design basis earthquake Earthquake Fire Protection Program |
ML20217G307 | 8 October 1997 | Proposed Tech Specs Re Distribution of Inoperable Control Rods | Shutdown Margin Scram Discharge Volume Overtravel Fire Protection Program |
ML20217K584 | 30 September 1997 | Rev 1 to Ja FitzPatrick Nuclear Power Plant IST Program for Pumps & Valves,Third Interval | Stroke time Hydrostatic Squib Cold shutdown justification Power Operated Valves |
ML20211H080 | 26 September 1997 | Revised Proposed TS Changes to ASME Section XI, Surveillance Testing | Stroke time Hydrostatic Fuel cladding Offsite Circuit |
ML20236N706 | 9 September 1997 | Proposed Tech Specs,Describing Licensee'S Configuration Risk Mgt Program Which Supports Rev of Allowed out-of-svc Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs | |
ML20149G257 | 14 July 1997 | JAFNPP ISI Program Relief Requests for 2nd Ten-Yr Interval Closeout | VT-2 Liquid penetrant Dissimilar Metal Weld |
ML20140D813 | 14 April 1997 | Proposed Tech Specs Re SRC Audit Requirements & Mgt Title Change | |
ML20198G721 | 3 April 1997 | Hot Rolled XM-19 Stainless Steel Core Shroud Tie-Rod Matl - Crevice Corrosion Investigation | |
ML20136H377 | 11 March 1997 | Rev 0 to Power Uprate Startup Test Rept for Cycle 13 | Shutdown Margin Temporary Modification Downpower Flow Induced Vibration |
ML20135B192 | 26 November 1996 | Proposed Tech Specs,Requesting That Snubber Operability, Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents | |
ML20134M175 | 20 November 1996 | Proposed Tech Specs Reflecting Interposed Amend That Was Issued,Updating References to Repts on TS Pp & Changing Rev Bars on Previously Submitted Update Pp Which Were Erroneously Positioned on Pp | Shutdown Margin |
ML20149L719 | 8 November 1996 | Proposed Tech Specs Re Min Critical Power Ratio Safety Limit | Fuel cladding |
ML20129G009 | 23 October 1996 | Proposed Tech Specs Re Page 134 Deleted Under Amend 236 & Remain Deleted | Fuel cladding |
ML20128Q744 | 11 October 1996 | Proposed Tech Specs Re Extension of Instrumentation & Miscellanous Surveillance Test to Accommodate 24 Month Cycles | Shutdown Margin |
ML20135D031 | 31 July 1996 | Rev 4 to Radiological Effluent Controls & Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20115G064 | 12 July 1996 | Proposed Tech Specs Re Cycle 12 Min Critical Power Ratio Safety Limit | |
ML20113B651 | 20 June 1996 | Proposed Tech Specs Re Option B to 10CFR50,App J for Primary Containment Leakage Rate Testing Program | Offsite Dose Calculation Manual Hydrostatic Process Control Program Fire Protection Program |
ML20112D153 | 30 May 1996 | Proposed Tech Specs,Revising Minimum Critical Power Ratio Safety Limit & Associated Basis | Abnormal operational transient Minimum Critical Power Ratio Fuel cladding Fire Protection Program |
ML20112D272 | 30 May 1996 | Proposed Tech Specs Re ATWS Recirculation Pump Trip Instrumentation Requirements | |
ML20112D571 | 30 May 1996 | Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements | Fire Protection Program |
JPN-96-023, Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B | 16 May 1996 | Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20108D117 | 24 April 1996 | Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day | Offsite Dose Calculation Manual Hydrostatic Process Control Program Fire Protection Program |