Proposed Tech Specs 3.11.B/4.11.B Re Crescent Area Ventilation
ML20107M451
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/24/1996
From:
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20107M438 List:
References
NUDOCS 9604300402
Download: ML20107M451 (6)


Text

- . _ - . . . - . . . .

l Attachment lil to JPN-96-017 MARKUP OF TECHNICAL SPECIFICATION PAGES l

l l

(JPTS-96-007) l NOTE 1: Deletions are shown in strikccut, and additions are in bold.

NOTE 2: Previous amendment revision bars are shown and will be deleted.

I l

l l

i l

l l

l l

l l

I New York Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50-333 9604300402 960424 DPR-59 PDR ADOCK 05000333 P ppg ,_

JAFNPP IABLE OF CONTENTS (Cont'd)

Eage l

F. ECCS-Cold Condition F. 122 I G. Maintenance of Filled Discharge Pipe G. 122a H. Average Planar Linear Heat Generation Rate H. 123 (APLHGR) 1.

Linear Heat Generation Rate (LHGR) 1. 124 J. Thermal Hydraulic Stability J. 124a SURVEILLANCE LIMITING CONDITIONS FOR OPERATION REQUIREMENTS

, 3.6 Reactor Coolant System 4.6 136 A. Pressurization and Thermal Limits A. 136 B. DELETED C. Coolant Chemistry C. 139

, D. Coolant Leakage D. 141 E. Safety and Safety / Relief Valves E. 142a F. Structural integrity F. 144 G. Jet Pumps G. 144 H. DELETED

1. Shock Suppressors (Snubbers) 1. 145b 3.7 Containment Systems 4.7 165 A. Prima Containment A. 165 B. Stand Gas Treatment System B. 181 C. Secon ry Containment C. 184 D. Primary Containment Isolation Valves D. 185 3.8 Miscellaneous Radioactive Material Sources 4.8 214 3.9 Auxiliary Electrical Systems 4.9 215 A. Normal and Reserve AC Power Systems A. 215 B. Emergency AC Power System B. 216 C. Diesel Fuel C. 218 D. Diesel-Generator Operability D. 220 E. Station Batteries E. 221 F. LPCI MOV Independent Power Supplies F. 222a G. Reactor Protection System Electrical Protection G. 222c Assemblies 3.10 Core Alterations 4.10 227 A. Refueling interlocks A. 227 B. Core Monitoring B. 230 C. Spent Fuel Storage Pool Water Level C. 231 D. Control Rod and Control Rod Drive Maintenance D. 231 3.11 Additional Safety Related Plant Capabilities 4.11 237 A. Main Control Room Ventilation A. 237 B. Crescent-Aree-Ventilation DELETED B- 289 C. Battery Room Ventilation C. 239 l

l Amendment No. 20r43,08,113,168 li

JAFNPP .

3.11 LIMITING CONDITIONS FOR OPERATION 4.11 SURVEILLANCE REQUIREMENTS .

3.11 ADDITIONAL SAFETY RELATED PLANT CAPABILITIES 4.11 ADDITIONAL SAFETY RELATED PLANT CAPABILITIES Acolicability: Acolicability:

Applies to the operating status of the main control and Applies to the surveillance requirements for the main relay rooms, and battery room , and cresccrt crec control and relay room, battery room , crescent crea ventilation and cooling. Applies to emergency service ventilation systems, emergency service water and intake water system and intake deicing heaters. deicing heaters.

Obiective: Obiective:

To assure the availability of the main control and relay To verify the operability or availability under conditions room, and battery room , and creccent arca ventilation for which these capabilities are an essential response to systems, to assure the availability of the emergency plant abnormalities.

service water system and intake deicing heaters, under the conditions for which the capability is an essential response to plant abnormalities.

A. Main Control Room Ventilation A. Main Control Room Ventilation ,

1. The reactor shall not have a coolant 1. Each of the control room emergency ventilation temperature greater than 212 *F and fuel may air supply fans and dampers shall be tested for not be handled unless both of the control room operability every 3 months.

emergency ventilation air supply fans and fresh air filter trains are available for normal The fresh air filter trains shall be tested once operation except that one emergency every 6 months as follows:

a. Pressure drop test across each filter and the filter system.

Amendment No.

1 237

JAFNPP .

3.11 (cont'd) 4.11 (cont'd) .

B. DELETED B. DELETED Crcccert ,^ rec Verti!ctica Crcsecnt /' rec Venti!ction c,. ._ .. ..,

- . . .., . . -.,.. ..: r.~- ~. ..: _. .,

~ - ., a _ ,. : ,. .,. 3- ,. .y..r..~...~

. : ., _ - ., . ,u i. n. u .., , ..,:.,,,,_im._

.....~.~...:~.3. - .. , C.c, ,

c, e,., .. - ._. . r. -. _~ .. ., .,..~u..i. n. u-Operab!c cn a cont: ucus basic whencver specification 3.5.^, demonstrated Operab!c cncc/3 montSc.

O C

~ ~ . o , ., a O, . C, ~c , ...,... .~y.

. ~ , . . . .. .:

... .a . u.~,. . .-

. .. :-. s.

~  :,,.a .

2. Each un t ccc!cr's icmperature contro! :strument cha!! bc l c

1 rcm and after the dcic that cre than ca!ibrated oncc/cperating cyc!c.

, _One,. u -iu, nit, coc!cr

_~,~..~.3,Cc,.,c,.~e,,~.,.,.y.,-..,~.,..,:.,

. . - . . . . . ~ .. ....u,,~...~~.....u-

m. ~ . .~

cresccrt crec cre made or found to be inoperab!c, c!!

ECCS components i'.,that half of the c cccent,c ca chc!!

u ,- ~. ,. .:. a m. ,.~a . .,. u.,,.,,

.~ ~.~ . , .  : . ~~r,s~., .~ ~..w y i < ~. .r. .~, . - ~, ,, .

e

,~,l < ! - . !... -,,. O, ~C . .A . O, ~C ._D.~, .- c

.r~..~ , , . ., A .O, ~C ~.

2. !f 3. .B.' connot be r^ct, the rccctor chc!! be p!cced in a ee!d condition v thin 2' hours.

C. Batterv Room Ventilation C. Batterv Room Ventilation Battery room ventilation shall be operable on a continuous Battery room ventilation equipment shall be demonstrated basis whenever specification 3.9.E is required to be satisfied. operable once/ week.

1. From and after the date that one of the battery room 1. When it is determined that one battery room ventilation ventilation systems is made or found to be inoperable, its system is inoperable, the remaining ventilation system shall associated battery shall be considered to be inoperable be verified operable and daily thereafter.

for purposes of specification 3.9.E.

2. Temperature transmitters and differential pressure switches shall be calibrated once/ operating cycle.

Amendment No. A.O., O ")

_, 1. ") C , 1 9. A. , 1 A. O . , 1. C~C 239

JAFNPP .

3.11 & 4.11 BASES A. Main Control Room Ventilation System B. DELETED Cresecrt .^ rec Venti!ction One main control room emergency ventilation air supply fan provides adequate ventilation flow under accident conditions. Enginccring analy000 indicate that the temperaturc risc in Should one emergency ventilation air supply fan and/or fresh scfcguards compartments without cdcquate ecnti!ction '!cr. Or air filter train be out of service during reactor operation, a Occ!ing is such that continued Operation Of the safeguards repair time of 14 days is allowed because during that time, a equipment or coccciated cuxiliary equipment cannot be caccred.

redundant 100% capacity train is required to be operable.

C. Batterv Room Ventilation The 3 month test interval for the main control room emergency ventilation air supply fan and dampers is sufficient Engineering analyses indicate that the temperature rise and since two redundant trains are provided and neither is hydrogen buildup in the battery, and battery charger normally in operation. compartments without adequate ventilation is such that continuous operation of equipment in these compartments A pressure drop test across each filter and across the filter cannot be assured.

system is a measure of filter system condition. DOP injection measures particulate removal efficiency of the high efficiency D. Emeraency Service Water System particulate filters, A Freon-112 test of charcoal filters is essentially a leakage test. Since the filters have charcoal of The ESWS has two 100 percent cooling capacity pumps, each known efficiency and holding capacity for elemental iodine powered from a separate standby power supply. The ESW and/or methyl iodine, the test also gives an indication of the system supplies lake water to cool equipment required to relative efficiency of the installed system. Laboratory analysis function following an accident. This equipment consists of:

of a sample of the charcoal filters positively demonstrates emergency diesel generators, electric bay unit coolers, cable halogen removal efficiency. These tests are conducted in tunnel / emergency switchgear room coolers, crescent area accordance with manufacturers' recommendations. coolers, control room air handling units and relay room air handling units. Emergency service water is initially supplied to The purpose of the emergency ventilation air supply system the control room chillers and ciuller room air handling units capacity test is to assure that sufficient air is supplied to the unless ESW is manually realigned to supply the control room main control room so that a slight positive pressure can be and relay room air handling units. ESW will also supply water to maintained, thereby minimizing in-leakage. the control rod drive pump coolers which are not automatically isolated following an accident. The surveillance requirement compares pump performance with the pump curve to determine pump operability. It also specifies testing at a Amendment No. ,120,223 243

I i

Attachmtnt IV to JPN 96-017 f.' ,

I LIST OF COMMITMENTS i (JPTS-96-007)

C*mmitment No. Description Due Date

! JPN-06 017 01 Relocate the Specifications and Bases for Within 30 days of l the Crescent Area Ventilation system to Amendment issue date l an Authority controlled procedure.