ML20069P670

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Replacing Generic Control Room Outside Air Intake Radiation Monitor Alarm/Trip Setpoint W/Site Specific Setpoint
ML20069P670
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/22/1994
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20069P669 List:
References
NUDOCS 9406270069
Download: ML20069P670 (3)


Text

_

7 TABLE 3.3-6 '

O m .

E RADIAil0N MONITORING INSTRUMINTATION O

m MINIMUM use CHANNEL 5 APPLICABLE

@@ ' INSTRIDENT AtARM/ TRIP MEASUREMENT OPERABLE MDDI S LE SilPOINI RANGE ACTION

>N 3 1. AREA MONITORS

a. Fuel Storage Pool Area M

Fuel Mandling og Building 8o Ventilation Systes

. n8$

Isolation 2 '* 4

< 100 mR/n 10'I - 10 mR/h

' E[ b. Containment - Purge & 1/ train 1, 2, 3, 4 & ** 40 mR/h or 5 20 - 5x10 mR/h 24 Exhaust Isolation < 2x background 25 w ~hichever w is s.

higher w 2. PROCESS MONITORS

% a. Containment Atmosphere

1) Gaseous Activity RCS Leakage Detection 1, 2, 3, & 4 -6 1 pCl/cc 1 Not Applicable 10 23
2) Particulate Activity RCS Leakage Detection 1, 2, 3, & 4 1 Not Applicable 10

-11 6 pCl/cc 23

b. Control Room Intake Monitors -8 1/ intake All MODES < 2x background 10 2 pCI/cc 26

.E c. Steam Generator 81 W

& Monitor 1, 2, 3, & 4 -3 pCl/cc -6 3

1

-< 10 10 1 pCi/cc 28 E d. Component Cooling Water Monitors A&B 1/line 10'I 2 pCi/cc

r All MODES $ 10'#p ci/cc 28 l
c. Component Coo 1ing

'$ -4 pCi/cc -7 Monitor A/B 1 1, 2, 3, & 4 5 10 10 - 10

-2 pCf/cc 28

'With irradiated fuel in the storage pool.

    • During CORE ALTERATIONS or movement of irradiated fuel within the containment.

b_ . _ _ _ _ _ _ _ _ _ . .

i

.i

)

i

=

i t

i r

?

NPF-38-154 ATTACHMENT B i

i 4

i i

TABLE 3.3-6 RADIATION HONITORING INSTRUMENTATION -

MINIMUM ,

CHANNELS APPLICABLE ALARM / TRIP MEASUREMENT INSTRUMENT OPEPABLE MODES SETPOINT RANGE ACTION

1. AREA HONITORS
a. Fuel Storage Pool Area Fuel Handling Building Ventilation System Isolation 2
  • s 100 mR/h 10 104 mR/h 24
b. Containment - Purge & 1/ train 1. 2. 3. 4 & ** 40 mR/h or 20 - 5x105 mR/h 25 Exhaust Isolation s 2x background whichever is HigFer
2. PROCESS HONITORS
a. Containment Atmosphere
1) Gaseous Activity RCS Leakage Detection 1 1. 2. 3. & 4 Not Applicable 10 10-1 pCi/cc 23
2) Particulate Activity RCS Leakage Detection 1 1. 2. 3. & 4 Not Applicable 10 10-6 Ci/cc 23
b. Control Room Intake Monitors 1/ intake ALL MODES s 4.09x10;5gCi/cc 10 10-2 Ci/cc 26 l
c. Steam Generator Blowdown Monitor 1 1. 2. 3. & 4 s 10-3 Ci/cc 10-6 _ 10-1 pCi/cc 28 d Component Cooling Water Monitors A&B 1/1ine ALL MODES s 10-4 Ci/cc 10 IC 2 Ci/cc 28 .
e. Component Cooling Water l Monitor A/B 1 1. 2. 3. & 4 s 10-4 Ci/cc 10 10-2 Ci/cc 28
  • With irradiated fuel in the storage pool.

o*During CORE ALTERATIONS or movement of irradiated fuel within the containment.

WATERFORD - UNIT 3 3/4 3-29

_ w , a