ML20065T742

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Radiographic Test Indications on Safety Injection Tanks & Reactor Pump Supports.Results of safe-end Indication Evaluation Expected by 830114.Work on Approved Repair Plan Commenced 820913
ML20065T742
Person / Time
Site: Satsop
Issue date: 10/26/1982
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20065T738 List:
References
10CFR-050.55E, 23, GO3-82-1096, NUDOCS 8211020676
Download: ML20065T742 (2)


Text

s 7

Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 October 26, 1982 G03-82-109,6 U . S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, California 94596-5368 Attention: Mr. D. M. Sternberg Chief, Reactor Projects Branch' No. 1

'Subj ect"~~ P0TENTIAL 10CFR50.55(e) DEFICIENCY RT INDICATIONS, SAFETY INJECTION TANKS AND REACTOR PUMP SUPPORTS (0/N #23)

Reference:

Letter, G03-82-831, dated August 20, 1982, Mr. R. S . Leddick to Mr. D. M. Sternberg, same subject.

Ebasco, in conjunction with Combustion Engineering (CE), was directe8 by the Supply System to assure an evaluation of the safe-end indica-tions (associated with the subject deficiency) was performed per 10CFR50.55(e). The referenced letter reported that this evaluation was not complete; however, upon completion, the results would be forwarded to your office by October 22, 1982. To date, the evaluation has not been completed. It is anticipated that the results will be l

provided to your office by January 14, 1983.

The status of repair actions taken is as follows:

o CE has submitted an ASME Section XI repair plan documenting the rework required per,the disposition of Oe original NCR.

e The repair plan was approved by Oa 5 opiy System and the work commenced on September 13,1%!

o Grinding operations revealed edditional indications that were not indicated on the RT film. CE elected to remove the indica-tions rather than evaluate the relevancy of the indications.

e Final PT of the excavation areas was accepted by CE QA Representa-tives and the Supply System on October 13, 1982.

8211020676 821026 DRADOCK05000g

l i

'/

. Mr. D. M. Sternberg October 26, 1982

/ Page 2 G03-82-1096

"/  !

l

/ Excavated areas were fully mapped on the table attached to the repair e

/ plan to show the length, width and depth of the indications.

/ e Car' bon steel base metal was encountered during the grinding operations.

'/ Therefore, an additional CE welding procedure was re, quired. The

> procedure was 6,froved by the Supply System and added to the repair pl an.

/

e The welding, required to build up the excavated areas, commenced on October 13, 1982. It is expected that the weld repair and PT will be completed by the first week of November,1982.

e CE's initial evaluation has determined that the defects were not significant (i.e., not reportable per 10CFR50.55(e) ).

Should you have any questions or desire additional information, please contact me directly.

"f,TP O. . =-

R. S. Leddick (761)

Program Director, WNP-3 DRC:nj cc: Mr. J. Adams - NESCO Mr. D. Smithpeter - BPA Ebasco - New York WNP-3 Files - Richland l

l

._