Forwards Rev 1 to Millstone Unit 2 Cycle 11 Core Operating Limits Rept
ML20065N590
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/05/1990
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065N594 List:
References
MP-90-1274, NUDOCS 9012120207
Download: ML20065N590 (1)


Text

- - - - - - - - - - - - - - - - -

gggg @yg G:n rrJ Offloss*Sildin Street, Berhn Conr>2cticut

. 9 g

l

'T, E*.

N .$"N N."e @..'ttN N c"co Sn*7 Yu$t[.YINcMeany n

P.O. BOX 270 HARTFORD. CONNECTioVT 06414-0270 Perth.ast Nuclear EnFDy Company (203)66s-6000 Docket No. 50-336 December 5, 1990 MP-90-1274 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 Core Ooerating Limits Reoort - Revision 1 In a letter dated November 5,1990,m Northeast Nuclear Energy Company (NNECo) submitted to the NRC staff Revision 0 of the Core Operating Limits Report (COLR) for Cycle 11 of Millstone Unit No. 2.

Due to high Total Integrated Radial Peaking Factor ( phi') values currently being mea-sured in the Millstone Unit No. 2 reactor, analyses have been completed which increase the allowable FI limits. This increase in the allowable FJ limits was accommodated by restricting the control rod Power Dependent insertion Limit PDIL) at power levels great-er than 80% power. The higher than expected measured FI(values are being cause combination of underpredicted local peaking factors and a higher than expected azi-muthal power tilt.

Additional analyses are beiny performed to justify the higher FJ limits by restricting

.other parameters related to Fr . It is expected that these analyses will be comp;eted and the COLR will again be revised in January 1991.

In accordance with the Millstone Unit No. 2 Technical Specifications, Section 6.9.1.7.d, NNECo hereby submits Revision 1 to the Millstone Unit No. 2 COLR.

Very truly yours, NORT HEAST NUCLEAR ENERGY COMPANY 7"

f

/ Director, Si b{

n E. Scace

~.] W Millstole Station ec: T.T. Martin, Recion 1 Administrator G.S. Vissing, NRC Project Mana;er, Millstone Unit No. 2 W.J. Raymond, Senior Resident Lnspector, Millstone Unit Nos.1, 2, and 3

  • E.J. Mroczkr. letter to U.S. Nuclear Regulatory Commission, " Millstone Nuclear Power Station, Unit No. 2 Core Operating Limits Report - Revision 0", dated November 5,1990 9012120207 901205 PDR P

ADOCK 05000336 PDC