MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217F8011999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B6491999-09-15015 September 1999 Informs That Encl Announcement Re 990913 Application for Amend to Licenses NPF-9 & NPF-7 Forwarded to C Observer in North Carolina,For Publication ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A0501999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementing Code Case for Duration of Insp Interval ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211J3671999-08-31031 August 1999 Forwards Public Notice of Application for Amend to License NPF-9 Seeking one-time Extension of Surveillance Frequency for TS SR 3.1.4.2 Beyond 25% Extension Allowed by TS SR 3.0.2 ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211K8831999-08-26026 August 1999 Forwards Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211G5181999-08-24024 August 1999 Forwards SE Re second-10-yr Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210R0031999-08-10010 August 1999 Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML20209H1551999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for May 1999 Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20209G5151999-07-0808 July 1999 Forwards Amended Pages to Annual Radioactive Effluent Release Repts, for 1997 & 1998 for McGuire Nuclear Station. Portion of Rept Was Inadvertently Omitted Due to Administrative Error,Which Has Been Corrected 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196G3721999-06-24024 June 1999 Documents Verbal Info Provided to NRR During Conference Call Re Relief Requests 98-002 & 98-003 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20196E9541999-06-18018 June 1999 Forwards SG Tube Insp Conducted During Unit 1 End of Cycle 11 Refueling Outage.Attachments 1,2,3 & 4 Identify Tubes with Imperfections in SGs A,B,C & D,Respectively ML20195K3601999-06-14014 June 1999 Forwards MORs for May 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised MORs for Apr 1999.Line 6 Max Dependable Capacity (Gross Mwe) on Operating Data Rept Should Be Revised to 1114 from Jan 1998 to Apr 1999 ML20195K4571999-06-14014 June 1999 Forwards MORs for May 1999 & Revised MORs for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20195J1691999-06-10010 June 1999 Forwards Written Documentation of Background & Technical Info Supporting Catawba Unit 1,notice of Enforcement Discretion Request Re TS 3.5.2 (ECCS-Operating),TS 3.7.12 (Auxiliary Bldg Filtered Ventilation Exhaust Sys) 1999-09-09
[Table view] |
Text
r: v
,. Il I Duke Twer Company Ai S Ttxnav P.0 BoxI M Semor Vice President
. Charlotte, NC28201 IW)6 Nuclear Generation (70&82-2200 Olhce (704)3824360 Fax DUKEPOWER April 12,1994 U.S. Nuclear Regulatory Commission ATEN: Document Control Desk Washington, D.C. 20555
Subject:
McGuire Nuclear Station Units 1 & 2 Docket Nos. 50-369,370-Catawba Nuclear Station Units 1 & 2 Docket Nos. 50-413,414 Oconee Nuclear Station Units 1,2 & 3 Dockets Nos. 50-269,270,287 Proposed Technical Specification Changes, Supplement 2 Gentlemen:
By letter dated November i1,1993 and supplemented February 23,1994, Duke Power Company submitted proposed amendments to the Technical Specifications (TS) for Catawba, McGuire and Oconce Nuclear Stations which made various changes to the Administrative section of TS and other editorial changes, Subsequently, during conversations with members of your staff concerning the changes being proposed to the " Technical Review and Control Activities" section, it was decided to revise only this section in order to expedite the approval process for the entire submittal.
Accordingly, please find attached the revised pages to be included with the original submittal and Supplement 1. A copy of this supplement has been sent to the appropriate North Carolina and South Carolina State Oflicials.
If you have any questions concerning the enclosed information, please call A.D. Jones Young at (704)382-3154, i Very truly ours,
, J
'. Gric n
Nuclear Generation 9404200348 9404t2 'y 0 0
PDR ADOCK 05000269 i1\
P PDR '
L l m s,on y -w u.a
U.S. NRC April 12,1994 Supplanent 2
. Page 2 xc: S. D. Ebneter Regional Administrator, Region !!
V. Nerses, ONRR L. A. Wiens, ONRR R. E. Martin, ONRR G. F. Maxwell Senior Resident Inspector (MNS)
P. E. Ilarmon Senior Resident Inspector (GNS)
R. J. Freudenberger Senior Resident Inspector (CNS)
Dayne Brown, Chief Division of Radiation Protection P.O. Box 27687 Raleigh, N. C. 27611-7687 Heyward Shealy Bureau of Radiological Health S. C. Department of Health and Environmental Control 2600 Bull Street Columbia, S.C. 29201
-i
..- , C---
ATTACHMENT I Duke Power Company Catawba Nuclear Station McGuire Nuclear Station Oconee Nuclear Station Technical Discussion, No Significant Hazards and an Environmental Impact Analysis Technical Discussion i
The purpose of the proposed amendment requests for Catawba, McGuire I and Oconee Nuclear Stations are to:
- 1. Realign the NSRB such that it reports to the Senior Vice-President of the Nuclear Generation Department.
- 2. Change the reference from " Semiannual" Radioactive Effluent Release Report to " Annual" Radioactive Effluent Release Report in the Liquid Effluents TS (Catawba and McGuire Only) and in the Gaseous Effluents TS (Catawba only).
- 3. Under the " Procedures and Programs"section (McGuire and Catawba only) and under the " Technical Review and Control Activities" section (Oconee only), change the reference from
" group" manager to " appropriate division" manager.
- 4. Under the " Technical Review and Control Activities"section:
- a. Delete the titles of I and E Superintendent and Mechanical Superintendent from the list of people who can approve modifications to nuclear safety-related structures, systems, and components, prior to implementation, for the Station Manager. Replace their titles with the title of Maintenance Superintendents. Also, add the title of Manager of Engineering to the list of people who can approve mcdifications, prior to implementation. In sections 6.5.1.5 and 6.6.lb (CNS and MNS only) and section 6.1.2.le (ONS only), replace the titles of I and E Superintendent and Mechanical Superintendent with the title of Maintenance Superintendents,
- b. Clarify the responsibilities of the Safety Assurance Manager,
- c. For Oconee only, delete the requirement to perform an annual independent Fire Protection Audit.
The bases for these changes are provided in the following paragraphs.
Attachment I
. April 12, 1994 Page 2
- 1. Realign the NSRD such that it reports to the Senior Vice-President of the Nuclear Generation Department.
This administrative change is being made to reflect the realignment of the NSRB such that it reports to the Senior Vice-President of the Nuclear Generation Department. This realignment is in recognition of the fact that almost all of the activities conducted by the NSRB are for the nuclear function and therefore puts these activities under the direct control of the Senior Nuclear Officer in the company.
As part of November 1, 1991 reorganization, the NSRB reported to the Manager of the Quality Verification Department, who was also the NSRB Director and reported directly to the Executive Vice-President of Nuclear Generation. This organizational structure is depicted in Figures 1 and 2. With the most recent reorganization of the Nuclear portion of the General Office, the NSRB would report to the Manager of Nuclear Assessment & Issues Division, who is also the Director of the NSRB, and who reports directly to the Senior Vice-President of the Nuclear Generation Department. This organizational structure is depicted in Figures 3, 4 and 5. The NSRB will now report to and be appointed by the Senior Nuclear Officer in the company. There will be no changes in the responsibilities or composition of the NSRB.
With the dissolution of the Quality Verification Department, the Quality Verification Department Audits mentioned in the Catawba and McGuire Nuclear Station TS will be renamed the Quality Assurance Program Audits and the Quality Assurance Department Audits mentioned in the Oconee Nuclear Station TS will also be renamed the Quality Assurance Program Audits.
- 2. Change the reference from "Bemiannual" Radioactive Effluent Release Report to " Annual" Radioactive Effluent Release Report in the Liquid Effluents TB (Catawba and McGuire Only) and in the Gaseous Effluents TB (Catawba only).
By letters dated January 27, 1993, supplemented March 15, 1993 and June 4, 1993 for McGuire and letters dated February 25, 1993, supplemented May 20, 1993 and August 31, 1993 for Catawba, Duke Power submitted a proposed amendment to the TS for McGuire and Catawba Nuclear Stations,-which revised the frequency of the Radiological Effluent Release Report. On July 19, 1993 the NRC approved the proposed amendment for McGuire and approved Catawba's proposed amendment on September 16, 1993. Subsequently, during a review of TS, additional j references to the Semiannual Radiological Effluent Release l Report was discovered. The Technical Discussion, No j Significant Hazards and Environmental Impact Analysis contained l in Duke's original submittals and in the NRC's Safety i
l
Attachment I April 12, 1994 Page 3 Evaluation of the amendments remain valid.
- 3. Under " Procedures and Programs" (McGuire and Catawba only) and under " Technical Review and Control Activities" (Oconee only), change the reference from
" group" manager to " appropriate division" manager.
This administrative change reflects the appropriate functional designation of authority. The functional designations had not been finalized when Duke Power submitted its " Reorganization" TS amendments dated January 8, 1992 and supplemented February 13, 1992. These amendments were approved by the NRC on June 2, 1992.
- 4. Under the " Technical Review and Control Activities" section:
- a. Delete the titles of I and E Superintendent and Mechanical Superintendent from the list of people who can approve modifications to nuclear safety-related structures, systems, and components, prior to implementation, for the Station Manager. Replace their titles with the title of Maintenance Superintendents. Also, add the title of Manager of Engineering to the list of people who can approve modifications, prior to implementation. In sections 6.5.1.5 and 6.6.1b (CNS and MNS only) and section 6.1.2.le (ONS only), replace the titles of I and E Buperintendent and Mechanical Superintendent with the title of Maintenance Superintendents.
The I and E superintendent and Mechanical Superintendent titles are being deleted and replaced with the title of Maintenance Superintendents to reflect the new Site organizational structure. This change is purely administrative. The Manager of Engineering is being added to the list of people who can approve proposed modifications because the Manager of Engineering has overall responsibility for the design of modifications that are implemented on nucleap safety-related structures, systems and components and therefore is as equally responsible as the Station Manager for ensuring nuclear safety. Also, adding the Manager of Engineering to the list of people who can approve proposed modifications delegates approval authority to the appropriate Site 1 supervisory staff in the event of the unavailability of the !
Station Manager or his designated direct reports. l l
l l
l
Attachment I April 12, 1994 Page 4
- b. Clarify the responsibilities of the Safety Assurance Manager The responsibility of the Safety Assurance Manager is being clarified to show that he is only responsible for assuring the development and issuance of reports identifying reportable incidents, unplanned onsite releases of radioactive material and TS violations, but does not necessarily need to approve these reports.
These reports are reviewed and approved by the appropriate Site Management. This change brings the Safety Assurance Manager's responsibilities in line with his other responsibilities designated in TS.
- o. For Oconee only, delete the requirement to perform an annual independent Fire Protection Audit The current TS wording in Snction E.1.2.1.j requires an annual independent Fire Protaction Audit. This wording mandates the expenditure of resources to perform this audit annually regardless of the historical results.
The Duke Power Topical Report Quality Assurance Program reflects the requirements of ANSI N18.7 which requires audit frequencies be established commensurate with safety significance. The Duke Power Topical Report also requires audit data be analyzed and the audit schedule be modified as necessary to assess potential weaknesses. This revision will allow the scheduling of fire protection audits based on past performance, but not to exceed three years, rather than an arbitrary requirement of annually. This revision will also allow the expenditure of limited audit resources to be devoted to areas of potential weaknesses rather than auditing predetermined areas without consideration of the strength or weakness of the area based on past performance indicators. This approach was previously approved by the NRC for McGuire Nuclear Station on June 2, 1992 and for Catawba Nuclear Station on May 7, 1992.
No Significant Hazards Analysis 10 CFR 50.91 requires that the following be provided concerning whether the proposed amendment requests involved a significant hazards consideration as defined in 10 CFR 50.92. Standards for determination that an amendment request does not involve a significant hazards consideration are if operation of the facility in accordance with the proposed amendment would not: 1) Involve 4
d Attachment I April 12, 1994 Page 5 a significant increase in the probability or consequences of an accident previously evaluated; or 2) Create the possibility of a new or different kind of accident from any previously evaluated; or, 3) Involve a significant reduction in a margin of safety.
l The Proposed revisions to realign the NSRB such that it reports to the Senior Nuclear Of ficer, change the reference from Semiannual to Annual, change the reference from group to division, delete the titles of I and E Superintendent and Mechanical Superintendent and replace them with the title of Maintenance Superintendents, add the Manager of Engineering to the list of people who can approve Modifications for the Station Manager, clarify the responsibilities of the Safety Assurance Manager, and delete the requirement to perform an annual independent Fire Protection Audit will not involve a significant increase in the probability or consequences of an accident previously evaldated because the changes do not have any impact upon the design or operation of any plant systems or components.
The proposed revisions will not create the possibility of a new or different kind of accident from any previously evaluated because the changes are administrative in nature and operation of Catawba, McGuire, and Oconee Nuclear Stations in accordance with these TS will not create any failure modes not bounded by previously evaluated accidents.
The proposed revisions will not involve a reduction in a margin of safety because they are administrative in nature.
Accordingly, the proposed revisions do not involve a significant hazard.
Environmental Impact Analysis The Proposed TS amendments have been reviewed against the criteria of 10 CFR 51.22 for environmental considerations. The Proposed amendments do not involve a significant hazards consideration, nor increase individual or cumulative occupational radiation exposure, and there is no significant increase in the potential for or consequences from radiological accidents. Realignment of the NSRB' such that it reports to the Senior Nuclear Officer, changing the reference from Somiannual to Annual, changing the reference from group to division, deleting the titles of I and E Superintendent and Mechanical Superintendent and replacing them with the title of Maintenance Superintendents, adding the Manager of Engineering to-the list of people who can approve modifications, clarifying the responsibilities of the Safety Assurance Manager, deleting the requirement to perform an annual independent Fire Protection Audit are administrative changes. The proposed amendments do not involve
..._r. -,.m , ,. ...m , . , _ - - . ..~.,,_e, - _ -
Attachment I April 12, 1994 Page 6 any significant hazards considerations, nor increase the types or amounts of effluent released off-site. These changes will not increase the individual or cumulative occupational radiation )
exposures. Based on this, the proposed TS change meets the criteria given in 10 CFR 51. 22 (c) (9) for a categorical exclusion from the requirement for an Environmental Impact Statement.