MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm ML20107C3021995-10-16016 October 1995 Rev 8 to Odcm ML20199L1821995-09-0909 September 1995 Rev 3 to DB-OP-00000, Conduct of Operations ML20082V4071995-02-0303 February 1995 Offsite Dose Calculation Manual Rev 7 ML20072S8611994-06-22022 June 1994 Rev 6 to Davis-Besse Offsite Dose Calculation Manual ML20056F3071993-08-0808 August 1993 Rev 3 to Emergency Plan Off Normal (Epon) Occurrence Procedure HS-EP-02820, Earthquake. W/Rev 23 to Epon Occurrence Procedures Manual Table of Contents ML20035F2071993-02-15015 February 1993 Rev 0 to HS-EP-02850, Hazardous Chemical & Oil Spills ML20072S8401992-12-18018 December 1992 Rev 5 to Davis-Besse Process Control Program ML20072S8501992-12-18018 December 1992 Rev 5.2 to Davis-Besse Offsite Dose Calculation Manual, Reflecting Rev 5,Change 2 to ODCM ML20101R1721992-06-11011 June 1992 Rev 1 to Vol I of Inservice Insp Plan,Second 10-Yr Nuclear Interval Pump & Valve Inservice Testing Program ML20114C6321992-05-19019 May 1992 Change 1 to Rev 5 to ODCM ML20114C6301992-03-0606 March 1992 Rev 5 to ODCM ML20217C3661991-07-0808 July 1991 Rev 3 to Administrative Procedure NG-IS-00002, General Nuclear Security Requirements. Pages 7,9,10 & 15 Only ML20084U5911991-02-22022 February 1991 Rev 4 to ODCM ML20217C3481990-12-18018 December 1990 Rev 1 to Security Dept Procedure IS-DP-04007, Performance Test for Alco-Sensor ML20059D4181990-08-28028 August 1990 Second 10-Yr Interval Pump & Valve Inservice Testing Program ML20217C3001990-08-23023 August 1990 Rev 5 to Security Dept Procedure IS-AC-00011, Protected & Vital Area Badge Issuance & Control ML20217C3571990-08-0909 August 1990 Rev 3 to Security Implementing Procedure IS-AC-00516, Unescorted Access Requirements ML20217C3071990-07-27027 July 1990 Rev 2 to Security Dept Procedure IS-AC-00015, Fingerprint Processing & Controls ML20217C3201990-06-27027 June 1990 Rev 1 to Security Dept Procedure IS-AC-00018, Drug & Alcohol Testing Process ML20217C3811990-06-22022 June 1990 Rev 4 to Nuclear Group Procedure NG-IS-00004, Fitness for Duty Program ML20217C4001990-04-0202 April 1990 Corporate Ref Manual - Nuclear NU-102, Fitness for Duty ML20217C3401990-01-12012 January 1990 Rev 1 to Security Dept Procedure IS-DP-00101, Bac Simulation ML20217C3281989-11-0909 November 1989 Rev 1 to Security Dept Procedure IS-DP-00100, Bac Exams ML20217C3141989-10-25025 October 1989 Rev 2 to Security Dept Procedure IS-AC-00017, Denied Access List Control ML20217C3941989-08-0101 August 1989 Corporate Ref Manual - Human Resource HR-604, Drug & Alcohol Policy ML20244A8421989-05-31031 May 1989 Pressurizer Surge Line Thermal Stratification Phase I Program ML20213A0361987-03-31031 March 1987 Rev 1 to Davis Besse Emergency Procedure Verification & Validation Program ML20213A0311987-03-31031 March 1987 Rev 2 to Vol IV of Procedure Writers Manual:Operation Procedures Guidelines ML20212D1621987-01-27027 January 1987 Rev 1 to Maint Procedure MP 1411.06, Preventive Maint for Type Smb & Smc Valve Operators ML20198D2551986-12-27027 December 1986 Rev 2 to Maint Procedure MP 1411.04, Maint & Repair of Limitorque Valve Operators Type SMB-000 & SMB-00. Temporary Mod Request T-9969,indicating Rewiring of Fcr 85-302 MU-11 to Torque Out in Open Direction,Encl ML20212B5721986-12-15015 December 1986 Rev 0 to Security Training & Qualification Plan, Superseding Rev 24 to App B of ISP AD1808.00.W/o Revised Pages ML20212C9481986-11-21021 November 1986 Rev 8 to Maint Procedure Mpo 1410.32, Testing of Motor- Operated Valves Using Movats ML20212D3131986-10-28028 October 1986 Change 3 to Temporary Mods T10161 & T10144 to Rev 0 to Maint Procedure MP 1411.07, Maint & Repair of Limitorque Valve Opr Smc 04, Incorporating Fcr 86-0092,Rev a Re Removal & Installation of Limiter Plate ML20212D1091986-10-21021 October 1986 Change 1 to Rev 2 to Maint Procedure MP 1411.04, Maint & Repair of Limitorque Valve Operators Type SMB-000 & Smb 00, Addressing Need for Procedure to Address Replacement of Defectrive Parts ML20212D1471986-10-0303 October 1986 Rev 1 to Maint Procedure MP 1411.05, Maint & Repair of Limitorque Valve Operators Types SMB-0 Through SMB-4 ML20212C9181986-09-22022 September 1986 Rev 1 to Procedure NEP-092, Establishing D/P Limits & Tests for Q Motor Operated Valves ML20203M0201986-08-21021 August 1986 Specs for Mist Continuous - Venting Tests ML20210V1131986-08-20020 August 1986 Rev 0 to Emergency Plan Implementing Procedure EP-2320, Emergency Technical Assessment ML20206P6511986-06-30030 June 1986 GE Owners Group Action Plan as Result of Davis-Besse Event, June 1986 ML20198D2361986-05-0202 May 1986 Rev 5 to Maint Procedure MP 1410.32, Testing of Motor- Operated Valves Using Movats ML20141J5231986-04-18018 April 1986 Human Engineering Discrepancy Review & Closeout Process for Davis-Besse Dcrdr Program ML20205M6981986-04-0707 April 1986 Rev 0 to Nuclear Engineering Procedure NEP-092, Establish Differential Pressure Limits & Tests for Motor-Operated Valves ML20205M7031986-03-25025 March 1986 Rev 0 to Nuclear Engineering Procedure NEP-091, Motor- Operated Valve (MOV) Data Evaluation ML20141N1501986-02-26026 February 1986 Procedure Fcr 85-227, Main Feedwater Block Valve Interlock ML20141N1561986-02-26026 February 1986 Procedure Fcr 85-200, Main Feedwater Pumps Rapid Feedwater Reduction Speed Setpoint 1998-08-28
[Table view] |
Text
{{#Wiki_filter:r HP 1604.01 Davis-Besse Nuclear Power Station 9
Unit No. 1 Health Physics Procedure HP 1604.01 Personnel Decontamination s
I fp']')a EN!!
'((
- } f,
# 3Q Record of Approval and Changes 2/6/76 Prepared by Bruce L. Geddes Date Submitted by- '
b. k).
2 /l'O ~/ 7 N'
l l-Sec n Head Date
[
Recorrended by
/////M y-
"Sidi Chairman; tate;,
N A.008
'~ % '
h,
], QA Approved 1
Manager of ity Assurance Date'.
N D
Approved by
~
')
/'
Station Superintendent Date
~
Revision SRB
. QA Sta. S No.
Reco e ation Date Approved Date pp d
Date h
Y w in z
ys,.
sp.
/$
jf --
TD W } l % IIlI^LfEfL-I v3 f
W
'6 II Y i
8302180073 *30214 PDR ADOCK 05000346 F
PDR
1 HP 1604.01.4 1.
PURPOSE 1.1 This procedure delineates guidelines to be followed by all personnel in the methods of personnel decontamina-tion.
2.
REFERENCES 2.1 Davis-Besse Radiation Protection Manual, Section 3.5.4.2 2.2 US Department of Health, Education and Welfare Radio-logical Health Handbook 2.3 Health Physics Procedure - External Personnel Radiation Exposure Monitoring, HP 1602.01.
3.
EQUIPMENT NEEDED 3.1 Health Physics personnel contamination monitoring equip ment:
3.1.1 Rm-14 with HP 260 or HP 210 probe.
3.2 Protective clothing to prevent spread of contamination, j
such as plastic gloves, apron, bib, etc.
4 3.3 Personnel Decontamination Equipment (some of which could be):
3.3.1 Gauze pads 3.3.2 Cotton swabs 3.3.3 Nail clippers 3.3.4 Hair cutting equipment, such as clippers, scissors, etc.
3.3.5 Safety razor and blades 3.3.6 Soft brush 3.3.7 Mild hand soap 3.3.8 Special decontamination soap, such as Turco's "Decon Hand Soap" 4.
DATA SHEETS REQUIRED 4.1 Attachment II Personnel Contamination Worksheet I
2 HP 1604.01.4 mas l
S.
PRECAUTIONS AND SAFETY
=_'-_
4 5.1 Contact Chemistry and Health Physics Section personnel in event-of any contamination of the hands or body or any contamination of the ears, eyes, nose or throat.
5.2 Where contamination spread to open wounds is possible, contact the Chem'stry and Health Physics Foreman or his designee before decontamination is started.
5.3 Only water will be used to decontaminate the mouth or nose.
5.4 When washing, caution must be exercised to prevent break-ing the skin, as this creates a potential for internal contamination.
5.5 Never use water which is warmer than body temperature for washing, as this opens the body pores which may absorb contamination, creating a more difficult problem and potential internal contamination.
5.6 Decontamination shall be performed using the necessary precautions and protective clothing to prevent the spread
- man, ggg{}
of contamination.
5.7 Decontamination of skin with iodine absorption cannot be achieved.
If levels of sk'in contamination cannot be reduced after several attempts have been made, a whole 4
body count should be used to determine the presence of iodine contamination.
If contamination levels are greater
~
than 10,000 dpm, medical help may be necessary.
Iodine levels in the skin less than 10,000 dpm could be' released and so noted on Attachment I.
5.8 All personnel contamination / decontamination will be documented on Attachment II.
Forward the completed Attachment II to the Health Physics Supervisor.
6.
ONSIiE DECONTAMINATION PROCEDURE 6.1 Contamination of Hands or Body 6.1.1 If contamination is detected on the body of radiation worker, contact the Health Physics Department for assistance.
4 NOTE: A person is considered contaminated when there is greater than 100 cpm over background as indicated on a RM-14 Frisker or other
- fjy, similar instrument.
ige _
O
3 HP 1604.01.4
~
6.1.2 Thoroughly wash the affected areas with mild soap for 2-3 minutes.
When washing hands pay particular attention to finger nails and areas between fingers.
4 6.1.3 Use lukewarm water, using caution to prevent contamination from entering any body openings or skin breaks, wash, starting with the head and proceeding downwards.
6~.1.4 Rinse thoroughly with large amounts of clean water, dry and monitor with a survey instrument such as a RM-14 using HP 260 or HP 210 probe.
4 If contamination levels exist greater than 100 cpm above background, repeat the washing and rinsing process two (21 more times using fresh water for each wash.
6.1.5 When surveying for contamination, be sure to check in areas where contamination may be hidden. Areas not previously contaminated must be surveyed as contamination may have been-spread to those areas.
6.1.6 Decontamination is considered complete when the area is 100 cpm above background or less when monitored with an RM-14 with a HP 260 or HP 210 probe.
~
6 6.2 The following steps are to be performed under the supervision of Chemistry and Health Physics _ Foreman:
6.2.1 Cleanse the area with special decontamination soap, such as Turco's "Decon Hand Soap" (a soft brush may be used); dry the area and survey.
6.2.2 Repeat Scep 6.2.1 until contamination levels are 6
less than 100 cpm chove background or until there is no decrease in the level of contamina-tion.
6.2.3 If the contamination is located in and around the finger nails, clip or trim the finger nails as much as possible.
6.2.4 If none of the proceeding steps are sufficient to remove the contamination, any further decon-tamination will be administered by the Chemist and Health Physicist or a medical coordinator.
u mm
-mm mm m
s 4
HP 1604.01.4 6.3 Fair Contamination 6.3.1 Contamination of the hair shall require the'im-
- mediate noti. ication of the Chemistry and Health Physics Foreman or his designee.
6.3.2 If the contamination is present only in a small area, the hair may be cut off.
6.3.3 If washing is required, the hair should be washed with the individual in a position that will prevent the spread of contamination to other parts of the body.
6.3.4 Dry the hair and survey for contamination.
6.3.5 Continue Steps 6.3.3 and 6.3.4 until con-l 4
tamination levels are less than 100 cpm above the background or until there is no decrease in the level of contamination.
6.3.6 If none of the proceeding steps are sufficient to remove the contamination from the hair any further decontamination will be administered by the Chemist and Health Physicist or a medical coordinator.
6.4 Contamination of the Ea'r ~
6.4.1 Contamination of the ear shall require the immediate notification of the Chemi.stry and
~
Health Physics Foreman or his. designee.
6.4.2 Contamination in the outer ear may be decon-taminated with soap and tepid water on a cotton tipped swab, using care not to get any water in the inner ear. The swabs should only be damp and the individual shall tilt his head so that the ear is down.
6.4.3 Do not flush the ear with water or anything else.
6.4.4 Contamination in the inner ear or other methods of decontamination of the outer ear will only be administered under the supervision of the Chemist and Health Physicist or a medical coordinator.
=
9-y_
5 HP 1604.01.2 3-{
6.5 Contamination of the Eyes or Mouth 6.5.1 Contamination of the eyes or mouth shall require
' t-the immediate notification of the Chemistry and Health Physics Foreman or his designee.
6.5.2 The eyes and mouth may be flushed with tepid water but no other action may be taken.
6.5.3 When flushing the mouth, bend the individual L,7 over the sink to prevent swallowing of the water.
n.
=;
6.5.4 Any further decontamination steps will only be
-i-administered under the supervision of the Chemist and Health Physicist or a medical coordinator.
2 6.5.5 After decontamination, have the individual whole en body counted to evaluate internal exposure.
J$_[
6.6 Contamination of the Nose A-=
y B'
6.6.1 Contamination of the nose shall require the
~
-^
immediate notification of the Chemistry and Health Physics Foreman or his designee.
?
6.6.2 Have the contamin~ated individual blow his nose into a facial tissue or paper towel.
-L 6.6.3 Check the paper for contamination.,
6
_c_-
6.6.4 Check the nose for remaining contamination.
If contamination remains, a damp cotton swab may be r'
used for decontamination.
6.6.5 It is generally better if the contaminated
,gg individual performs the following steps himself:
- 1. Insert the damp swab into the nostril as far g
as possible.
Exercise caution so that the
_=
swab does not touch the sides of the nostril during insertion.
ql
- 2. Press the swab lightly against the sides of
=-
the nostril and withdraw in a circular motion c
so all sides of the nostril are wiped.
Check swab for contamination.
^3>
l 6.6.6 Continue Steps 6.6.5.1 and 6.6.5.2 until con-
=-
tamination levels are less than 100 counts above m
j--
==
w
6 HP 1604.01.3 background and are no longer decreasing or the nostril becomes tender.
6.6.7
-If none of the above steps are sufficient to remove the contamination, any further decon-tamination will be administered by the Chemist and Health Physicist or a medical coordinator.
6.6.8 After decontamination is complete, the indi-vidual showers and then will be whole body counted to check the internal exposure received.
7.
OFFSITE DECONTAMINATION PROCEDURE 7.1 Offsite Decontamination Facilities 7.1.1 Decontamination of a few plant employees during an emergency could be accomplished at the DBAB Radiological Testing Lab.
7.1.2 The major Decontamination Center for an evdcua-tion of Davis-Besse personnel is the TED Lindsey Service Center. This is located at State Route
- 590 and State Route #20.
7.2 Offsite Decontamination 7.2.1 The Chemistry and Health Physics Section is responsible for monitoring and decontamination of personnel evacuated from the DBNPS.
3 7.2.2 The Chemist and Health Physicist or his' designee will assign C&HP Testers to the Offsite Decontamin-ation Center to perform monitoring and decontamin-ation as required.
NOTE: The number of C&HP Testers assigned to the center will be determined by the number of DBNPS personnel evacuating to the center.
7.2.3 Personnel decontamination should first be attempted i
by using sealed towelettes or a spray foam and t
clean rags.
4 NOTE: This first method will generate very little liquid radwaste for easier clean
+
up.
7.2.4 Further decontamination should be accomplished in accordance with Section 6 of this procedure.
e
7 HP 1604.01.3 7.2.5 lists the equipment available from the Station Health Physics Monitoring Room for 3
use at the Offsite Decontamination Center.
Additional C&HP Tester Equipment, if required, is available upon approval by the Chemist and Health Physicist or his designee.
NOTE: Equipment should be picked up by and accompany the assigned C&HP Tester (s) to the Decontamination Center.
D O
8 HP 1604.01.3 0FFSITE DECONTAMINATION EQUIPMENT (Not all instruments will be required)
E-520 Survey Meter 1 ea PRM-4A with HP 210 Probe 1 ea RM-14 with HP 260 Probe 1 ea E-400 with HP 270 Probe 1 ea Additional supplies that may be required and should be considered are as follows:
1.,
A special decontamination soap such as "Turco's Decon Hand Soap" 2.
Soft brush 3.
Mild hand soap 4.
Cotton swabs 5.
Gauze pads 6.
Hair shampoo 7.
Towels 8.
Razors and shaving cream 9.
Towelettes 10.
Spray foam deconer Attachment l' Page 1 of 1
9 HP 1604.01.4 DAVIS-BESSE NUCLEAR POWER STATION PERSONNEL CONTAMINATION WORKSHEET NAME DATE TLD.
TIME LOCATION OF INCIDENT DESCRIPTION OF INDICENT:
.5 LOCATION OF HOW INITIAL 1st 2nd 3rd CONTAMINATION DETERMINED LEVEL DECON DECON DECON BI0 ASSAY AND/OR WHOLE BODY COUNT INFORMATION REMARKS i
C/H.P. Technician Date Health Physics Supervisor f--
END Page 1 of 1
_ _ _ _ _ _ _ _ - _ _ _ _ _ ____ ________ __}}