ML20063E316

From kanterella
Jump to navigation Jump to search
Confirms 820701 Verbal Info Provided Re Completed Tables to Seismic & Dynamic Qualification Summary & Status of Equipment Important to Safety.Info Will Be Submitted by 821215
ML20063E316
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/06/1982
From: Wuller G
ILLINOIS POWER CO.
To: Bernard H
Office of Nuclear Reactor Regulation
References
U-0513, U-513, NUDOCS 8207130383
Download: ML20063E316 (2)


Text

>g .

O s -

/

/LLIN0/S POWER COMPANY U"0013 L[f/}f'LO3-82(07-06)-6 w .,500 SOUTH 27TH STREET, DECATUR.,fLLINOIS 62525 July;6,s1982 Mr. Harold Bernard, Acting Chief Standardization & Special Proj ects Branch #, '

Division of Licensing Office of Nuclear Reactor Regulation -

U. S. Nuclear Regulatory. Commission -

Washington, D.C. 20555 '

Dear Mr. Bernard:

Reference:

1) NRC letter 12/11/81, J. R. Miller to G. Wuller, IP ? cubj ect: Request for; .

Information and' Schedule Concerning-Review of Seismic and Dynamic Qualification of Equipment

2) NRC letter 6/4/82,-H. Bernard to G. Wuller, IP, subj ect : -Seismic and Dynamic Qualification of Equipment Clinton Power Station Unit 1 Docket No. 50-461 l This is in response to the referenced letters and to confirm the verbal information provided to Mr. J. H. Williams on July 1. Illinois Power Company plans to submit the completed tables of information, " Seismic and Dynamic Qualification Summary-and Status of-Equipment Important to Safety", i.e. Attachment 1 to the referenced (1) letter, by December 15,. 1982. -

l l l l QOO 1

^ '

8207130383 B20706 ,

PDR ADOCK 05000461 PDR ,-

A

Mr. Harold Bernard U-0513 The information requested will be provided for ,

Staff review and selection of the specific equipment

. for the Clinton plant on-site audits. It is our understanding that concurrent audits will be conducted during March 1983 by the NRC Pump and Valve Operability Team (PVORT) and the Seismic Qualification Review Team (SQRT).

Sincerely, G. E. Wuller Supervisor - Licensing Nuclear Station Engineering

-GEW/lt cc: J. H. Williams, NRC Clinton Project Manager H. H. Livermore, NRC Resident Inspector Illinois Dept. of Nuclear Safety r ,,