ML20058E801
| ML20058E801 | |
| Person / Time | |
|---|---|
| Site: | Zimmer |
| Issue date: | 12/11/1981 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| Shared Package | |
| ML20058A387 | List:
|
| References | |
| FOIA-82-206 NUDOCS 8207300203 | |
| Download: ML20058E801 (1) | |
Text
r
(-
('
h0
/,povecoq'y /,
h
(
UNITED STATES
(
jg
',;/
NUCLEAR REGULATORY COMMISSION g
.. g REGION lli
'q d
799 ROOSEVELT ROAD y;
j' CLEN ELLYN,ILLINotS 60137 December 11, 1981 NOTE FOR: Victor Stello, Jr., Deputy Executive Director, Regional Operations and Generic Requirements FROM:
- James G. Keppler, Regional Administrator
SUBJECT:
BRIEFING OF C030!ISSIONER GILINSKY BY CINCINNATI GAS
& ELECTRIC COMPANY RE QUALITY ASSURANCE On November 13, 1981, Commissioner Gilinsky, and other NRC staff members toured the Zimmer construction site and subsequently met with Cincinnati Cas and Electric Company officials. As a planned part of the meeting, CG5E officials made a presentation on the detailed quality assurance / quality control practices associated with the production and acceptance of a six-inch pipe weld in a safety related system. This was followed by a discussion of the Zimmer Quality Confirmation Program and a description of Cincinnati Cas and Electric Company's present Quality Assurance Program.
A copy of the transparancies and handouts used during the presentation are enclosed.
_ :- hfe' vV n(/ James G. Keppler Regional Administrator
Enclosures:
as stated cc w/ enclosures:
H. R. Denton, NRR R. C. DeYoung, IE R. Minogue, NRR Regional Administrators l
1 l
l 8207300203 820609 PDR FOIA DEVINE82-206 PDR
&c./db WC $
.