799 RooSEVEtT ROAD CLEN E LLYN,lLLINol5 60m April 24, 1981 NOTE TO:
A. B. Davis, Deputy Director FROM:
R. F. Heishman, Acting Director, Division of Resident and Project Inspection
SUBJECT:
INDEPENDENT VERIFICATIONS TO SUPPORT ZIMMER IhTESTIGATION On a memo routing slip dated April 21, you requested cot:=ents regarding a draft memorandum of the same subject.
I believe this memorandum is premature and should be delayed until the licensee's program for confirming the adequacy of construction is finah. zed.
I do not believe it is prudent to finalize our efforts on these matters untf1 af ter the licensee's program has been defined and is well -
on its way to be implemented.
In addition, I have some concerns about the utilization of criteris addressing 95% reliability with a 95% confidence factor.
This can become extremely complicated and subject to controversy as pointed out in our experience at Marble Hill; therefore, I am not sure that it is necessary to express our verification program in those terms.
I would rather support a program which, in fact, provides us the necessary confidence in this matter.
- s a matter of principle, I believe Mr. Norelius should be added to the addressee list in that his people will undoubtedly have to perform a large majori'ty of the work described in this memorandam.
I would be happy to discuss;this matter with you further, if you so desire.
\\
a R. F. Heishman, Acting Director Division of Resident and Project Inspection s
s w
DEVINE82-206 PDR jg
~
ROUTING AND TPJSS!AITTAL SUP p
lattists Date Name, of5n sy nbol, room number, TO:
_ k.r&<
L;% c L
$A Co e g
p L
5 Note and Retum E
Fue
[Adion Par Conversation j#
For Clearance Approval Prepare Raphr - *
- h For Correction
{ As Requested See Me For Your Informatten Clrtutate SJgnature Investigste N Comment
}
}
l Justify i
Coordination ILDAARKS 64 hM g
> w p &=R=W MP 00 DecT tree DJs form es e RtcoRD et opprovsh, concurrences, disposals, tJsersaces, and sim6Lar actione Room No.-Bids.
F1 tow. prame, erg, ermbe( Ageacy/ Post)
C
- m..a.u u me. 7-7 3 rg _
g-
""-*=
.t
- 4. 6 dMq h
r~iw<pJ e D & W
.AM &aMnp+p~
ry x
' y 4 ~2iX u h W -
A & & $ a.ddur.x.a./ W&Al h M' AM/m
'Q_ -, ns 9 n
c.
)
l 1
1 h.M Q
g
}IEMORANDUM TOR:
J r
e t A
R. F. Heishman, Acting Director, Division of Resident and Project Inspection ROM:
A. Bert Davi*, Deputy Director INDEPENDENT VERIFICATIONS TO SUPPORT ZIMMER INVESTIGATION
SUBJECT:
This memorandum establishes the independent verifications program which Rill will perform to support the Zimmer Investigation.
If future investigation findings indicate that the information given below should be modified, please discuss it with me.
This program is as follows:
The licensee is committed to visually inspect structural beam welds 1.
performed by Bristol Corporation.
RIII inspectors will visually inspect a sample of the welds.
Sample size will be sufficient to satisfy the criteria of 95% reliability with a 95% confidence factor.
This independent verification N
will address the question of inadequate structural beam velds.
To provide confidence that field and shop welds are satisfactory a sample 2.
vill be verified. ' Sample size vill be sufficient to satisfy the criteria
~
of 95% reliability with a 95% confiden,ce factor based on the total of field Verification vill include making an " onion skin" tracing of plus shop welds.
each veld's radiograph, comparing this tracing with the installed weld, assuring radiograph quality is satisfactory, and assuring all weld records This independent verification vill address the questions are satisfactory.
of whether veld quality was adversely af fected by site activities such as It will also partially address whether veld records.are reliable.
drinking.
b-i
i l
'e' t
_ 2_
a t
3.
Equipment from the R1 NDE Van will be reviewed to determine if it can i
/
reliably identify material composition.
If it can, the equipoent will be
/
used to independently verify material traceability findings made by the j
f;t/ 'l licensee in structural steel and piping materials and welds.
You will
/
'/
define the scope of this verification effort and submit it to the
- /
Director's Office for concurrence.
l
/
4.
L'e will rely on the licensee to determine proper fit up of socket wel.ds.
RIII inspectors will directly observe in the field a sample of the licensee's fit up determinations.
You will define the scope of these field verifications and submit it to the Director's Office for concurrence.
5.
The above verifications vill not be performed until after the licensee has
)
completed his work and verifications in these areas.
This will assure we
,)
e l
are looking at the licensee's final product.
I If you have any questions, I am available to discuss them.