Responds to FOIA Request for Documents Re IE Insp Rept 50-358/81-13.Forwards Documents Listed in Apps a & B.App B Documents Completely & Partially Withheld (Ref FOIA Exemption 7 & 10CFR9.5(a)(7))
ML20058E546
Person / Time
Site: Zimmer
Issue date: 06/09/1982
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Devine T, Rosenthal J
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20058A387 List: ... further results
References
FOIA-82-206 NUDOCS 8207300062
Download: ML20058E546 (7)


See also: IR 05000358/1981013

Text

20&olb

'

'

. e

v s.

UNITED STATES

o

l'

'

NUCLEAR REGULATORY COMMISSION

.
  • j

WASHINGTON, D. C. 20555

o, ~

a

%,

/

June 9, 1982

Docket No. 50-358

.

Mr. Tom Devine

.

-

Mr. Jay Rosenthal

Government Accountability Project

Institute for Policy Studies

1901 Que Street, N.W.

IN RESPONSE REFER

Washington, DC 20009

TO F01A-82-206

Dear Messrs. Devine and Rosenthal:

,

This is in partial response to four letter dated April 20, 1982, in

which you requested, pursuant to the Freedom of Information Act, documents

concerning IE Report No. 50-358/81-13.

h

The documents listed on Appendix A have beeg placed in the NRC Public

Document Room, 1717 H Street, N.W., Washington, DC.

You may obtain

access to these documents by presenting a copy of this letter or by

requesting folder F01 A-82-206 in your name.

The documents listed on Appendix B are investigatory records compiled

for law enforcement purposes.

Document 1 and portions of document 2 of

Appendix B are being withheld from public disclosure pursuant to exemption

(7)(A) of the Freedom of Information Act (5 U.S.C. 552(b)(7)(A)) and 10 CFR 9.5(a)(7)(i) of the Commission's regulations because disclosure of

the information would interfere with an ongoing enforcement proceeding.

Portions of documents 3 through 9 and additional portions of document 2

are being withheld pursuant to exemption (7)(C) of the F0IA (5 U.S.C.

552(b)(7)(C)) and 10 CFR 9.5(a)(7)(iii) of the Commission's regulations

because disclosure of the information would constitute an unwarranted

,

invasion of personal privacy.

Portions of documents 10 through 14 and

additional portions of documents 2, 3, 4, 5, 6, 8 and 9 are being withheld

pursuant to exemption (7)(D) of the F0IA (5 U.S.C. 552(b)(7)(D)) and 10 CFR 9.5(a)(7)(iv) of the Commission's regulations because disclosure of

the information would reveal the identity of a confidential source.

The

non-exempt portions of documents 2 through 14 are being placed in the

Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been

determined that the information withheld is exempt from production or

disclosure, and that its production or disclosure is contrary to the

public interest.

The person responsible for the denial of document 7 of

Appendix B is the undersigned. The persons responsible for the denial

of documents 1 through 6 and 8 through 14 of Appendix B are the under-

signed and Mr. James Keppler, Regional Administrator, Region III.

.

8207300062 820609

PDR FOIA

DEVINE82-206

PDR

]

. . - *

.

,

Mr. Tom Devine

Mr. Jay Rosenthal

-2-

.

These denials may be appealed to the Commission's Executive Director for

Operations within 30 days from the receipt of this letter.

As provided

in 10 CFR 9.11, any such appeal must be in writing, addressed to the

Executive Director for Operations, U.S. Nuclear Regulatory Commission,

Washington, DC 20555, and should clearly state on the envelope and in

the letter that it is an " Appeal from an Initial F0IA Decision."

The search for and review of additional documents subject to your request

has not yet been completed.

As soon as the search and review are complete,

we will advise you of our disclosure determination.

Sincerely,

/

l

. F lton, Director

ivision of Rules and Records

Office of Administration

Enclosures: As stated

.

I

i

4

.

l

l

1

Re: F0!A-82-206

,

.

Appendix A

1.

10/30/81

C. E. Norelius et. al. from, James G. Kepp'ler re:

Zimmer - Reactor Construction Inspection Program

Evaluation

2.

1/12/81

Memo for Victor Stello, Jr. , from James G. Keppler

re: Zimmer - Government Accountability Project Request

for Investigation by Merit Systems Protection Board

Concerning NRC's Handling of Applegate Allegations

3.

2/9/81

Memo for C. E. Norelius et. al. from A. Bert Davis

re: Zimmer Investigation

4.

2/23/81

Memo for File from A. Bert Davis re: Telephone Call

from Tom Applegate dated 2/19/81

5.

2/17/81

Memo for Paul Barrett et. al. from A. Bert Davis re:

Investigation at Zimmer Facility

6.

2/25/81

Memo for File from A. Bert Davis re: Telecon with

Tom Applegate dated 2/23/81

7.

3/5/81

Memo for File from A. Bert Davis re: Telephone Converation

with Ira Rosen, 60 Minutes

8.

3/9/81

Memo for R. F. Heishman from A. Bert Davis re: Comments

on Applegate Allegation

9.

3/17/81

Memo for Victor Stello, Jr. , from James G. Keppler re:

Investigation of Applegate Allegations Related to Zimmer

10.

4/14/81

Note for C. E. Norelius from James G. Keppler re: Recent

Meeting with Cincinnati Gas & Electric Company - Performance

of Paul Barrett

11.

4/22/81

Memo for Region III Files from G. Fiorelli re: Contact

with the Division Administrator for Highways in the

State of Ohio

12,

4/22/81

Memo for R. F. Warnick from F. Maura re: Results of Zimmer

Investigations

13.

4/24/81

Note to A. B. Davis from R. F. Heishman re: Independent

Verifications to Support Zimmer Investigation

14.

4/29/81

Memo for James H. Sniezek from James G. Keppler re:

Recommendation for Notification of Licensing Board -

William H. Zimmer Nuclear Power Plant

.

-

Re:

F01A-82-206

,

.

Appendix A

30.

8/28/81

Memo for P. A. Barrett et. al. from A. Bert Davis re:

Extended Independent Verification Program at Zimmer

31.

9/3/81

Memo for James G. Keppler from James E. Foster re: OIA

Report " Adequacy of IE Investigation 50-358/80-09 at

the William H. Zimmer Nuclear Power Station"

32.

9/4/81

Memo for R. F. Warnick from A. Bert Davis re: Zimmer

Investigation, WELD CY-516

33.

9/8/81

Memo for James G. Keppler from G. A. Phillip re: Comments

on OIA Report on the Adequacy of IE Investigation Report

No. 50-358/80-09 at the William H. Zimmer Nuclear Power

Station

34.

9/10/81

Memo for Marthe H. Singh from James G. Keppler re: Zimmer

Report

35.

Undated

Memo for Dudley Thompson from James G. Keppler re: Region

III Review of OIA Special Inquiry Concerning Adequacy of

IE Investigation 50-358/80-09 at William H. Zimmer Nuclear

Power Station

36.

10/1

Routing and Transmittal Slip to Vic Stello from Bert Davis

re: Sargent and Lundy Audit at Zimmer

37.

11/10/81 Memo for File from A. Bert Davis re: Zimmer Meeting with

Danielson, Barrett, Streeter and Warnick

38.

12/11/81

Note for Victor Stello, Jr., from James G. Keppler re:

Briefing of Commissioner Gilinsky by Cincinnati Gas &

Electric Company Re Quality Assurance

39.

1/5/82

Memo for R. L. Spessard from James G. Keppler re: Zimmer -

Management Attitudes

40.

2/2/82

Memo for James B. McCarten from Robert F. Warnick re:

Zimmer Documents and Investigation Leads

41.

2/8/82

Memo for Reactor Projects Section 2B from D. H. Hunter re:

Inspection Procedure Numbers for the Zimmer Project

42.

2/23/82

Memo for A. Schnebelen from Robert F. Warnick re: Forwarding

of Zimmer Investigation Records

43.

2/25/82

Memo for Robert F. Warnick from J. B. McCarten re: Zimmer

Document and Investigation Leads

.

.

Re:

F01A-82-206

,

Appendix A

15.

5/6/81

Memo for R. F. Heishman et. al. from James G. Keppler

re: Evaluation of Problems Identified, Zimmer Investigation

16.

5/12/81

Memo for R. F. Heishman et. al. from A. Bert Davis re:

Independent Verifications at Zimmer

17.

5/14/81

Memo for Zimmer File from A. Bert Davis re: Discussion

with Tom Daniels, SRI, Zimmer

18.

5/28/81

Memo for R. F. Heishman et. al. from A. Bert Davis re:

GAP Letter Requesting Work Stoppage at Zimmer

19.

6/12/81

Memo for R. C. DeYoung from James G. Keppler re: Status

of Zimmer Investigation

20.

6/23/81

Memo for R. J. Strasma from A. Bert Davis re: Review of

Zimmer Report

21.

7/6/81

Note to Bob from Pat Gwynn re: Allegations Concerning

Traceability of Materials in the Diesel Generator Rooms

at Zimmer NPS

22.

7/8/81

Memo for File from James G. Keppler re: Telephone Call

from Thomas Applegate

23.

7/14/81

Memo for J. G. Keppler et. al. from J. E. Foster re:

Status of Zimmer Investigation Report, Assignment of

Tasks and Recommendations

24.

7/16/81

Meno for A. B. Davis from G. Fiorelli re: Review of

Zimmer Inspection History

25,

7/24/81

Memo for C. E. Norelius et. al. from A. Bert Davis re:

Meeting to Discuss Zimmer Independent Verifications,

7/14/81

26.

7/28/81

Memo for Barrett et. al. from James E. Foster re:

Position on " Unapproved Vendors"

27.

8/18/81

Memo for Thomas Daniels from J. B. McCarten re: Copies

of Nonconformance Reports

28.

8/20/81

Memo for James H. Sniezek from A. Bert Davis re: Limited

Test Program at Zimmer

29.

8/21/81

Memo for James H. Sniezek from A. Bert Davis re: Limited

Test Program at Zimmer, Revision

.

Re:

F01A-82-206

.,

.

.

Appendix A

44.

3/9/82

Memo for Region III Files from D. R. Hunter re: Zimmer

ACRS Sub-Committee Meeting Held on 2/18/82 in Cincinnati,

Ohio

,

45

3/15/82

Memo for Dave Gamble from Robert F. Warnick re: Records

from 1981 Zimmer Investigation

46.

3/22/82

Memo for James J. Cummings from James G. Keppler re:

Coordination of Zimmer Report

47.

3/31/82

Memo for J. F. Streeter from D. R. Hunter re: Handling of

NRs at Zimmer by the SRI /RI

48.

4/8/82

Memo for Dorwin R. Hunter from James E. Foster re: Material

Procurement at the Zimmer Site

49.

1/22/82

Note to R. C. DeYoung from James G. Keppler re: Zimmer

Briefing Paper

50.

10/27/81

Memo for E. B. Blackwood from James H. Sniezek re: Reactor

Construction Inspection Program Evaluation

51 .

11/9/81

Memo for J. G. Keppler from James H. Sniezek re: Reactor

Construction Inspection Program Evaluation

52. 8/15/81

Draft Report re: William H. Zimmer Nuclear Power Station

with comments by Barrett

53.

8/15/81

Draft Report re: William H. Zimmer Nuclear Power Station

with comments by Foster

.

Re:

F0IA-82-206

.

,

Appendix B

1.

9/14/81

Memo to Region III Files from C. H. Weil re: Anonymous

Allegations Received by Region I concerning LACBWR

(50-409); Perry (50-440; 50-441); Zimmer (50-358)

w/ attachment

2.

4/30/81

Memo for J. Streeter from E. C. Gilbert re: Receipt

of Additional Allegations Concerning the William H.

Zimmer Nuclear Power Station

3,

9/8/81

Memo for J. B. McCarten from J. F. Streeter re: 1978

Electrical Allegations - Zimmer

4.

2/3/81

Memo for Files from G. A. Phillip re: Zimmer - Allegations

Re: Lowering of Welding Requirements

5.

10/6/81

Memo for Files from J. F. Streeter re: Telephone Call

with Tom Applegate

6.

1/16/81

Memo for Files from C. E. Norelius re: Allegation

regarding the Zimmer Facility

7.

4/20/82

Note to W. Dircks from J. Keppler re: Transmittal of

material to the Udall Committee

8.

11/23/81

Memo to J. G. Keppler from J. F. Streeter w/ attachment

re: Investigator / Inspector Signatures on Final Zimmer

Investigation Report 50-358/81-13 (Information deleted

from Exhibits 1, 2, 3, 5, 6, 21, 22, 23, 25, 26, 32, 36,

37,38,39,40,41,42,44,45)

9.

Undated

Exhibits 1 through 81 (Information deleted from exhibits

1, 35, 36, 38, 39, 54, 55, 56, 58, 60, 67, 71, 72, 73,

74, 75, 77, 79, 80.

Exhibit 50 does not exist)

10.

4/2/82

Memo for R. F. Warnick from D. R. Hunter re: Allegations

concerning Powell valves at the Zimmer Nuclear Plant

11.

11/10/81

Memo for R. F. Warnick from P. A. Barrett re: Allegations

received 11/4/81, concerning activities at Zimmer

12.

8/4/81

Memo for J. F. Streeter, et. al. from J. E. Foster re:

Content of Zimmer Investigation Report

13.

5/21/81

Memo for Files from J. Streeter re: Allegations of

Improper Welding Procedures, Voiding of NCR

14.

Undated

Computer printout regarding IE Report 50-358/81-13

.