ML20058E618
| ML20058E618 | |
| Person / Time | |
|---|---|
| Site: | Zimmer |
| Issue date: | 05/14/1981 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20058A387 | List:
|
| References | |
| FOIA-82-206 NUDOCS 8207300128 | |
| Download: ML20058E618 (1) | |
Text
-
/
'o UNITED STATES g
4, s.
E NUCLEAR REGULATORY COMMISSION o
&2-
.. E REGION lla
['
I o,
799 ROOSEVELT ROAD g~..%,-
CLEN ELtVN,ILLINols 60137 Hay 14, 1981 MEMORANDUM FOR:
Zimmer File (Deputy Director's Office)
FROM:
A. Bert Davis, Deputy Director
SUBJECT:
DISCUSSION WITH TOM DANIELS, SRI, ZIMMER During the Resident Inspector's Social Hour last night (5/13/81) I had a lengthy discussion with Tom concerning Zimmer.
Tom stated that his position with respect to Zimmer is that it should be shut down until all their problems are corrected.
He had previously taken this position at my visit to Zimmer a couple of months ago.
As near as I could tell Tom's reasons were primarily based on the fact that personnel at the site who have made past errors and involved in past problems are in the most part still there.
Therefore, continued errors could occur.
I discussed with Tom the Innediate Action Letter and attempted to get him to be specific as to whether or not future work is adequately controlled by the IAL.
As I attempted to become specific with respect to his concerns, it anneared that his position was primarily based on a gut feel and a mistrust of the Kaiser and CG&E organization and people.
The only specific he could come up with with respect to whether or not future work not being properly controlled was a preliminary finding that a number of noncomformance reports were being piled up rather than being promptly reviewed.
He based this on a statement made to him by a Mr. Haas.
When he pursued it with Mr. Schwiers, he was told that the noncomformance reports were being reviewed and that the ones in question were planned to be reviewed that night by i
Mr. Schwiers.
Tom indicated that before he made this a finding, he wanted to pursue it further.
I asked him to do that and provide the information to me.
Based on Tom's feelin:;, I believe it is necessary to oursue it to get details, i
so that we can determine 3hether or not there is a basis for shutting down the project.
Ad A. Bert Davis Denuty Director l
DEVINE82-206 PDR l
-