Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20217G3081998-03-25025 March 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $88,000.Violation Noted:Licensee Failed to Correctly Translate Design Change Into Procedure ML20135E9241985-09-0505 September 1985 Notice of Violation from Insp on 850709-0812 ML20133N8981985-07-29029 July 1985 Notice of Violation from Insp on 850624-28 IR 05000611/20070081985-07-19019 July 1985 Notice of Violation from Insp on 850611-0708 IR 05000409/20050131985-05-31031 May 1985 Notice of Violation from Insp on 850409-0513 ML20127K9921985-05-22022 May 1985 Notice of Violation from Insp on 850225-0301.Violations Noted:Inadequate Fire Protection Features for Sys Needed to Maintain Hot Shutdown Conditions & Procedural Errors & Late Implementation of Alternate Shutdown Procedure ML20058H5881982-06-11011 June 1982 Notice of Violation from Insp on 820411-0514 ML20054K2801982-04-28028 April 1982 Notice of Violation from Insp on 820329-0402 ML20054K2371982-04-0606 April 1982 Notice of Violation from Insp on 820309-12 1998-03-25
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000335/19990111999-10-0808 October 1999 Partially Deleted Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-08 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-023, on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems1999-06-0808 June 1999 PNO-II-99-023:on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems ML20217G3081998-03-25025 March 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $88,000.Violation Noted:Licensee Failed to Correctly Translate Design Change Into Procedure ML20202D8761997-02-12012 February 1997 Investigation Rept 2-96-042 on 961106.No Noncompliance Noted.Major Areas Investigated:Allegation of Falsification & Backdating of Emergency Preparedness Document.Partially Deleted IR 05000335/19960221996-11-14014 November 1996 Insp Repts 50-335/96-22 & 50-389/96-22 on 961114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Configuration Mgt & 10CFR50.59 Programs ML20134J2391996-07-31031 July 1996 Investigation Rept 2-95-008 Re Alleged Discrimination Against Instrumentation & Control Technician for Reporting Safety Concerns ML20134N0901996-01-31031 January 1996 Partially Deleted Investigation Rept 2-94-018.Allegation Not Substantiated IR 05000335/19940021994-03-11011 March 1994 Partially Withheld Insp Repts 50-335/94-02 & 50-389/94-02 on 940207-11.No Violations Identified.Major Areas Inspected:Mgt Support,Physical Security Program for Power Reactors,Audits & Alarm Stations & Communications PNO-II-93-001, on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified1993-01-13013 January 1993 PNO-II-93-001:on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified IR 05000335/19920231992-12-14014 December 1992 Partially Withheld Insp Repts 50-335/92-23 & 50-389/92-23 on 921130-1204 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Vital Area Barriers & Alarms, Lighting,Assessment & Testing,Maint & Compensatory Measures IR 05000335/19910131991-07-11011 July 1991 Insp Repts 50-335/91-13 & 50-389/91-13 on 910610-14.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Nuclear Power Reactors,Mgt,Plans, Audits,Barriers,Detection & Assessment Aids IR 05000335/19910041991-04-15015 April 1991 Insp Repts 50-335/91-04 & 50-389/91-04 on 910123-0318.No Violations Noted.Major Areas Inspected:Plant Operations Review,Maint & Surveillance Observations,Review of Special Repts & Review of Nonroutine Events IR 05000335/19900251990-11-0707 November 1990 Partially Withheld Insp Repts 50-335/90-25 & 50-389/90-25 on 901009-12.Noncited Violation Noted.Major Areas Inspected: Records & Repts,Alarm Stations,Communication & Training IR 05000335/19900261990-10-31031 October 1990 Insp Repts 50-335/90-26 & 50-389/90-26 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Isi,Including Review of Unit 1 Plan for Outage & Associated ISI Administration Procedures PNO-II-90-048, on 900820,shutdown of Unit 2 in Excess of 48 H.Caused by High Vibration of Main Generator Exciter Bearing.Licensee Expanding Scope of Insp & Root Cause Analysis.Unit Scheduled to Begin Refueling Outage on 9009151990-08-22022 August 1990 PNO-II-90-048:on 900820,shutdown of Unit 2 in Excess of 48 H.Caused by High Vibration of Main Generator Exciter Bearing.Licensee Expanding Scope of Insp & Root Cause Analysis.Unit Scheduled to Begin Refueling Outage on 900915 PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies1989-09-21021 September 1989 PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies IR 05000335/19890111989-05-15015 May 1989 Partially Withheld Safeguards Insp Repts 50-335/89-11 & 50-389/89-11 on 890327-31 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plan Audits & Protected & Vital Area Barriers IR 05000335/19880231988-11-0202 November 1988 Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness & Security Organization.Details Withheld (Ref 10CFR2.790(d) & 73.21) ML20151Y6841988-08-16016 August 1988 Partially Withheld Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Circumstances Surrounding Failure to Control Access to Vital Area IR 05000335/19880111988-06-14014 June 1988 Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted.Major Areas Inspected:Special Nuclear Matl Control & Accounting IR 05000335/19880121988-06-0909 June 1988 Partially Withheld Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Security Sys Power Supply & Communications PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations1987-10-13013 October 1987 PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations PNO-II-87-066, on 871008,licensee Calculated Leakage Above Required Tech Spec Limits.Cause Could Not Be Identified. Reactor Shut Down Based on Leakage & Results of Containment Insp1987-10-0606 October 1987 PNO-II-87-066:on 871008,licensee Calculated Leakage Above Required Tech Spec Limits.Cause Could Not Be Identified. Reactor Shut Down Based on Leakage & Results of Containment Insp ML20235J2471987-09-24024 September 1987 Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Major Areas Inspected: Evaluation of Annual Emergency Preparedness Exercise. Exercise Scope & Objectives Encl ML20215K8951987-06-17017 June 1987 Exam Rept 50-335/OL-87-01 on 870420-22.Exam Results:Six Reactor Operators & Two Senior Reactor Operators Passed Oral & Written Exams.Master Exams Encl IR 05000335/19870021987-03-20020 March 1987 Partially Withheld Insp Repts 50-335/87-02 & 50-389/87-02 on 870217-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Area Inspected:Intrusion Detection Sys Being Employed as Detection Aid in Canal Opening PNO-II-87-019, Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding Areas1987-03-18018 March 1987 PNO-II-87-019:Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding Areas IR 05000335/19870011987-02-26026 February 1987 Insp Repts 50-335/87-01 & 50-389/87-01 on 870113-0207.No Violations or Deviations Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices,Station & Corporate Mgt Practices & Overall Plant Operations ML20211H2511987-02-0606 February 1987 Exam Rept 50-335/OL-86-02 on 861117.Exam Results:All Candidates Passed Oral & Written Exams & One Senior Reactor Operator Passed Written Reexam IR 05000335/19860271987-01-26026 January 1987 Insp Repts 50-335/86-27 & 50-389/86-26 on 861216-870112.No Violations or Deviations Noted.Major Areas Inspected:Onsite Activities for Tech Spec Compliance,Operator Performance, Site Security Procedures & QA Practices ML20207J1891986-12-17017 December 1986 Insp Repts 50-335/86-25 & 50-389/86-24 on 861117-21.No Violations or Deviations Noted.Major Areas Inspected:Maint & Mod Welding,Inservice Testing Program for ASME Class 1,2 & 3 Pumps & Valves & Inspector Followup Items IR 05000335/19860131986-12-0101 December 1986 SALP Repts 50-335/86-13 & 50-389/86-12 for Nov 1984 - Apr 1986 PNO-II-86-066, on 860920,leaking Relief Valve on Storage Tube on Hydrogen Trailer Discovered.Other Tubes Isolated from Leak,Area Roped Off & Smoking Prohibited.Event Terminated on 8609211986-09-22022 September 1986 PNO-II-86-066:on 860920,leaking Relief Valve on Storage Tube on Hydrogen Trailer Discovered.Other Tubes Isolated from Leak,Area Roped Off & Smoking Prohibited.Event Terminated on 860921 ML20212P2101986-08-26026 August 1986 Partially Withheld Physical Security Insp Repts 50-335/86-19 & 50-389/86-18 on 860804-08 (Ref 10CFR2.790 & 73.21). Violation Noted:Vehicle Control IR 05000335/19860111986-08-0707 August 1986 Partially Withheld Insp Repts 50-335/86-11,50-389/86-10, 50-335/86-17 & 50-389/86-16 on 860414-0625 (Ref 10CFR2.790 & 73.21).Violation Noted:Failure to Provide Access Control to Vital Areas ML20204H7291986-08-0404 August 1986 EN-86-059:on 860807,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $25,000 Will Be Issued to Licensee Based on Failure to Provide Adequate Barriers to Equipment & Inadequate Security Insps ML20205B1211986-07-25025 July 1986 Exam Rept 50-335/OL-86-01 on 860610-12.Exam Results:Three of Four Senior Reactor Operator Candidates Passed Written Exam & All Four Passed Oral Exam & One Reactor Operator Candidate Failed Oral & Written Exam.Exam Encl PNO-II-86-040, on 860606,util Took Facility Out of Svc to Begin Plugging 17 Degraded Steam Generator Tubes.Unit Will Be Shut Down Approx 2 Wks.Tube Degradation Discovered on 860523 in Eddy Current Data Taken During Oct-Dec 19851986-06-0909 June 1986 PNO-II-86-040:on 860606,util Took Facility Out of Svc to Begin Plugging 17 Degraded Steam Generator Tubes.Unit Will Be Shut Down Approx 2 Wks.Tube Degradation Discovered on 860523 in Eddy Current Data Taken During Oct-Dec 1985 PNO-II-86-032, on 860428,iron Workers Employed by Util Contractor Walked Off Job & Set Up Picket Lines at All Four Entrances to Facility.Union Workers Refusing to Cross Picket Lines.Security Forces & Senior Reactor Operators on Job1986-04-28028 April 1986 PNO-II-86-032:on 860428,iron Workers Employed by Util Contractor Walked Off Job & Set Up Picket Lines at All Four Entrances to Facility.Union Workers Refusing to Cross Picket Lines.Security Forces & Senior Reactor Operators on Job ML20140B6311986-03-11011 March 1986 Exam Rept 50-335/OL-85-02 on 851216-20.Exam Results:All 16 Candidates Administered Oral Exams Passed & 14 of 15 Candidates Administered Written Exams Passed IR 05000335/19850351986-01-17017 January 1986 Physical Security Insp Repts 50-335/85-35 & 50-389/85-35 on 851216-20.No Violations Noted.Major Areas Inspected:Mgt effectiveness-security Program & Security Organization. Details Withheld (Ref 10CFR2.790(d) & 73.21) PNO-II-86-004, on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm1986-01-0909 January 1986 PNO-II-86-004:on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm PNO-II-85-110A, on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path1985-11-22022 November 1985 PNO-II-85-110A:on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path PNO-II-85-110, on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 8511181985-11-19019 November 1985 PNO-II-85-110:on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 851118 PNO-II-85-105A, on 851109,minor Damage to Regular Lifting Rig Identified Following Lifting of Core Internals Upper Guide Structure Free of Reactor Vessel.Unusual Event Declared on 851106 Terminated1985-11-12012 November 1985 PNO-II-85-105A:on 851109,minor Damage to Regular Lifting Rig Identified Following Lifting of Core Internals Upper Guide Structure Free of Reactor Vessel.Unusual Event Declared on 851106 Terminated PNO-II-85-105, on 851106,while Removing Core Internals Upper Guide Structure,One Lifting Rig Attachment Failed.Refueling Operations Halted W/Structure in Apparently Stable Position. NSSS Vendor Being Contacted1985-11-0606 November 1985 PNO-II-85-105:on 851106,while Removing Core Internals Upper Guide Structure,One Lifting Rig Attachment Failed.Refueling Operations Halted W/Structure in Apparently Stable Position. NSSS Vendor Being Contacted IR 05000335/19850211985-10-0808 October 1985 Insp Repts 50-335/85-21 & 50-389/85-21 on 850813-0923.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance,Operator Performance,Qa Practices & Site Security Procedures IR 05000335/19850241985-10-0101 October 1985 Physical Security Insp Repts 50-335/85-24 & 50-389/85-24 on 850916-20.No Violations Noted.Major Areas Inspected:Mgt Effectiveness & Security Program.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000387/19850291985-09-23023 September 1985 Meeting Repts 50-387/85-29 & 50-388/85-24 on 850828 Re Rescheduling of Senior Reactor Operator Licensing Exam. Region Agreed to Administer One Instructor Certification & One Senior Operator Exam on 851120 & 21,respectively 1999-09-15
[Table view] |