ML20054E359

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Failure of Power Strut Model PS-809 Welded Support Assemblies,Initially Reported 820504. Investigation Underway.Next Rept Will Be Provided by 820723
ML20054E359
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/03/1982
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, DR-50, RBG-12-749, NUDOCS 8206110124
Download: ML20054E359 (1)


Text

_

^

GULF STATES UTILITIES COMPANY POST oFFICEBOX 2951'

  • BEAOMONT, TEXAS 77704 AREA C O D E 713 838-6631 1

June 3, 1982 RBG-12,749

' File Nos. G9.5, C9.25.1.1

'1r. John T. Collins, Regional Administrator I u. S. Nucinar Regulatory Commission -

g!h Region IV, Office of Inspection and Enforcement 611'Ryan Plaza Drive,_ Suite 1000' , ,] h Arlington, Texas 76011 i ' I pg 7 l

Dear Mr. Collins:

y y River Bend Station Unit 1 Docket No. 50-458 '--

Interim Report /DR-50 On May 4, 1982, Gulf States Utilities Company (GSU) notified your office of a condition potentially reportable under 10CFR50.55(e) l concerning the failure of Power Strut model PS-809 welded support assemblics. GSU has not completed its investigation at this time. -An interim or final status report will be provided by July 23, 1982.

Sincerely, j

i J. E. Booker

! - Manager-Engineering & Licensing River. Bend Nuclear Group

/kt-cc: Director of Inspection' & Enforcement -

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 i

5$

8206110124 820603

. PLa ADOCK 05000450 l S PDR l