Interim Deficiency Rept DR-47 Re Arc Strikes Found on Graver shop-fabricated Drywell Penetrations,Initially Reported 820430.Investigation Not Completed.Next Rept Will Be Submitted by 820723
ML20053F040
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/02/1982
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, RBG-12-751, NUDOCS 8206100333
Download: ML20053F040 (1)


Text

GULF STATES UTILITIES COMPANY

.g POST OFFICE Box 2951 .

B E /* U M o N T . TEXAS 77704 A R f' A CODE 713 938 6631 June 2, 1982 RBG- 12,751 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Adminstrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcement s 611 Ryan Plaza Drive, Suite 1000  ;'@;l

(- j%

Arlington, Texas 76011 l J , ~~

i- ~ ~ "'~ ~ .h ,j

Dear Mr. Collins:

j UUN 7192 l River Bend Station Unit 1 Docket No. 50-458 _

Interim Report /DR-47 On April 30, 1982, Gulf States Utilities Company (GSL) notified your office of a condition potentially reportable under 10CFR50.55(e) concerning arc strikes found on Graver shop-fabricated drywell penetrations. GSU has not completed its investigation at this time.

An interim or final status report will be provided by July 23, 1982.

Sin . rely, l M j

hJ.E.Bo r Manager-Engineering & Licensing River Bend Nuclear Group JE/ HIE /kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l