ML20050E358

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Documentation of A-500 Steel.Addl Program Will Be Required to Completely Address Problem. Completion of Program & Review Estimated to Be 820604. Summary of Significant Findings Will Then Be Submitted
ML20050E358
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/05/1982
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
RBG-12-392, NUDOCS 8204130243
Download: ML20050E358 (1)


Text

GULF STATES UTILITIES C'OMPANY es POST OFFICE B o x 2 9 51

  • OEAUMoNT, TEXAS 777o4 AREA CODE 713 838-6631 April 5,1982 RBG- 12,392 File Nos. G9.5, G9.25.1.1

& k Mr. John T. Collins, Regional Administrator g U. S. Nuclear Regulatory Commission p Regior IV, Office of Inspection and Enforcement ,

611 Ryan Plaza Drive, Suite 1000 'EECEIVEQ ,

Arlington, Texas 76011 --

ApgygI982 ,,

Dear Mr. Collins:

/

River Bend Station Unit 1 //

g Docket No. 50-458 , 4 In Gulf States Utilities (GSU) March 5, 1982 letter on the potentially reportable problem with the documentation of A-500 Steel, CSU committed to provide a Status Report by April 5, 1982. GSU has determined that an additioaal program will be required to completely address this problem. Details of steps to be taken are being established. At this time, no deficiencies in installed material related to the documentation have been identified. The program will be structured to reconfirm the- adequacy of suspect A-500 steel. Upon conclusion of the program and GSU's review which is currently estimated to be June 4, 1982, GSU will notify Region IV and provide a summary of any significant findings.

Very truly yours, J. E. Booker Manager-Engineering & Licensing River Bend Nuclear Group JEB/ E/kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 sR 7 so 8204130243 820405 PDRADOCK05000g S