ML20045H533

From kanterella
Jump to navigation Jump to search
Requests Summary Assessment of NRC Present Position on Licensability Status of Nuplex 80+ Design
ML20045H533
Person / Time
Site: 05200002
Issue date: 06/24/1993
From: Brinkman C
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML20045H529 List:
References
LD-93-099, LD-93-99, NUDOCS 9307200339
Download: ML20045H533 (1)


Text

. - - - _ - _ _ _ _ - - _ _ _ _ _ _ . _ _ _ _ _ _ - . . _ _ - _ _ . _ . _ _ _ _ - _ _ _

M. Pp ASEA BROWN BOVERI June 24, 1993 LD-93-099 l

Mr. Dennis M. Crutchfield l Associate Director for Advanced -l Reactors and License Renewal l Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission-Washington, DC 20555 i

Subject:

HUPLEX 80+* Review Status s.

Dear Mr. Crutchfield:

ABB-CE has been actively engaged with the NRC for several years in the review of the NUPLEX 80+ Advanced Control Room as a major subset of the System 80+5 ALWR Design Certification Application.. ,

We recognize that the NRC's final assessment of NUPLEX 80+ will be contained in the Final Safety Evaluation Report (FSER) for System 80+, which is currently scheduled for public release in February 1994 (per SECY-93-097). However, it would be very helpful. to us to -

receive at this time a-summary assessment of the NRC's present position on the licensability status of~the NUPLEX 80+ design.

Thank you for your attention to this matter.

-Very truly yours, Yhuev-----

C. B.-Brinkman-Acting Director I

Nuclear-Systems Licensing

- / Iw I

cc: B. .Boger (NRC) .

W. Borchardt (NRC)

T. Wambach-(NRC) 9307200339 930713 . I PDR ADOCK 05200002 A PDR-ABB Combustion Engineering Nuclear Power 1 ComMton Engeee"ng inc 1000 Praect H4 Road Telephone (20316851911 Pow Omce Ben 500 Fas (203) 285 9512 W naso < Connecicut 06095 0500 Teen 99297 COMBEN WSOR

,