Interim Deficiency Rept Re Improperly Installed Spring Nuts Not Fully Engaged in Cable Tray Support Channel,Initially Reported on 820211.Field QC Insp Techniques Being Evaluated. Addl Into Will Be Provided by 820412
ML20041G212
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/11/1982
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, RBG-12-26555E, NUDOCS 8203190399
Download: ML20041G212 (1)


Text

[

GULF STATES UTILITIES COMPANY post orrece sox 2951

  • H EAUMONT, TEXAB 7(Q A CODE A R E A 7 1 3 838 663 1 4 @

March 11,1982 /

fsl ) O RBG - 12,265 .? 7 . . , .

File flo. G9.5, G9.25.1.1l;* a tt

//

~

, lh Mr. John T. Collins, Regional Administrator .

U. S. fluclear Regulatory Commission y g2' - g //j ir:

Region IV, Office of Inspection and Enforcement  !

611 Ryan Plaza Drive, Suite 1000 'L- i  !

Arlington, TX 76011 I m I5122

Dear Mr. Collins:

_\.

RIVER BEfl0 STATI0fl - UtlIT 1 DOCKET fl0. 50-458 Gulf States Utilities Company (GSU) notified the Region IV I&E Office by telephone on February 11, 1982, of a concern potentially reportable under 10CFR50.55(e). The subject of the concern is im-properly installed spring nuts not being fully engaged in the cable tray support channel. This letter is the thirty-day status report committed by GSU in our February 11, 1982, telephone conversation.

GSU has not completed our analysis and reinspection of the suspect spring nuts. The inspection techniques applied by Field Quality Control is also being evaluated. Additional information will be provided by April 12, 1982.

Sincerely,

[ T

/

J. E. Booker Manager-Engineering & Licensing River Bend fluclear Group JEB/RJK/do cc: Director of Inspect ~.on & Enforcement i U. S. fluclear Regulatory Commission i Washington, D. C. 20555 l