ML20041F927

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Undersized Welds in 20 Recirculation Sys Pipe Whip Mounting Brackets,Initially Reported 820201.Required Info Will Be Provided within 30 Days
ML20041F927
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/03/1982
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, RBG-12-235, NUDOCS 8203170556
Download: ML20041F927 (1)


Text

-

d GULF STATES UTILITIES COMPANY POST OFFICE DOx 295i *HEAUMONT. TEXAS 77704 AREA CODC 713 618-3H43 March 3,1982 RBG-12,235 File Nos. G9.5, G9.25.1.1 D!

9

\ s Mr. John T. Collins, Regional Administrator q ' '-

U. S. Nuclear Regulatory Commission V, Region IV, Office of Inspection and Enforcement SECi}1E') \1

611 Ryan Plaza Drive, Suite 1000 62 Arlington, Texas 76011 -- l'IM I G 1982 nats n m g snw **

wW u ~ < ~

Dear Mr. Collins:

, Q River Bend Station-Unit 1 k Jocket No. 50-458 &~TTfm' On February 1,1982 Gulf States Utilities (GSU) informed Region IV of a concern under evaluation for reportability under 10CFR50.55(e) and GSU committed to provide a Status Report within 30 days. On March 2, 1982 GSU determined that this deficiency concerning undersized welds in 20 recirculation system pipe whip mounting brackets met the reporting requirements of 10CFR50.55(e). This determination was reported to your staff on Mar::h 3,1982. GSU will provide the information required by 10CFR50.55(e) paragraph (3) within 30 days.

Sincerely, b

/J. E. Booker Manager-Engineering & Licensing River Bend Nuclear Group JEB/LAE/kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8203170556 820303

\Q e**f h 'ks g% pr I

DR ADOCK 05000458 PDR t