Forwards Schedule for Providing Info to Close SER Confirmatory Issues,In Response to NRC 820125 Request
ML20040F251
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/01/1982
From: Wuller G
ILLINOIS POWER CO.
To: John Miller
Office of Nuclear Reactor Regulation
References
U-0411, U-411, NUDOCS 8202090010
Download: ML20040F251 (5)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

U

/LLIN01S POWER COMPANY r 79 gg9,_93,_L 500 SOUTH 27TH STREET, DECATUR. ILLINOIS 62525 February 1, 1982 v>

4 b 1

Mr. James R. Miller, Chief F.ECEi!'!ED Standardization & Special Projects Branch hO l Division of Licensing C FEB '31982 " $

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission { u u:la EG 7# ter" n t e n =sa Washington, D.C. 20555

% b

Dear Mr. Miller:

O

Reference:

Letter 1/25/82, J. R. Miller, NRC to G. E. Wuller, IP, subject: Draf t SER Confirmatory Irsues Clinton Power Station Unit 1 Docket No. 50-461 In response to the reference letter, attached is our schedule for providing information to close the Clinton SER confirmatory issues.

Sincerely,

/ JE G. E. Wuller Supervisor - Licensing Nuclear Station Engineering GEW/lt cc: J. H. Williams, NRC Clinton Project Manager H. H. Livermore, NRC Resident Inspector 0

&0 61 l

8202090010 820201 PDR ADOCK 05000461 E PDR

<Page 1 of 4' 1

~

2/1/82 ,..

Illinois' Power Schedule for Clinton SER Confirmatory Information Clinton SER Confirmatory. Schhdule/ Comments /

-Issue No. Subject References ,

(1) Emergency preparedness meteorological program

  • 9/30/81 FSAR Appendix 13.B l (2)' Inspection program around.the UHS' 2/26/82 FSAR Amend. 13

. (3)' _ Protection of UHS dam abutments against soil erosion

  • 10/30/81' FSAR Amend. 8 i '(4) Internally generated missiles - fan failure 4/4/82-

., (5) Protection against postulated piping failures 7/1/82

(6) Design adequacy of cable tray system 2/3/82 Meeting w/NRC Staff
(7). Containment ultimate strength analysis 5/1/82 (8) Structural integrity of safety-related masonry-walls
  • 11/3/81 IP letter U-0325 (9) NSSS pipe break analysis using SRP. criteria 7/1/82

.(10) Vibration assessment of RPV internals 7/1/82 i

'(11) Annulus pressurization loads (LOCA asymmetric loads) 7/1/82 (12) Use of SRSS for ' combining Mark III dynamic responses. for* 12/16/81 SRSS Subgroup Mark III other than LOCA and SSE Owners; Group (13) I&E Bulletin 79-02 regarding support baseplate flexibility

~

  • 5/29/81 FSAR Amend. 4
(14) Separation of low-pressure systems from RCS valves l (15) Mark'III hydrodynamic loads 9/15/82 (16) Feedwater check. valves analysis 4/5/82 (17) Seismic and LOCA loadings on fuel assemblies 8/15/82 LRG-II (18) Scram discharge system evaluation 9/15/82 (19) Fracture toughness data 2/26/82 FSAR Amend. 13
  • 1/29/82 FSAR Amend. 12 (20) Organic' materials
(21) Subcompartment pressure analysis 2/12/82 l-r

Page 2 of 4 4 2/1/82 ,

' Illinois Power Schedule for Clinton SER Confirmatory Information Clinton SER.

Confirmatory Schedule / Comments /

Issue No. Subject References (22) Steam bypass of the suppression pool

  • FSAR Section 6.2.1.1.5 (23) Combustible gas control 9/15/82 (24) Containment isolation dependability 5/14/82 (25) Containment monitoring 9/3/82 (26)' Plant-specific LOCA analysis 9/15/82 (27) High drywell pressure interlock 3/31/82 (28) ATWS recirculation pump trip. 8/1/82 (29) Response time testing 7/1/82 4- (30) Analog trip modules and optical isolators
  • 12/30/81 FSAR Amend. 11 (31) Susceptibility of the NSPS to electrical noise
  • 12/14/81 IP letter U-0365 (32) Modification of ADS logic 9/3/82 (33) Restart of low pressure systems 9/3/82 (34) Temperature effects of level measurements 9/3/82 (35) Containment atmosphere monitoring system 9/3/82 (36) Verification that testing is.in accordance with BTP-PSB-1 2/26/82 FSAR Amend.13+

(37) Electrical drawing review

, -(38) Verification of diesel generator testing 9/15/82 (39) Class A supervision and power supply for fire detec-tion system 5/1/82 (40) _ Moisture in air carting system

  • 11/30/81 FSAR Amend. 10

+ Revised respon'se to Power System Branch question #430.135 to be in FSAR Amend. 13. Actual testing verification to be made about December 1, 1982.

Page 4 of 4 2/1/82 ,

Illinois Power Schedule for Clinton SER Confirmatory Information ,

Clinton SER Confirmatory Schedule / Comments /

Issue No. Subject References (63) Conformance evaluation report for the loose parts monitoring 2/26/82 FSAR Amend. 13 (64) Requirements of NUREG-0313

  • 11/30/81 FSAR Amend. 10 (65) Control room habitability - chlorine gas
  • 1/29/82 FSAR Amend. 12 (66) Long-term pressure response
  • SER 6.2.1.4 (67) Containment design external differential pressure
  • SER.6.2.1.5 (68) Kuosheng data for SRV quencher design- 4/5/82 (69) Debris' screen design 2/26/82 FSAR Amend. 13 (70) Verification of adequacy of fire protection systems 6/1/82 (71) Flood-proof ~ door 2/26/82 FSAR Amend. 13

-(72) Valves in fire protection water supply steam

  • 11/19/61 IP letter U-0338 (73) Break in water supply piping
  • 11/19/81 IP letter U-0338 (74) Test data on fire-ratings
  • 11/19/81 IP letter U-0338 (75) Three-hour-fire-rated penetration seals
  • 11/19/81 IP letter U-0338 (76) Install fire protection equipment
  • FSAR Sect. 9.5.1 (77) Fire protection administrative controls and training 9/15/82 (78) Technical Specification on fire protection 9/15/82 4

(79) Periodic leak testing of pressure isolation valves

  • Information required has been provided to NRC 9

Pagn 3 of 4 2/1/82 ,

Illinois Power Schedule for Clinton SER Confirmatory Information Clinton SER Confirmatory Schedule / Comments /

Issue No. Subject References (42) Automatic prelube

  • 11/30/81 FSAR Amend. 10 (43) Testing, no load, and light-load operation
  • 11/20/81 IP letter U-0340 (48) Use of nonsafety-grade equipment in shaft seizsure event
  • SER Section 15.2 (49) Human engineering aspects of control room design I.D.1
  • 1/13/82 IP letter U-400 (50) Financial qualifications
  • 11/24/81 IP letter U-0332 (51) Common reference for reactor vessel level instru-ments, II.K.3.27 9/3/82 (52) Shielding design review, II.B.2 3/1/82 (53) Short-term accident & procedures review, I.C.1, I.C.7, I.C.8 7/3/82 (54) Training during low-power testing, I.G.1 9/1/82 (55) Plant shielding, II.B.2 3/1/82 (see #52 )

(56) Review ESF valves, II.K.1.5

  • 9/30/81 FSAR Amend. 7 AppendixD (57) Operability status, II.K.1.10
  • 9/30/81 FSAR Amend. 7 AppendixD (58) HPCI and RCIC initiation levels, II.K.3.13 9/1/82 (59) Isolation of HPCI and RCIC, II.K.3.15 9/1/82 (60) Qualification of ADS accumulators, II.K.3.28
  • 9/30/81 FSAR Amend. 7 AppendixD (61) Plant-specific analysis, II.K.3.31 9/15/82 (62) ODYN analysis for River Bend as applied to Clinton 2/26/82 FSAR Amend. 13