Final Deficiency Rept Re Pipe Hanger Stiff Clamps.W/O Encl Rept
ML20039E932
Person / Time
Site: Satsop
Issue date: 12/15/1981
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, GO3-81-2834, NUDOCS 8201110627
Download: ML20039E932 (2)


Text

1 i

Docket Nos. 50-508/509 l jbN $0 55(e) Report j EECEIVED 1 f.'n Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)l482 ,

Docket Numbers 50-508 and 50-509

, EEG.TIPit.;

December 15, 1981 G03-81-2834 l

\ /

oy qf U. S. Nuclear Regulatory Commission, Region V V -

Office of Inspection and Enforcement  ? M 1450 Maria Lane, Suite 260 JC.' T ~ ' : 2 7-Walnut Creek, California 94596-5368 i .. t.  ;)

\'

,j Attention: Mr. B. H. Faulkenberry '

. -/

Chief, Reactor Construction Projects Branch ,\

/

.~~~..-,

Subject:

PROJECT NOS. 3 AND 5 DOCKET NUMBERS 50-508 AND 50-509 FINAL REPORT OF P0TENTIAL 10CFR50.55(e)

ITT-GRINNELL PIPE HANGER STIFF CLAMPS (D/N #31)

In accordance with the provisions of 10CFR50.55(e), Region V was noti-fied that potential deficiencies, associated with pipe hanger stiff clamps, were found.

Attached is the final report which is considered by the Supply System to satisfactorily resolve the subject condition. The report includes a response to additional items of concern raised by the NRC.

Should you have any questions or desire further information, please contact me directly.

(M7[hW q 'R. d. LeddTck/1000 Program b rector, WNP-3/5 DRC/tt Attachment cc: J. Adams - NESCO-WO/A D. Smithpeter - BPA-W0/A Ebasco - New York-WO/A WNP-3/5 Files - Richland-WO/A l E ~& ,

rayifefJh!9BJ( [/o 8 _@]_-_l }[