MONTHYEARML20217G4341999-10-14014 October 1999 Rev C to Proposed TS Change Re Conversion to Improved Standard TSs ML20217G5121999-10-14014 October 1999 Revised Page 285 to TS Re Allowed Containment Leakage Rate, Changing Rev 0 to Rev 1 ML20216J3871999-09-29029 September 1999 Proposed Tech Specs Pages,Extending LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F6071999-06-22022 June 1999 Proposed Tech Specs Re pressure-temp Limits ML20195B8831999-06-0101 June 1999 Proposed Tech Specs,Converting to Improved Std TS ML20206U1421999-05-19019 May 1999 Proposed Tech Specs Revising AOTs for Single Inoperable EDG ML20205K1091999-04-0505 April 1999 Proposed Tech Specs,Removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20199H3611999-01-15015 January 1999 Proposed Tech Specs Table 4.1-2 Re Local Power Range Monitor (LPRM) Signal Calibr ML20198M8321998-12-30030 December 1998 Proposed Tech Specs Page 258f Re Configuration Risk Mgt Program ML20197G6181998-12-0303 December 1998 Proposed Tech Specs Reducing Size of Spent Fuel Rack Assembly N3 from 8x13 Cells to 8x12 Cells & Deleting Proposed Inclusion of Fuel Pool Water Level Inadvertent Drainage Into Amend ML20154M7181998-10-16016 October 1998 Proposed Corrected Tech Specs Section 3/4.6.C,relocating Portions of Reactor Coolant Sys - Coolant Chemistry ML20236X8041998-08-0303 August 1998 Proposed Tech Specs Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236M6231998-07-10010 July 1998 Proposed Tech Specs Pages Re Amend to Relocate TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20249B1631998-06-16016 June 1998 Proposed Tech Specs Re Relocation of Safety Review Committee Review & Audit Requirements ML20236L2931998-06-0707 June 1998 Proposed Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20217K0391998-03-30030 March 1998 Proposed Tech Specs Changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition for LSFT to Be Consistent w/NUREG-1433 ML20247F7981998-02-26026 February 1998 Proposed Tech Specs Re Allowed Containment Leakage Rate ML20202G8841998-02-0606 February 1998 Revised Proposed TS Pages,Revising Allowed Outage Times for 4kV Emergency Bus Trip Functions & Replace Generic Actions for Inoperable Instrument Channels w/function-specific Actions ML20202D4021998-02-0606 February 1998 Proposed Tech Specs Revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20202D5621998-02-0606 February 1998 Proposed Tech Specs Allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20203J6971997-12-12012 December 1997 Proposed Tech Specs,Revising Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217J0021997-10-14014 October 1997 Proposed TS Pages Re Changes to Design Features Section, Including Revised Limits for Fuel Storage ML20217G3071997-10-0808 October 1997 Proposed Tech Specs Re Distribution of Inoperable Control Rods ML20211H0801997-09-26026 September 1997 Revised Proposed TS Changes to ASME Section XI, Surveillance Testing ML20236N7061997-09-0909 September 1997 Proposed Tech Specs,Describing Licensee'S Configuration Risk Mgt Program Which Supports Rev of Allowed out-of-svc Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20140D8131997-04-14014 April 1997 Proposed Tech Specs Re SRC Audit Requirements & Mgt Title Change ML20135B1921996-11-26026 November 1996 Proposed Tech Specs,Requesting That Snubber Operability, Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20134M1751996-11-20020 November 1996 Proposed Tech Specs Reflecting Interposed Amend That Was Issued,Updating References to Repts on TS Pp & Changing Rev Bars on Previously Submitted Update Pp Which Were Erroneously Positioned on Pp ML20149L7191996-11-0808 November 1996 Proposed Tech Specs Re Min Critical Power Ratio Safety Limit ML20129G0091996-10-23023 October 1996 Proposed Tech Specs Re Page 134 Deleted Under Amend 236 & Remain Deleted ML20128Q7441996-10-11011 October 1996 Proposed Tech Specs Re Extension of Instrumentation & Miscellanous Surveillance Test to Accommodate 24 Month Cycles ML20115G0641996-07-12012 July 1996 Proposed Tech Specs Re Cycle 12 Min Critical Power Ratio Safety Limit ML20113B6511996-06-20020 June 1996 Proposed Tech Specs Re Option B to 10CFR50,App J for Primary Containment Leakage Rate Testing Program ML20112D1531996-05-30030 May 1996 Proposed Tech Specs,Revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D5711996-05-30030 May 1996 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements ML20112D2721996-05-30030 May 1996 Proposed Tech Specs Re ATWS Recirculation Pump Trip Instrumentation Requirements JPN-96-023, Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B1996-05-16016 May 1996 Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20108D1171996-04-24024 April 1996 Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20107M4511996-04-24024 April 1996 Proposed Tech Specs 3.11.B/4.11.B Re Crescent Area Ventilation ML20101H6741996-03-27027 March 1996 Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101H3821996-03-22022 March 1996 Proposed TS Table 3.2-2 Re Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20101F8411996-03-22022 March 1996 Proposed Tech Specs,Implementing BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20097A2271996-02-0101 February 1996 Proposed Tech Specs,Allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2991996-01-25025 January 1996 Proposed Tech Specs Re EDGs Surveillance Testing ML20097J6691996-01-25025 January 1996 Proposed Tech Specs Re Extension of Instrumentation & Miscellaneous Surveillance Test Intervals to Accommodate 24- Month Operating Cycles ML20095F7091995-12-14014 December 1995 Proposed Tech Specs,Incorporating IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code ML20094R6981995-11-30030 November 1995 Proposed Tech Specs,Extending Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6641995-10-25025 October 1995 Proposed Tech Specs Extending Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5401995-09-15015 September 1995 Proposed Tech Specs Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6561995-07-21021 July 1995 Proposed Tech Specs Re Replacement of title-specific List of PORC Members W/More General Statement of Membership Requirements 1999-09-29
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217G5121999-10-14014 October 1999 Revised Page 285 to TS Re Allowed Containment Leakage Rate, Changing Rev 0 to Rev 1 ML20217G4341999-10-14014 October 1999 Rev C to Proposed TS Change Re Conversion to Improved Standard TSs ML20217D9961999-10-13013 October 1999 Risk-Informed ISI Program Plan for Ja Fitzpatrick ML20216J3871999-09-29029 September 1999 Proposed Tech Specs Pages,Extending LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F6071999-06-22022 June 1999 Proposed Tech Specs Re pressure-temp Limits ML20195B8831999-06-0101 June 1999 Proposed Tech Specs,Converting to Improved Std TS ML20206U1421999-05-19019 May 1999 Proposed Tech Specs Revising AOTs for Single Inoperable EDG ML20205K1091999-04-0505 April 1999 Proposed Tech Specs,Removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20204B6321999-03-21021 March 1999 Plant Referenced Simulation Facility Four Year Performance Testing Rept ML20199H3611999-01-15015 January 1999 Proposed Tech Specs Table 4.1-2 Re Local Power Range Monitor (LPRM) Signal Calibr ML20206P0541998-12-31031 December 1998 Rev 3.2 to EDAMS/RADDOSE-V ML20198M8321998-12-30030 December 1998 Proposed Tech Specs Page 258f Re Configuration Risk Mgt Program ML20197G6181998-12-0303 December 1998 Proposed Tech Specs Reducing Size of Spent Fuel Rack Assembly N3 from 8x13 Cells to 8x12 Cells & Deleting Proposed Inclusion of Fuel Pool Water Level Inadvertent Drainage Into Amend ML20154M7181998-10-16016 October 1998 Proposed Corrected Tech Specs Section 3/4.6.C,relocating Portions of Reactor Coolant Sys - Coolant Chemistry ML20155E7831998-09-15015 September 1998 Rev 2 to Ja FitzPatrick NPP IST Program for Pumps & Valves Third Interval Plan ML20236X8041998-08-0303 August 1998 Proposed Tech Specs Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236M6231998-07-10010 July 1998 Proposed Tech Specs Pages Re Amend to Relocate TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20249B1631998-06-16016 June 1998 Proposed Tech Specs Re Relocation of Safety Review Committee Review & Audit Requirements ML20236L2931998-06-0707 June 1998 Proposed Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20217K0391998-03-30030 March 1998 Proposed Tech Specs Changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition for LSFT to Be Consistent w/NUREG-1433 B110073, Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy1998-02-28028 February 1998 Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy ML20247F7981998-02-26026 February 1998 Proposed Tech Specs Re Allowed Containment Leakage Rate ML20202G8841998-02-0606 February 1998 Revised Proposed TS Pages,Revising Allowed Outage Times for 4kV Emergency Bus Trip Functions & Replace Generic Actions for Inoperable Instrument Channels w/function-specific Actions ML20202D4021998-02-0606 February 1998 Proposed Tech Specs Revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20202D5621998-02-0606 February 1998 Proposed Tech Specs Allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20199G5921998-01-0707 January 1998 Rev 0 to JAF-ISI-0003, Third ISI Interval,Ten-Yr ISI Plan ML20199G5661998-01-0606 January 1998 Rev 0 to JAF-ISI-0002, Third ISI Interval,Isi Program. W/28 Oversize Drawings ML20203J6971997-12-12012 December 1997 Proposed Tech Specs,Revising Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217J0021997-10-14014 October 1997 Proposed TS Pages Re Changes to Design Features Section, Including Revised Limits for Fuel Storage ML20217G3071997-10-0808 October 1997 Proposed Tech Specs Re Distribution of Inoperable Control Rods ML20217K5841997-09-30030 September 1997 Rev 1 to Ja FitzPatrick Nuclear Power Plant IST Program for Pumps & Valves,Third Interval ML20211H0801997-09-26026 September 1997 Revised Proposed TS Changes to ASME Section XI, Surveillance Testing ML20236N7061997-09-0909 September 1997 Proposed Tech Specs,Describing Licensee'S Configuration Risk Mgt Program Which Supports Rev of Allowed out-of-svc Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20149G2571997-07-14014 July 1997 JAFNPP ISI Program Relief Requests for 2nd Ten-Yr Interval Closeout ML20140D8131997-04-14014 April 1997 Proposed Tech Specs Re SRC Audit Requirements & Mgt Title Change ML20198G7211997-04-0303 April 1997 Hot Rolled XM-19 Stainless Steel Core Shroud Tie-Rod Matl - Crevice Corrosion Investigation ML20136H3771997-03-11011 March 1997 Rev 0 to Power Uprate Startup Test Rept for Cycle 13 ML20135B1921996-11-26026 November 1996 Proposed Tech Specs,Requesting That Snubber Operability, Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20134M1751996-11-20020 November 1996 Proposed Tech Specs Reflecting Interposed Amend That Was Issued,Updating References to Repts on TS Pp & Changing Rev Bars on Previously Submitted Update Pp Which Were Erroneously Positioned on Pp ML20149L7191996-11-0808 November 1996 Proposed Tech Specs Re Min Critical Power Ratio Safety Limit ML20129G0091996-10-23023 October 1996 Proposed Tech Specs Re Page 134 Deleted Under Amend 236 & Remain Deleted ML20128Q7441996-10-11011 October 1996 Proposed Tech Specs Re Extension of Instrumentation & Miscellanous Surveillance Test to Accommodate 24 Month Cycles ML20135D0311996-07-31031 July 1996 Rev 4 to Radiological Effluent Controls & Offsite Dose Calculation Manual ML20115G0641996-07-12012 July 1996 Proposed Tech Specs Re Cycle 12 Min Critical Power Ratio Safety Limit ML20113B6511996-06-20020 June 1996 Proposed Tech Specs Re Option B to 10CFR50,App J for Primary Containment Leakage Rate Testing Program ML20112D1531996-05-30030 May 1996 Proposed Tech Specs,Revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D2721996-05-30030 May 1996 Proposed Tech Specs Re ATWS Recirculation Pump Trip Instrumentation Requirements ML20112D5711996-05-30030 May 1996 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements JPN-96-023, Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B1996-05-16016 May 1996 Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20108D1171996-04-24024 April 1996 Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day 1999-09-29
[Table view] |
Text
l
. ?. - ..
i ATTACHE NT I PROPOED 'IECHNICAL SPECIFICATION CHANGES ELA'IED TO SAPETY EVIEW COMMIT'IEE EOEANIZAITON 4
! January 6, 1982 i
i i POER AUTHORITY OF TE STA'IE OF WW YORK JAES A. FITZPATRICK NUCIEAR PODER PLANT DOCEET NO. 50-333 i j
?ER*ii82Rof!8s%
PDR
- f. Radiological safety g.- Mechanical engineering
- h. Electrical engineering
- 1. -Administrative controls and quality assurance practices
- j. Environment K. Civil / Structural Engineering
- 1. Nuclear Licensing
- m. Emergency Planning
- n. Other appropriate-fields associated with the unique characteristics of a nuclear power plant MEMBERSHIP 6.5.2.2 The SRC shall be composed of the following voting members:
Chairman: Manager-Nuclear Safety Evaluation l Vice-Chairman: Vice President-Quality Assurance Member: Vice President Nuclear Support-BWR l Member: Vice President Nuclear Support-PWR l Member: Manager Radiological Health and Chemistry Member: Director-Nuclear Design and Analysis l Member: Director-Electrical Design and Analysis Member: Director of Environmental Programs Member: Director-Civil / Structural Design and Analysis Member: Director-Mechanical Design and Analysis Member: Director-Piping and Process-Design and Analysis Member: o Manager Operati~nal Analysis and Training )
ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the SRC Chairman; however, no more than two alternates shall participate as voting members in SRC activities at any one time.
CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the SRC Chairman to provide expert advice to the SRC.
MEETING FREQUENCY 6.5.2.5 The SRC shall meet at least once per calendar quarter during the initial year of facility operation following initial fuel loading and at least once per six months, theresfter.
)
I Amendment No. pd, 54' l
251 ,
l
-QUORUM-6.5.2.6 A quorun. of SRC shall consist of the Chairman or
, Vice-Chairman and four members, including altertates. No l more than a ninority of the quorum shall have a uirect line responsibility for the operation of the plant.
REVIEW 6.5.2.7 The SRC shall review:
- a. The safety evaluation for 1) changes to procedures, equipment or systems and 2) tests or experiments com-pleted under the provision of Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed sefety question.
- b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
- c. Proposed tests or experiments which involve an un-revicwed safety question as defined in Section 50.59, 10 CFR.
- d. Proposed changes to Technical Specifications of this 4
Operating License.
- e. Violations of code, regulations, orders, Technical Specificetions, license requirements, or of internal procedures or instructions having nuclear safety significance.
- f. Significant operating abnormalities or deviations from normal and expected performance of plant equipment that affect nuclear safety.
- g. Events requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> written notification to the Commission.
- h. All recognized indications of an unanticipated defi-ciency '.i. some aspect of design or operation of safety related structures, systelas , or components.
- i. Reports and meetings minutes of the Plant Operating Revieti Committee.
AUDIT 6.5.2.8 Audits of facility activities ~shall be performed under the cognizance of the SRC. These audits shall encompass:
- a. The conformance of facility operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months.
- b. The performance, training and qualifications of the entire facility staff at least once per 12 months.
AmendmentNo.,MI,[ 252
1 c.- Tha results of action: taken to correct dnficiencies l occurring in facility equipment, structuras,~cystems
.. .- . or method of operation that affect nuclear safety at least once per 6 months.
- d. The-performance of activities required by the Opera-tional Quality Assurance Program to meet the criteria of Appendix "B", 10 CFR 50, at least once per 24 months.
- e. The Facility Emergency Plan and implementing procedures at least once per 24 months.
- f. The Facility Security Plan and implementing procedures at least once per 24 months.
, g. Any other area of facility operation considered l appropriate by the SRC or the Senior Vice President-Nuclear Generation.
- h. The Facility Fire Protection Program and implementing procedures at least once per two years.
- i. An independent fire protection and loss of prevention inspection and audit ehall be performed annually utilizing either qualified offsite licensee personnel an outside fire protection firm.
- j. An inspection and audit of the fire protection and loss prevention program shall be performed by an outside qualified fire consultant at intervals no greater than 3 years.
AUTHORITY 6.5.2.9 The SRC shall report to and advise the Senior Vice President-Nuclear Generation on those areas of responsibility specified in Section 6.5.2.7 and 6.5.2.8.
RECORDS 6.5.2.10 Records will be maintained in accc.rdance with ANSI 18.7-1972. The following shall be prepared, approved and distributed as indicated below:
- a. Minutes of each SRC meeting shall be prepared, approved '
and forwarded to the Senior Vice President-Nuclear Generation within 14 days 7.fter the date of the meeting.
- b. Reports of review encompassed by Section 6.5.2.7 above, shall be prepared, approved and forwarded to the Senior Vice President-Nuclear Generation within 14 days l.
following completion of the review.
- c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Senior Vice President-Nuclear Generation and to the management positions responsible for the areas audited within 30 days after completion of the audit. j l
Amendment No. 50, GO 252a
. o . .
CHARTER 6.5.2.11 Conduct of the committee will be in accordance with a charter approved by the Senior Vice President-Nuclear Generation setting forth the mechanism for implementation of the committee's responsibilities and authority.
6.6 REPORTABLE OCCURRENCE ACTION (A) In tha event of a Reportable Occurrence, the NRC shall be notified and.or a report submitted pursuant to the requirements of Specification 6.9.
(B) Each Reportable Occurrence requiring 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to the NRC shall be reviewed timely by the PORC and a report submitted by the Resident Manager to the Senior Vice President-Nuclear Generation and the SRC.
6.7 SAFETY LIMIT VIOLATION (A) If a safety limit is exceeded, the reactor shall be shut down and reactor operation shall only be resumed in accordance with the provi'sions of 10 CFR 50.36 (c) (i).
(B) An immediate report of each safety limit violation shall be made to the NRC by the Resident Manager. The Senior Vice President-Nuclear Generation and Chairman of the SRC will be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
(C) The PORC shall prepare a complete investigative report of each safety limit violation and include appropriate analys_s 4
and evaluation of: (1) applicable circumstances preceding the occurrence, (2) effects of the occurrence upon facility component systems or structures and (3) corrective action required to prevent recurrance. The Resident Manager shall forward this report to the Senior Vice President-Nuclear Generation, Chairman of the SRC and the NRC.
6.8 PROCEDURES (A) Written procedures and administrative policies shall be established, implemented and maintained that meet or exceed the requirements and
- recommendations of Section 5 " Facility Administrative Policies and Procedures" of ANSI 18.7-1972 and Appendix A of Regulatory Guide 1.33, November 1972. In addition, procedures shall be established, implemented and maintained for the Fire Protection Program.
(B) Those procedures affecting nuclear safety shall be reviewed by PORC and approved by the Resident Manager prior to implementation.
(C) Temporary changes to nuclear related precedures may be made provided:
- 1. The intent of the original. procedure is not altered.
1 Amendment No. 50, 90 253
i p PRESIDENT &
g CHIEF OPERATING .
l z OFFICER O
z d
I I l-o EXECUTIVE V. P. EXECUTIVE V. P. t SENIOR VICE PRESIDENT PROCEDURES AND PERFORMANCE & CHIEF ENGINEER NUCLEAR GENERATION E
SAFETY REVIEW COMMI'1 iG
- DIRECTOR OF RESIDENT SAFETY AND FIRE PROTECTION MANAGER PROCEDURES AND PERFORMANCE tThe Senior Vice President Nuclear Generation is responsible for administerting the fire protection program.
to 01
- The Director of Safety and Fire Protection is the off-site management position responsible for assessing the effectiveness of the fire protection programs by conducting reviews and audits.
FIGURE 6.1-1 MANAGEMENT ORGANIZATION CHART
' JAMES A. FITZPATRICK NUCLEAR POWER PLANT
I PRESIDENT AND CHIEF OPERATING OFFICER SENIOR VICE PRESIDENT- EXECUTIVE VICE NUCLEAR GENERATION PRESIDENT AND CHIEF ENGINEER ,
SAFETY REVIEW COMMITTEE RESIDENT MANAGER O I
~
^
PROGRAMS l HEAUm AND CHmISTRY STAFF STAFF L
Figure 5.2-2 Management Organization-Offsite Radiological Environmental James A. FitzPatrick Nuclear Power Plant AmendmentNo.pd 44
I
.. . l 4
ATTACHENT II SAFETY EVALUATION ELATE D TO SAFETY EVIEW COMMITTEE EORGANIZAITON
~
f 4
/
January 6, 1982 POER AlfrHORITY OF TIE STATE U
. !EW YORK 1
JAES A. FITZPATRICK NUCIEAR POER PLANT DOCET NO. 50-333 4
4 ,
I l
1
l
. . j
. r .- . l SECTION I - Description of Modification The proposed changes to Appendix A (Technical Specifications) of the James A. FitzPatrick Operating License seeks to amend Section 6.5.2, " Safety Review Committee (SRC) ." The proposed changes make the Safety Review Committee reportable to the Senior Vice President - Nuclear Generation.
Previously, the SRC reported to the President and Chief Operating Officer.
The change to pages 252a, 253 and 259 is, in essence, a replacement of the i
word ' President' with ' Senior Vice President - Nuclear Generation.'
Similarly, Figure 6.1-1 (Management Organization Chart) on page 259 of
) Appendix A and Figure 5.1-2 (Management Organization - Offsite Radiological i
Environmental) on page 44 of Appendix B is revised to show the SRC reporting to the Senior Vice President - Nuclear Generation. In addition, the titles of the SRC members have been changed to reflect the recent Authority headquarters office reorganization. The SRC quorum has been changed to agree with the Commission's standard technical specifications.
Section III - Purpose of the Modification This realignment of responsibility unifies nuclear-related technical j matters under a single Nuclear Generation Department. It will eliminate the division of authority which existed under the former organizational 3
structure. It will further improve communications between the SRC and those .
. 1 Authority person.iel having responsibility in matters concerning nuclear
- safety. Since the SRC will report to the Senior Vice President - Nuclear Generation, this position has been deleted from the SRC membership roster.
4
, The SRC will remain an independent review group cceptised of Authority i
personnel from both inside and outside the Nuclear Generation Department and I
meets the requirements for competence of Section 6.5.2.1 of Appendix A.
I a
f e
{ . .
l These changes also update the titles of SRC members to conform to a I recent reorganization of the Authority's headquarters office.
By reducing the SRC quorum from six to four members, this requirement will agree with the Commission's standard technical specifications.
Section III - Impact of the Change These proposed changes will not impact operations at FitzPatrick or the implementation of the emergency plan. The emergency plan will be revised to reflect the new management titles and repsonsibilities.
Section IV - Implementation of the Modification Since these changes affect only headquarters office organizations these changes will not impact the ALARA or Fire Protection Program at FitzPatrick.
c Section V - Conclusion The incorporation of these modifications: a) will not change the probability nor the consequence of an accident or malfunction of equipment important to safety as previously evaluated in the Safety Analysis Report; b) will not increase the possibility for an accident or malfunction of a different type than any evaluated previously in the Safety Analysis Report; and c) will not reduce the margin of safety as defined in the basis for any Technical Specification, and d) does not constitute an unreviewed safety question.
.. i
. t ** .
Section VI - References s
- 1. James A. FitzPatrick FSAR, Section 13.1 (Conduct of Operations - !
l General)
- 2. James A. FitzPatrick Facility Operating License; Appendix A (Technical Specifications), Section 6.2 (Plant Staff Organization); Appendix B (Environmental Technical Specifications, Section 5.2 (Administrative Controls - Organization)
- 3. Safety Evaluation - Authority Organization and Management Title Changes, NSE-NYO-013 dated December 11, 1981 u __