Notice of Violation from Insp on 930125-29 & 0211-12. Violation Noted:Protected Area Perimeter Fence Failed to Provide Assurance of No Intruder Penetration in That Bottom of Fence Section Was Capable of Being Raised to 11 Inches
ML20035E984
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/22/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20035E981 List:
References
50-528-93-05, 50-528-93-5, NUDOCS 9304200142
Download: ML20035E984 (1)


Text

NOTICE OF VIOLATION Krizona Public Service Company Docket No. 50-528 P.O. Box 53999, Station 9082 License No. NPF-41 Phoenix, Arizona 85072-3999 During an NRC inspection conducted on January 25-29, and February 11-12, 1993, a violation of NRC requirements was identified.

In accordance with the

" General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below:

Paragraph 2.E. of the Facility Operating License No. NPF-41 for Palo Verde Nuclear Generating Station requires the licensee to fully implement and maintain in effect all provisions of the Commission-approved physical l

security, guard training and qualification, and safeguards contingency plans, including all amendments to those plans made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55, and pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

Section 3.1.2. of the licensee's approved Security Plan describes in part the design and specifications of the protected area perimeter fence and requires that this fence provide " assurance of no intruder penetration."

P Contrary to the above, as of February 11, 1993, the protected area perimeter fence failed to provide assurance of no intruder penetration in that the bottom of a fence section was capable of being raised to a height of eleven inches.

This is a Severity Level V Violation (Supplement III).

i Pursuant to the provisions of 10 CFR 2.201, Arizona Public Service Company is hereby required to submit a written statement or explanation to the U.S.

Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, D.C.,

20555, with a copy to the Regional Administrator, Region V, and a copy to the Palo Verde NRC Resident Inspector, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation:

(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, the Commission may issue an order or a demand for information as to why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.

Consideration may be given to extending the response time for good cause shown.

Dated at Walnut Creek, California this 22nd day of March 1993 9304200142 930322 PDR ADOCK 05000528 G

PDR

-.