Interim Deficiency Rept DR-74 Re Incorrect Installation of 1/4-inch drilled-in-expansion-type Anchor Bolts Seismically Support Control Room Emergency Lighting Battery Units. Initially Reported on 820830.Next Rept by 830328
ML20028G151
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/28/1983
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, DR-74, RBG-14-232, NUDOCS 8302070458
Download: ML20028G151 (1)


Text

GULF STATES UTILt TIES COMPANY POST O F FIC E tl O x 2951 8CAUMONT, TEXAS 77704 AREA CODE 713 839-6631 January 28, 1983 RBG - 14,232 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional AAinistrator -

U. S. Nuclear Regulatory Commiss'on Region IV, Office of Inspection ad Enforcement 7c gjgg"M3'l

. a -

i l j

l 611 Ryan Plaza Drive, Suite iOOO j' Arlington, TX 76011 JM 311983  ; ,;

)

Dear Mr. Collins-

>, , a River Bend Statica Unit 1 Docket No. 50-458 Interim Report /DK-74 On August 30, 1982, Gulf States Utilities Company (GSU) notified the Nuclear Regulatory Commission's Region IV Office of a condition potentially reportable undte 10CFR50.55(e) concerning the incorrect installatier of 1.t-inch drilled-in-expansion-type anchor bolts used to seismically support emergency lighting battery units in the River Bend Station control room (DR-74). GSU has not completed its evalustion at this time. An interim or final status report will be provided by March 28, 1983.

Sin erely, p.E. Boo r Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 R. L. Brown (SRI) i 7h /