ML20028C928

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DR-85 Re Incorrect Taper at Welds Between Outside Diameter of Heavy Wall Pipe Fittings & Std Wall Pipe on Svc Water Piping Sys.Initially Reported on 821208.Investigation Continues.Next Rept Expected by 830303
ML20028C928
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/07/1983
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, DR-85, RBG-14-082, RBG-14-82, NUDOCS 8301140318
Download: ML20028C928 (1)


Text

g _; _.  :- -- - - - .

w.

GULF STATES UTILITIES COMPANY .

P o S T OF FIC E B O X 2951

  • DEAUMONT. T EX A S 7 7 704 AREA COoE 713 838 6631 7

Ja'nuary 7, 1983 JAN I 01983. "1RBG- 14,082 l - kp File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000-

-Arlington, Texas 76011-

Dear Mr. Collins:

River Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-85 On December 8, 1982, Gulf States Utilities Company (GSU) notified the Nuclear Regulatory Commission's Region IV Office of.a condition potentially reportable under 10CFR50.55(e) concerning incorrect taper at welds between the outside diameter (0.D.) of heavy wall pipe fittings and the O.D. of standard wall pipe on the 30 inch Service Water Piping System (DR-85). GSU has not completed its investigation at this time. An interim or final status report will be provided by March 3, 1983.

Sincerely,

~

J. E. Booker 1 Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuc1 car Group JEB /kt 9

- Te cc: Director of Inspection & Enforcement b U. S. Nuclear Regulatory Commission Washington, D. C. 20555 R. L. Brown (SRI) l 8301140318 830107 P l PDR ADOCK 05000458 PDR

S i

I

- . _ . . , - ,_