Interim Deficiency Rept Re Unsatisfactory Insp Performed by Former Field QC Inspector.Initially Reported on 820329. Re-evaluation of Insp Continuing.Next Rept to Be Provided by 821029
ML20027C165
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/30/1982
From: Booker J, Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, RBG-13-468, NUDOCS 8210130516
Download: ML20027C165 (1)


Text

GULF STATES UTILITIES COMPANY POST O F FIC C SOX 2951

  • GEAUMoNT, TEXAS 77704 AREA C O D E 713 838-6631 September 30, 1982 RBG- 13,468 File Nos. ' G9.5, C9. 25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcement g {#rf(:xr 611 Ryan Plaza Drive, Suite 1000 ,

"~~ ,,qj,[

Arlington, Texas 76011 !d ]

l

Dear Mr. Collins:

01:1 ', n' !l '

q f

River Bend Station Unit 1 Docket No.'50-458 j' -

Interim Report /DR-43 On March 29, 1982, Culf States Utilities Company (CSU) notified the Region IV Office of a condition potentially reportable under 10CFR50.55(c) concerning unsatisf actory inspections performed by a former Field Quality Control (FQC) Inspector at River Bend Station (DR-43). Interim reports were provided on April 29, 1982, and August 9, 1982, indicating that reevaluation of the inspections continued. On September 30, 1983, GSU determined based on the results of the evaluations that this condition met the intent of the reporting requirements under 10CFR50.55(e) and so informed the Region IV Office. A written report pursuant 10CFR50.55(e)(3) will be provided by October 29, 1982.

Sincerely, "J. E. Booker Manager-Engineering & Licensing River Bend Nuclear Group JEB/ /kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 g

R. L. Brown (RRI) [

/

8210130516 820930 PDR ADOCK 05000458 S ?DR