ML20027B168

From kanterella
Jump to navigation Jump to search
Interim Rept Re Cracking & Spalling of Surface Concrete Around Penetrations in Drywell Wall.Initially Reported on 820806.Investigation Incomplete.Next Rept to Be Submitted by 821007
ML20027B168
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/30/1982
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, DR-65, RBG-13-276, RBG-13-27655E, NUDOCS 8209160501
Download: ML20027B168 (1)


Text

~ .-. - - - . . . . - - - . . . _. . - . ~ . - . . . - _ - n.. .,n., . _ -

GULF STATES UTXLITIES COMPANY

.g POST o F FlC E 00X 2951

  • UEAUMONT, TEXAS 77704 A fi t A CODE 713 838 0631 August 30, 1982 RBG-13,276 File Nos. G9.5, G9.25.1 1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission hf V//@ 3 Region IV, Office of Inspection and Enforcement 9 f"

611 Ryan Plaza Drive, Suite 1000

~

s Arlington, Texas 76011 SEP 2 1982 L JJ

Dear Mr. Collins:

e nhsY1 River Bend Station Unit 1 ----

Docket No. 50-458 Interim Report /DR-65 On August 6, 1982, Gulf States Utilities Company (GSU) notified the Nuclear Regulatory Commission's Region IV Office of a condition potentially reportable under 10CFR50.55(e) concerning cracking and spalling of surface concrete around penetrations in the River Bend Station Drywell Wall (DR-65).

The condition was noted after pipes were welded onto existing guard pipes penetrating the drywell wall. GSU has not completed its investigation at this tima. An interim or final Status Report will be provided by October 7, 1982.

Sincerely, Y

J. E. Booker Manager-Engineering & Licensing River Bend Nuclear Group JEB/ /kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 i R. L. Brown (RRI) r h

01 820030 S khX05000450 PDR h