Interim Deficiency Rept Re Improperly Mfg Valve Springs in Two Diesel Generators Supplied by Delaval,Initially Reported 810903.Questionable Valve Springs Will Be Replaced & Properly shot-peened
ML20011A346
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/05/1981
From: Booker J
GULF STATES UTILITIES CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-PT21-81 10CFR-050.55E, RBG-11-312, NUDOCS 8110090338
Download: ML20011A346 (2)


Text

= .m GULF? STATES UTELETIES COMPANY POSToFFICEBOX 2951 . BEAUMONT, TEXAS 77704 AREA COoE 713 838-3843 October 5, 1981 RBG- 11,312 File Nos. G9.5, G9.25.1.1 N

Mr. Karl V. Seyfrit, Director / <-

U. S. Nuclear Regulatory Commission T -

)J Region IV, Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000

'D b[ .. ,

r

. 6_1 -

Arlington, Texas 76011 M% OCTOk%[pg 81981* 3

Dear Mr. Seyfrit:

River Bend Station-Unit 1 Y Docket No. 50 h58 On September 3, 1981 Gulf States Utilities Company notified your staff by telephone of a deficiency that is potentially reportable under Title 10 Code of Federal Regulation Part 50.55(e) concerning improperly manufactured valve springs in the two diesel generators supplied by Delaval. This letter serves as a thirty day status report as committed by Gulf States Utilities in the telephone notification.

Description of the Deficiency Transamerica Delaval Inc. notified the USNRC in accordance with the requirements of 10CFR Part 21.P1(2)(b) that sixty-four diesel engine valve springs manufactured by Melrose Spring and Tool works way not have been shot-peened properly.

Safety Implication ,

The shot-peening is necessary to relieve external stresses incurred in cold-working the spring vire. The lack of shot-peening could lend to fatigue, which then vould affect engine availability /per-formance. Two diesel engines supplied to River Bend Station for the safety related diesel generator system were in production at Delaval's facilities during the time period that the springs were available for installation on the engine cylinder head assemblies.

8110090338 81100 O PDR ADOCK 05000458 S PDR f { 27 61 0

Corrective Action Taken No corrective actions have been taken to date because it is not known if the River Bend diesels have the questionable springs.

Within the next 30 days the diesels vill be inspected.

If the questionable springs are found, it is currently antici-pated that they will be removed and replaced with properly s:.ot-peened springs.

At this time the two Delaval supplied diesel generators for River Benu are not in service and vill not be required to perform any safety function until after fuel loading. At no time was the health and safety of the public threatened. A follow-up report vill be forwarded to you within 30 days.

Sincerely, b

J. E. Booker Manager-Technical Programs River Bend Nuclear Group JEB/WJR/kt

,