Responds to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Util Procedure for Installing Wedge Type Anchor Bolts Approved Approx Two Wks Ago
ML19290C519
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 01/04/1980
From: Wuller G
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-02, IEB-79-2, NUDOCS 8001220040
Download: ML19290C519 (2)


Text

-i n bT )

U-0116

/LLINDIS POWER COMPANY tog _gozot_ogy.9 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 January 4, 1979 Mr. James G. Keppler Director, Region III Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Clinton Power Station Units 1 and 2 Docket Nos. 50-461 and 50-462 Construction Permit Nos. CPPR-137 & CPPR-138 This is in reply to your letter of November 8, 1979, whereby you forwarded Revision No. 2 to IE Bulletin No. 79-02. Our response to action items 1 through 4 of revision No. 1 was transmitted to you on July 5, 1979, by our letter U-0098, L08-79(07-05)-9. That re-sponse still applies to items 1 through 4, with the following clari-fications.

Item 2. Our procedure for installing wedge type anchers was approved approximately 2 weeks ago. We have not yet used con-crete anchors to support any category 1 piping.

Item 4. Our inspection criteria and procedure ara in force.

Any data resulting from their use will be availsole for inspection on the CPS site.

Item 5. Until anchors and procedures are approved, none will be used in concrete blocks. Testing is in progress toward the goal of qualifying specific expansion anchor bolts for use at CPS. When these are completed, we will report to you the results and our plans for using them.

1787 233

'hp1

  • 80 012 20 o 4 C7

6 Mr. James G. Keppler January 4, 1980 Item 6. Not applicable since we have not used any expansion anchors to support category 1 piping or equipment.

Items 7 & 8. Not applicable.

Sincerely,

/

G. E. Wuller Supervisor - Licensing Generation Engineering Department CCW/jh Enc.