ML19256F781
| ML19256F781 | |
| Person / Time | |
|---|---|
| Issue date: | 12/31/1978 |
| From: | NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | |
| References | |
| NUREG-0304, NUREG-0304-V02-N12, NUREG-304, NUREG-304-V2-N12, NUDOCS 7912200807 | |
| Download: ML19256F781 (28) | |
Text
.
4 NUREG-0304 Vol. 2, No.12 U.S. NUCLEAR REGULATORY COMMISSION PU BLiCATIONS FOR 1978
,"%y kfkk) 1771 001 Division of Technical Information and Document Control Office of Administration U. S. Nuclear Regulatory Commission Washington, D.C. 20555 g912200
PREFACE This listing consists of publications issued oy the U.S. Nuclear Regulatory Commission (NRC) in 1978. With this 1978 cumulation, NRC will cease issuing its Publications List. It will be replaced by NRC's Title List of Documents Made Publicly Available (NUREG-0540), which will be issued monthly, and which is available for sale from the National Technical Infor-mation Service, Springfield, VA 22161. Copies for January-April 1979 are currently available at NTIS.
Availability of NRC Publications Copies of NRC publications merked "Available at NRC" can be obtained by writing to the Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission Washington, D.C.
20555. Publications marked available at NTIS can be obtained from the National Technical Information Service, Springfield, Virginia 22161, at current costs.
NRC Report Codes The U.S. Nuclear Regulatory Commission has used several different report codes during the period since its inception in 1975. The earliest were:
r NR-DOR-XXX and NUREG-75/XXXX The NR designation was used for internal and inforaal docuinents that were not available at the National Technical Information Service (NTIS). The lettert following the NR were inter-nal division codes. The NUREG designation indicated that the document was NRC-approved for general availability and could be obtained from NTIS. Late in 1975 the NUREG number suffix was changed to eliminate the year and the formal report designation became NUREG-XXXX This designation is currently used for all NRC internally generated format documents made publicly available by standard distribution lists and for acquisition at NTIS.
The NR designation has been replaced with a computer generated accession number.
This accession number is used for both internal and contractor generated interim (preliminary) documents that are not widely distributed externally but are available to the public at the NRC Puolic Document Room. These documents frequently have secondary report numbers assigned by the contractor.
A memorandum of understanding with the Department of Energy authorized a further change in report designations in February 1978. This followed issuance of new instructions to all NRC contractors in January 1978 in the form of NRC Manual Chapter 3202, " Publication of Un-classified Regulatory and Technical Documents Prepared by NRC Contractors, Including Reports Prepared Under or Pursuant to Interagency Agreements." This Manual Chapter, which is avail-able (free) upon request from NRC's Division of Technical Information and Document Control, specifies that the contractor prepared formal documents will carry the NRC-controlled designation.
NUREG/CR-XXXX as the prime code, and that the contractor's code may appear below the NUREG designation.
9 1771 002 i
This type of identification replaces the former uncontrolled use of contractor-established codes such as ORNL/NUREG/TM-XXX TREE-NUREG-XXXX as well as various other numbers that could not be correlated with NRC sponsorship of the work being reported. Such contractor report codes may be indicated below the NUREG/CR-XXXX number in the future if the contractor so desires.
In addition to the NUREG and NUREG/CR codes, the following code is'now being used:
NUREG/CP for conference proceedings All of these report codes are controlled and assigned by the NRC Division of Technical Informution and Document Control.
Abbreviations for NRC Offices and Divisions OADM
- Office of Administration ACRS
- Advisory Committee for Reactor Safeguards OELD
- Office of the Executive Legal Director 01&E
- Office of Inspection and Enforcement OIP
- Office of International Programs OMPA
- Office of Management and Fregram Analysis OhMSS
- Office of Nuclear Material Safe'v and Safeguards ONRR
- Office of Nuclear Reactor Regulation OC
- Office of the Controller OPE
- Office of Policy Evaluation ORES
- Office of Nuclear Regulatory Research OSD
- Office of Standards Development OSP
- Office of State Programs DES
- Division of Engineering Standards DFC
- Division of Fuel Cycle and Material Safety 00R
- Division of Operating Reactors DPM
- Division of Project Management DRSR
- Division of Reactor Safety Research DSAFER
- Division of Safeguards, Fuel Cycle, and Environmental Research DSE
- Division of Site Safety and Environmental Analysis DSG
- Division of Safeguards DSHSS
- Division of Siting, Health, and Safeguards Standards 055
- Division of Systems Safety DTIDC
- Division of Technical Information and Document Control NUREG-75/087. Standard Review Plan for the Review of Safety Analysis Report for Nuclear Power Plants-LWR Edition. ONRR/ DSS. NTIS.
O 1771 003 y
The following revisions to the Standard Review Plan were issued in 1978.
Section Section 2.1.1 7.1 2.2.2
- 7. 2 2.3.1 7.3 2.3.2 7.4 2.3.3 7.5 2.3.5 7.6 2.4.1 7.7 2.4.2 2.4.3 8.1 2.4.4 8.2 2.4.5 8.3.1 2.4.6 8.3.2 2.4.7 2.4.8 9.1.1 2.4.9 9.1.2 2.4.10 9.1.4 2.4.11 9.2.1 2.4.12 9.2.4 2.4.13 9.2.5 2.5.1 9.2.6 2.5.3 9.3.2 2.5.3 9.3.3 2.5.4 9.3.4 2.5.5 9.3.4 9.3.5 3.3.2 9.4.1 3.4.1 9.4.2 3.5.1.1 9.4.3 3.5.2 9.4.5 3.9.1 9.5.1 3.9.2 9.5.2 3.9.5 9.5.3 3.9.6
- 9. 5. 4 3.10 9.5.5 3.11 9.5.6 9.5.7 9.5.8 4.2 4.3 4.5.2 10.2 10.3
'i. 4. 2. I 10.4.1 5.4.6 10.4.2 5.4.7 10.4.3 5.4.8 10.4.4 5.4.11 10.4.5 10.4.6 6.1.1 10.4.7 6.2.1 10.4.8 6.2.1.1 10.4.9 6.2.1.1A 6.2.1.18 11.1 6.2.1.lC 11.2 6.2.1.2 11.3 6.2.1.6 11.4 6.2.2 11.5 6.2.3 6.2.4 12.1 6.2.5 12.2 6.2.6 12.3 6.5.1 12.4 6.5.3 12.5 1771 004 1
I
Section Section 13.2 15.4.2 13.5 15.4.3 15.4.8 15.0 15.4.9 15.1.5 35,5,2 15.3.3 15.6.5 15.4.1 15.7.3 i
O G
1771 005
Final Environmental Impact Statements NUREG-0056 (Doo STN 50-437). Final Addendum to the Final Environmental Statement, Part II.
4-
'>J to the Manufacture of Floating Nuclear Power Plants. ONRR/DSE. June 1978. 1H..
NTIS.
NUREG-0319 Final Environmental Statement for Spark-Gap Irradiators that Contain Cobalt-60.
OSD/ DES. Jan. 1978. 140 pp.
NTIS.
NUREG-0343 (Docket 50-255). Final Addendum to the Final Environmental Statement on Palisades Nuclear Generating Plant. ONRR/DSE. Jan. 1978. 124 pp.
NTIS.
$6.50.
NUREG-0417 (Docket 50-366). Final Environmental Statement for Edwin I. Hatch, Unit 2.
ONRR/DSE. March 1978. 168 pp.
NTIS.
NUREG-0434 (Docket 50-548). Final Environmental Statement for Fort Calhoun Station, Unit No. 2.
ONRR/DSE. March 1978. 354 pp.
NTIS.
NUREG-0449 (Dccket 50-510/50-511). Blue Hill Final Environmental Statement on Early Site Review. ONRR/DSE. July 1978. 267 pp.
NTIS.
NUREG-0455, Vol. 1 (Docket 50-582/583). Final Environmental Statement on aundesert Nuclear Plant, Units 1 and 2.
ONRR/DSE. Oct. 1978. 576 pp.
NTIS.
NUREG-0455, Vol. ?
252 pp.
NTIS.
NUREG-0455, Vol. 3.
Maps. NTIS.
NUREG-0461 (Docket 50-580/50-581). Final Environmental Statement Related to Construction of Erie Nuclear Plant, Units 1 and 2.
ONRR/DSE. May 1978. 406 pp.
NTIS.
NUREG-0470 (Docket 50-466). Final Environmental Statement Supplement on Allens Creek Nuclear Generating Station. ONRR/DSE. Aug. 1978. 238 pp.
NTIS.
NUREG-0481 (Docket 40-8502). Final Environmental Statement on Wyoming Mineral Corporation Irigary Project. NMSS/DFC. Sept. 1978. 294 pp.
NTIS.
NUREG % o, (Docket 50-373/50-374). Final Environmental Statement on La Salle County Station, Units 1 and 2.
ONRR/DSE. Oct. 1978. 216 pp.
NTIS.
NUREG-0489 (Docket 40-8102). Final Environmental Statement for the Exxon Highland In Situ Uranium Solution Mining Project. ONMSS/DFC.
Nov. 1978. 252 pp.
NTIS.
NUREG-0498 (Docket 50-390/50-391). Final Environmental Statement Watts Bar Nuclear Plant, Units 1 and 2.
ONRR/DSE. Dec. 1978. 244 pp.
NTIS.
NUREG-0502 (Docket STN 50-437). Final Environmental Statement Related to the Manufacture of Floating Nuclear Power Plants. ONRR/DSE. Dec. 1978. 432 pp.
NTIS.
NUREG-0505 (Docket 40-8584). Finat Environmental Statement Sweetwater Uranium Project.
ONMSS/DFC. Dec. 1978. 292 pp NTIS.
Safety Evaluation Reports and Supplements NUREG-0013, Supp. 4 (Docket 50-514/50-515). Supplement 4 to the Safety Evaluation Report on the Pebble Springs Nuclear Plant, Units 1 and 2.
ONRR/DPM. Jan. 1978. 32 pp.
NTIS.
NUREG-0013, Supp. 5 (Docket 50-514/50-515). Supplement 5 to the Safety Evaluation Report on the Pebble Springs Nuclear Plant, Units 1 and 2.
ONRR/DPM. May 1978. 43 pp.
NTIS.
NUREG-0107, Supp. 2 (Docket 50-320). Supplement 2 to the Safety Evaluation Report on Three-Mile Island Nuclear Power Station, Unit 2.
ONRR/DPM. Feb. 1978. 62 pp.
NTIS.
1771 006
t j
NUREG-0190, Supp. 1 (Docket 50-556/50-557). Safety Evaluation Report for Construction of Black Fox Station, Units 1 and 2.
ONRR/DPH. Sept. 1978. 68 pp.
NTIS.
NUREG-0223 (Docket 50-368). Fire Protection Safety Evaluation Report for Arkansas Nuclear One, Unit 2.
ONRR/DPM. Sept. 1978. 60 pp.
NTIS.
NUREG-0283, Supp. 1 (Docket 50-549). Safety Environe. ental Report for Green County Nuclear Power Plant, Unit 1.
ONRR/DPM. Sept. 1978. 72 pp.
NTIS.
NUREG-0297 Safety Evaluation Report on Westinghouse Electric Company ECCS Evaluation Model for Plants Equipped with Upper Head Injection. ONRR/ DSS. May 1978. 92 pp.
NTIS.
NUREG-0308, Supp. 1 (Docket 50-368). Safety Evaluation Report Ralated to Operation of Arkansas Nuclear One, Unit 2.
ONRR/DPM. March 1978. 100 pp.
NTIS.
NUREG-0309, Supp. 1. (Docket 50-522/50-523). Safety Evaluation Report for Skagit Nuclear Power Project, Units 1 and 2.
ONRR/DPM. Oct. 1978. 76 pp.
NTIS.
NUREG-0347, Supp. 1 (Docket STN 50-566/567). Supplement I to the Safety Evaluation Report Related to the Construction of Yellow Creek Nuclear Plant, Units 1 and 2.
ONRR/DPM.
June 1978. 58 pp.
NTIS.
NUREG-0358. (Project 448) Safety Evaluation Report Related to Operation of the Fast Flux Test Facility. ONRR/DPM. August 1978. 411 pp.
NTIS.
NUREG-0411 (Docket 50-366). Safety Evaluation Report Related to the Operation of the Edwin I. Hatch Nuclear Plant, Unit No. 2.
ONRR/DPM. June 1978. 253 pp.
NTIS.
NUREG-0421 (Docket 50-500/50-501). Safety Evaluation Report Related to Construction of Davis-Besse Nuclear Power Station, Units 2 and 3.
ONRR/DPM. July 1978. 265 pp.
NTIS.
NUREG-0422 (Docket 50-369/50-370). Safety Evaluation Report for McGuire Nuclear Station, Units 1 and 2.
ONRR/DPM. March 1978. 311 pp.
NTIS.
NUREG-0422, Supp. 1.
(Docket 50-369/50-370). Safety Evaluation Report Related to Operation of McGuire Nuclear Station, Units 1 and 2.
ONRR/DPM. May 1978. 28 pp.
NTIS.
NUREG-0423 (Docket STN 50-580/50-581). Safety Evaluation Report Related to Construction of Erie Nuclear Plant, Units 1 and 2.
ONRR/DPM. July 1978. 460 pp.
NTIS.
NUREG-0424 (Docket sin 50-568/50-569). Safety Evaluation Report Related to Construction of New England Uiits 1 and 2.
ONRR/DPM. June 1978. 647 pp.
NTIS.
NUREG-0433 (Docket SIN 50-561). Safety Evaluction Report Related to the Preliminary Design of the BSAR-205 Standard Design by Babcock and Wilcox. ONRR/DPM. June 1978. 220 pp.
NTIS.
NUREG-0469 (Docket 50-582/50-583). Interim Safety Evaluation Report for Sundesert Nuclear Power Plant, Units 1 and 2.
ONRR/DPM. Oct. 1978. 316 pp.
NTIS.
NUREG-0491 (Docket STN 50-572). Safety Evaluation Report for RESAR 414 (Westinghouse).
ONRR/DPM.
Nav. 1978. 328 pp.
NTIS.
Periodical Reports NUREG-0020 Operating Units Status Report (Gray Book). OMPA. Monthly NTIS subscription.
NUREG-0030 Construction Status of Nuclear Power Plants (Yellow Book).
OMPA. Monthly. NTIS subscription.
NUREG-0040. Licensee Contractor and Vendor Inspection Report (White Book). OI&E.
Quarterly. NTIS subscription.
T 1771 007
-a.
NUREG-0090. Report to Congress on Abnormal Occurrences. OMPA. Quarterly. NTIS.
NUREG-0135. Water Reactor Safety Research Status Summary Report (Buff Book). OMPA.
Bimonthly. NTIS subscription.
NUREG-0298. Fire Protection Action Plan. OMPA. Quarterly. NTIS.
NUREG-0380. Program Summary Report (Brown Book). OMPA. Montnly. NTIS subscription.
U. S. NJclear Regulatory Commission Staff Practice and Procedures Digest.
OELD. Quarterly. NTIS subscription.
NUREG-0430. Licensed Fuel Facility Status Report. OI&E. Semiannual. NTIS subscription.
Other Staff-Generated Reports NUREG-0016, Rev. 1.
Calculations of Releases of Radioactive Materials in Gaseous and Liquid Effluents for BWR's (BWR-GALE Computer Code). ONRR/DSE. Dec. 1978. 156 pp.
NTIS.
NUREG-0029, Vol. 2.
Geotechnical and Strong Motion Earthquake Data from U. S. Accelerograph Stations. ORES /DRSR. June 1978. 270 pp.
NTIS.
NUREG-0039-2.
U. S. Nuclear Regulatory Commissian Budget Estimates - Fiscal Year 1978.
OC.
Jan. 1978. 80 pp.
NTIS.
NUREG-0103 Rev. 2.
Stardard Technical Specifications for Babcock and Wilcox Pressurized Water Reactors. ONRR/00R. June 1978. 434 pp.
NTIS.
NUREG-0123, Rev. 1.
Standard Technical Specifications for General Electric Boiling Water Reactors. ONRR/DPM. April 1978. 367 pp.
NTIS.
NUREG-0133. Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants. ONRR/DSE.
Nov. 1978. 160 pp.
NTIS.
NUREG-0180, Draft Revision. Early Site Revi?w for Nuclear Power Facilities: Procedures and Possible Technical Review Options. OSD/DSHSS.
Feb. 1978. 63 pp.
Available at NRC.
NUREG-0219. Nuclear Secur'ry Personnel for Power Plants - Content and Review Procedures for Training and Qualification Plans. ONRR/ DOR. June 1978. 171 pp.
NTIS.
NUREG-0219, Draft 2.
Nuclear Security Personnel for Power Plants. ONRR/ DOR. April 1978.
234 pp.
Available at NRC.
NUREG-0222. Licensed Uranium Mills, Uranium Hexafluoride Production Plants, and Fuel Facilities. ONMS$/DFC. Aug. 1978. 465 pp.
ATIS.
NUREG-0224. Final Report on Reactor Vessel Pressure Trar.sient Protection For Pressurized Water Reactors. ONRR/DPM. Sept. 1978. 104 pp.
NTIS.
NUREG-0245. Capital Cost Addendum: Multi-Unit Coal and Nuclear Stations. ONRR/DSE.
Mdrch 1978. 190 pp.
NTIS.
NUREG-0247. Cooling Systems Addendum - Capital and Total Generating Cost Studies.
ONRR/DSE. Sept. 1978. 228 pp.
NTIS.
NUREG-0258. OCTAVIA: A Computer Code to Calculate the Ptobability of Pressure Vessel failure from Pressure-Transient Occurrences. ORES /Probabalistic Analysis Staff.
March 1978. 50 pp.
NTIS.
NUREG-0300. Proposed Goals for Radioactive Waste Management. Bishop, W.
P., and others.
NMSS/DFC. May 1978. 36 pp.
Available at NRC.
NUREG-0303. Evaluation of the Behavior of Water logged Fuel Rod Failures in LWR's.
ONRR/ DSS.
March 1978. 28 pp.
NTIS.
1771 008 NUREG-0320. Interior Intrusion Alarm Systems. Prell, J.
OSD/DSHSS. Feb. 1978. 47 pp.
NTIS.
NUREG-0323. Occupational Radiation Exposure at Light Water Cooled Power Reactors, 1976.
OMPA. March 1978. 75 pp.
NTIS.
NUREG-0327, Revision 1.
Owners of Nuclear Power Plants. ONRR/ Antitrust Indemnity Group.
Nov. 1978. 60 pp.
NTIS.
NUREG-0336. Arkansas Nuclear One Unit 2 Technical Specifications. ONRR/ DOR. July 1978.
40 pp.
Nils.
NUREG-0348. Demographic Statistics Pertaining to Nuclear Plant Sites. ONRR/DSE.
Jan 1978. Available at NRC.
NUREG-0351. Annual Report of Contract Research for the Metallurgy and Materials Research Branch, Division of Reacto Safety Research Fiscal Year 1977. ORES /DRSR. May 1978.
356 pp.
NTIS.
NUREG-0360. Qualification Criteria to Certify a Package for Air Transport of Plutonium.
ONMSS/DFC. June 1978. 67 pp.
NTIS.
NUREG-0361. Safety Analysis Report for the Plutonium Air Transportable Package, Model PAT-1.
ONMSS/DFC. June 1978. 194 pp.
NTIS.
NUREG-0367. Radioactive Materials Released from Nuclear Power Plants, 1976. OMPA.
March 1978. 180 pp.
NTIS.
NUREG-0371. Approved Category A Task Action Plans. ONRR/ DSS. Nov. 1978. 512 pp.
NTIS.
NRUEG-0375. Proceedings of Two-Phase Flow Instrumentation Review Group Meeting, January 13-14, 1977. ORES /DRSR. March 1978. 271 pp.
NTIS.
NUREC-0383, Vol. 2, Rev. 1.
Directory of Certificates of Compliance for Radioactive Materials Packages. ONMSS/DFC. Dec. 1978. 664 pp.
NTIS.
NUREG-0389. Cost-Benefit Analysis Requirements of Appendix I to 10 CFR Part 50.
ONRR/DSE.
Jan. 1978. 80 pp.
NUREG-0393. Summary Report of Jointly Sponsored NRC-DOT State Transportation Surveillance Program Involving Low-Level Radioactive Materials: Findings a-d Recommendation. OSP.
March 1978. 46 pp.
NTIS.
NUREG-0395. Technical Specifications for Edwin I. Hatch Nuclear Plant, Unit 2.
ONRR/ DOR.
June 1978. 366 pp.
NTIS.
NUREG-0397. Revised Inspection Programs for Nuclear Power Plants. OI&E. March 1978.
29 pp.
NTIS.
NUREG-0401. Fuel Failure Detection in Operating Reactors. ONRR/ DSS. March 1978. 32 pp.
NTIS.
NUREG-0412. Essays on Issues Relevant to the Regulation of Radioactive Waste Management.
Bishop, W. P. and others. ONMSS/DFC. May 1978. 100 pp.
NTIS.
NUREG-0413. Staff Report on the Environmental Qualification of Safe y-Related Electrical Equipment. ONRR/ DOR.
Feb. 1978. 87 pp.
NTIS.
NUREG-0414, Executive Summary. Safeguarding a Domestic Mixed Oxide Industry Against a Hypothetical Subnational Threat. ONM5S/DSG. May 1978. 23 pp.
NTIS.
NUREG-0414, Main Report. May 1978. 316 pp.
NTIS.
O 1771 009 NUREG-0418. Fission Gas Release from Fuel at High Burr.up. ONRR/ DSS. March 1978. 64 pp.
NTIS.
NUREG-0419. Occupational Radiation Expcsure at NRC-Licensed Facilities - 1975. OSD/DSHSS.
March 1978 41 pp.
NTIS.
NUREG-0425. NRC Inspection Alternatives: A Study Report. OI&E.
Feb. 1978. 63 pp.
NTIS.
NUREG-0426. Conditions and Limitations on the General License Provisions of 10 CFk 150.20.
OI&E. March 1978. 86 pp.
NTIS.
NUREG-0427. Review of the Commission Program for Standardization of Nuclear Power Plants and Recommendations to Improve Standardization Concepts. ONRR/DPM. May 1978. 257 pp.
NTIS.
NUREG-0432. Appendix A.
Three Mile Island Technical Specifications for Nuclear Station, Unit 2.
ONRR/DPM.
Feb. 1978. 387 pp.
Available from NRC.
NUREG-0432. Appendix B.
Three Mile Island Technical Specifications for Nuclear Station, Unit 2.
ONRR/DPM. Feb. 1978. 80 pp.
Available from NRC.
NUREG-0436. Plan for Reevaluation of NRC Policy on Decommissioning of Nuclear Facilities.
OSD/ DES. March 1978. 69 pp.
NTIS.
NUREG-0436, Rev. 1.
Plan for Reevaluation of NRC Policy on Decommissioning of Nuclear Facilities. OSD/ DES. Dec. 1978. 140 pp.
NTIS.
NUREG-0438. Plan for Research to Improve the Safety of Light Water Nuclear Power Plants.
ONRR/DRSR. April 1978. 133 pp.
Nils.
NUREG-0440. Liquid Pathway Generic Study: Impacts of Accidental Radioactive Releas9s to Plants. ONRR/DSE.
the Hydrosphere from Floating and Land-Based Nuclear Po*
a Feb. 1978. 399 pp.
NTIS NUREG-0442. Technical Report on Operating Experience with BWR Offgas Systems. ONRR/ DOR.
April 1978. 37 pp.
NTIS.
NUREG-0444. BEIRMOD: A Computer Program for Calculating the Effects of Exposure to Ionizing Radiation. OSD/DSHSS. May 1978. 33 pp.
NTIS.
NUREG-0447. Recent Developments in the NRC's Antitrust Review of Nuclear Power Plants.
Delaney, J. B., Honeycutt, T. C., Messier, M.
ONRR/ Antitrust and Indemnity Group.
May 1978. 60 pp. HTIS.
NUREG-0448. Proceedings from the NRC-IAEA Spent Fuel Storage Meeting: February 28 -
March 1, 1978. OIP. May 1978. 398 pp.
NTIS.
NUREG-0450, Executive Summary. Report of the Material Control and Material Accounting Task Force. ONMSS/DSG. April 1978. 12 pp.
NTIS.
NUREG-0450, Vol. 1.
41 pp.
NTIS.
NUREG-0450, Vol. 2.
169 pp.
NTIS.
NUREG-0450, Vol. 3.
153 pp.
NTIS.
NUREC-0450, Vol. 4.
144 pp. NTIS.
NUREG-0452. Standard Tech 7ical Specifications for Westinghouse Pressurized Water Reactors Revision of May 1978. ONRR/ DOR. June 1978. 584 pp.
NTIS.
NUREG-0456. A System for Classifying Radioactive Waste. ONMSS/DFC. July 1978. 447 pp.
NTIS.
1 7' 7 1 f) i ()
f NUREG-0457. SIMMER: An Experimental Verification Program Plan Code for LMFBR Disrupted Core Analysis. ORES /DRSR. Sept. 1978. 52
.o.
NTIS.
NUREG-0458. Short Term Safety Assessment on the Environmental Qualification of Safety -
Related Electrical Equipment of SEP Operating Reactors. ONRR/00R. Ma3 1978. 61 pp.
NTIS.
NUREG-0460, Vol. 1.
Anticipated Transients Without Scram for Light Water Reactors.
ONRR/ DSS. April 1978. 105 pp.
NTIS.
NUREG-0460, Vol. 2.
April 1978. 734 pp. NTIS.
NUREG-0460, Vol. 3.
Dec. 1978. 224 pp.
NTIS.
NUREG-0462. Technical Report on Operating Experience with BWR Pressure Relief Systems.
ONRR/ DOR. July 1978. 65 pp.
NTIS.
NUREG-0463. Tenth Annual Occupational Radiation Exposure Report - 1977. CMPA. Oct. 1978.
56 pp.
NTIS.
NUREG-0464, Vol. 1.
Draft Site Security Personnel Training Manual. OSD/DSHSS. July 1978.
347 pp.
Available at NRC.
NUREG-0464, Vol. 2.
July 1978. 493 pp.
Available at NRC.
NUREG-0464, Vol. 3.
July 1978. 158 pp.
Available at NRC.
NUREG-0464, Vol. 4.
July 1978. 128 pp.
Available at NRC.
NUREG-0464, Vol. 1.
Site Security Personnel Training Manual. OSD/DSHSS. Oct. 1978.
132 pp.
NTIS.
NURTG-0464, Vol. 2.
412 pp. NTIS.
NUREG-0464, Vol. 3.
132 pp.
NTIS.
NUREG-0464, Vol. 4.
88 pp.
NTIS.
NUREG-0465, Vol. 1.
Draft Transportation Security Personnel Training Manual. OSD/DSHSS.
July 1978. 347 pp.
Available at NRC.
NUREG-0465, Vol. 2.
July 1978. 520 pp.
Available at NRC.
NUREG-0465, Vol. 3.
July 1978. 241 pp.
Available at NRC.
NUREG-0465, Vol.
1.
Transportation Security Personnel Training Manual. OSD/DSHSS.
Nov.
1978. 208 pp.
NTIS.
NUREG-0465, Vol. 2, Part A.
332 pp.
NTIS.
NUREG-0465, Vol. 2, Part d.
512 pp.
NTIS.
NUREG-0465, Vol.
252 pp.
NTIS.
NUREG-0466. Calculation of Release of Radioactive Materials in Gaseous Effluents from Nuclear Powered Merchant Ships. ONRR/DSE. July 1978. 90 pp.
NTIS.
NUREG-0467. Technical Report on Operating Experience with Snubbers in Operating Nuclear Power Plants. ONRR/ DOR. Oct. 1978. 68 pp.
NTIS.
NUREG 0468. Investigation and Analysis of a Mass Mortality of Commercial Lobsters in Seabrook Harbor, New Hampshire, During October of 1977. ONRR/DSE. July 1978.
104 pp.
NTIS.
1771 011 0
NUREG-0471. Generic Task Problem Descriptions-Category B, C, and D Tasks. ONRR/ Program Support Branch. Sept. 1978. 52 pp.
NTIS.
NUREG-0472. Draft Radiological Technical Specifications for PWRs. ONRR/ DOR. Nov. 1978.
104 pp.
Available at NRC.
NUREG-0473. Draft Radiological Technical Specifications for BWRs. ONRR/ DOR. Nov 1978.
80 pp.
Available at NRC.
NUREG-0474. A Technical Updi'e on Pressure Suppression Type Containments in Use in U. S.
Light Water Nuclear Powei Plants. ONRR/ DSS. July 1978. 188 pp.
NTIS.
NUREG-0475. Radiological Environmental Monitoring for Routine Operations of Nuclear Facilities Operated by NRC Licenses. OSD/DSHSS.
Nov. 1978. 32 pp.
NTIS.
NUREG-0478. Metropolitan Siting: A Historical Perspective. ONRR/Programm Support Branch.
Nov. 1978. 52 pp.
NTIS.
Cr., and Nuclear: A Comparison of Generating Base Load Electricity by Region.
ONRR/DSE Dec. 1978. 112 pp.
NTIS.
NUREG-0487. Mark II Lead Plant Program Evaluation Report. ONRR/ DSS. Nov. 1978. 340 pp.
NTIS.
NUREG-0495. Public Meetings on Radiation Safety for Industrial Radiographers. OI&E.
Dec. 1978. 72 pp.
NTIS.
NUREG-0496. Review and Evaluation of the NRC Safety Research Program. ACRS. Dec. 1978.
104 pp.
NTIS.
NUREG-0499. Preliminary Statement on General Policy for Rulemaking to Improve Nuclear Power Plant Licensing. ONRR/DSE. Dec. 1978. 112 pp. NTIS.
NUREG-0499, Supp 1.
General Considerations and Issues of Significance on the Evaluation of Alternative Sites for Nuclear Generating Stations under NEPA. ONRR/D5E. Dec. 1978.
88 pp.
NTIS.
NUREG-0500. A Survey of Policies and Procedures Applicable to the Expression of Differing Professional Opinions. OMPA. July 1978. 66 pp.
Available at NRC.
NUREG-0501. Seabrook Alternative Site Review: NRC Staff Testimony. ONRR/DSE. Dec. 1978.
1004 pp. NTIS.
NUREG-0513. Means for Improving State Participation in the Federal Nuclear Waste Management Programs. OSP. Dec. 1978. 76 pp.
NTISL NUREG-0550. Standard Distribution for Unclassified USNRC Publications OADM/TIDC.
August 1978. 98 pp.
Available at NRC.
Conference Proceedings NUREG/CP-0001. Health Physics Aspects of Radioactivity in Consumer Products. OSD. Sept.
1978. 524 pp. NTIS.
NUREG/CP-0002. Larval Exclusion Systems for Power Plant Cooling Water Intakes Workshop Proceeding ONRR/DSE. 241 pp.
NTIS.
NUREG/CP-0003. Conference Proceedings for State Workshop for Review of NRC's Decommissioning Policy. OSP. Dec. 1978. 364 pp.
NTIS.
1771 012 NUREG/CP-0004, Vol. 1.
Dosimetry Methods for Fuels, Cladding, and Structural Materials.
RES. Aug. 1978. 502 pp.
NTIS.
NUREG/CP-0004, Vol. 2.
487 pp.
NTIS.
NUREG/CP-0004, Vol. 3.
493 pp. NTIS.
CONTRACTOR RFPORTS NUREG-0198. State Perspectives on Energy Facility Siting.
D. W. Stevens, F. L Helminski.
Prepared for USNRC, OSP by Energy ar.d Natural Resources Program, National Gc.vernor's Association. Contract AT(49-24)-0327. April 1978. 81 pp. NTIS.
NUREG-0264-3. Suppression Pool Dynamics: Annual Report - July 1, 1976 -June 30, 1977.
I. Catton, Prepared for USNRC, ORES /DRSR by the University of California at Los Angeles, School of Engineering and Applied Science. Contract AT(48-24)-0342. Feb.
IS78. 240 pp.
NTIS.
NUREG-0354, Vol. 1.
Workshops for State Review of Site Suitability Criteria for High-Level Radioactive Waste Repositories: Analysis and Recommendations. Prepared for OSNRC, OSP by Potomac Research, Inc. Contract NRC-06-77-151.
Feb. 1978. 73 pp. NTIS.
NUREG-03Si, Vol. 2.
234 pp.
NTIS.
NUREG-0373. Dispersion in the Wake of a Model Industrial Complex. Prepared by USNRC, ORES /0RSR by Colorado State University. Contract AT(49-24)-0236. Feb. 1978. 246 pp.
NTIS.
NUREG-0402. Analysis of a Worldwide Strong Motion Data Sampit ; Develop Improved Corre-lation Between Peak Acceleration, Seismic Intensity and other Physical Parameters.
J. R. Murphy and L. J. O'Brien.
Prepared for USNRC, OSD/DSHSS by Computer Sciences Corp. Contract AT(49-24)-0362. Jan. 1978. 112 pp.
NTIS.
NUREG-0406, Vol. 1.
Methods for Prediction of Strong Earthquake Ground Motion: Final Technical Report.
M. D. Trifunac. Prepared for the USNRC, OSD/DSHSS by University of Southern California. Contract AT(49-24)-0364. Feb. 1978. 257 pp.
NTIS.
NUREG-0406, Vol. 2.
267 pp.
NTIS.
NUREG-0409. Iodine Behavior in a PWR Cooling System Following a Postulated Steam Generator Tube Rupture Accident.
A. K. Postma.
P. S. Tam.
Prepared for USNRC, ONRR/DSE by Benton City Technology. Contract AT(49-24)-1086. Jan. 1978. 66 pp. NTIS.
NUREG/CR-0002. Bubble Behavior in LMFBR Core Disruptive Accidents.
C. A. Erdman, and others. Prepared for USNRC, ORES /DRSR oy University of Virginia. Contract AT(49-24)-0326. Feb. 1978. 129 pp.
NTIS.
NUREG/CR-0003. Small-Scale Modeling of Hydrodynamic Forces in Pressure Suppression Systems.
A. A. Sonin and others. Prepared for USNRC, ORES /DRSR by Massachusetts Institute of Technology. Contract NRC-04-77-022. March 1978. 73 pp.
NTIS.
NUREG/CR-0004. SNAKE: A Solid Angle Calculational System.
J. K. Thompson and others.
Prepared for USNRC, ORES /DRSR by Battelle Pacific Northwest Laboratory. FIN 82084.
March 1978. 30 pp.
NTIS.
NUREG/CR-0005. Critique of the Solid Angle heutron Interaction Metnod.
D. R. Oden arid others.
Prepared for 'SNRC, ORES /DRSR by Battelle Pacific U
Northw2st Laboratory. FIN B2085. March 1978. 61 pp.
NTIS.
NUREG/CR-0006. Steady and Transient Natural Convection with Volumetric Energy Sources in a Fluid Layer Bounded from Below by a Segment of a Sphere.
Prepared for USNRC, ORES /DRSR by Ohio State University. Contract AT(49-24)-0149.
March 1978. 107 pp.
NTIS.
1771 013..
NUREG/CR-0007. Measurements and Standards for Nuclear Materials Safeguards: Quarterly Report.
I. L. Barnes, and others. Prepared for USNRC, ORES /DSAFER by National Bureau of Standards. Contract AT(49-25)-9009.
Feb. 1978. 13 pp.
NTIS.
NUREG/CR-0008. Thermal Performance Measurements on Ultimate Heat Sinks - Cooling Ponds.
R. K. Hadlock, and O. B. Abbey. Prepared for USNRC, ORES /DRSR by Battelle Pacific Northwest Laboratories. FIN 82081.
Feb. 1978. 104 pp.
NTIS.
NUREG/CR-0009. Technological Bases for Models of Spray Washout of Airborne Contaminants in Containment Vessels.
A. K. Postma and P. Tam. Prepared for USNRC, ONRR/DSE by Benton City Technology. Contract AT(49-24)-1086.
Nov. 1978. NTIS.
NUREG/CR-0010. Radiation Exposure and Risk Estimates for Inhaled Airborne Radioactive Pollutants Including Hot Particles J. A. Mewhinney. Prepared for USNRC, ORES / SAFER by Inhalation Toxicology Research Inrtitute. Contract No. E(29-2)-1013. March 1978.
151 pp.
NTIS.
NUREG/CR-0011. LMFBR Fuel Analysis, Task A: Oxide Fuel Dynamics - Final Report Oct. 1976 -
Sept. 1977.
V. K. Dhir and others. Prepared for USNRC, ONRR/DPM by University of California, Los Angeles. Contract NRC-03-77-001.
Feb. 1978. 130 pp.
NTIS.
NUREG/CR-0012. LMFBR Fuel Analysis, Task B: Post-Accident Heat Removal - Final Report Oct. 1976 - Sept. 19.
J. Castle and others. Prepared for USNRC, OSD/DSHSS by Uni-versity of California, Los Angeles. Contract NRC-03-77-001.
Feb. 1978. 64 pp.
NTIS.
NUREG/CR-0013. LMFBR Fuel Analysis, Task C: Reliability Aspects of LMFBRs - Final Report Oct. 1976 - Sept. 1977.
W. Bastl. Prepared for USNRC, ONRR/DPM by University of California, Los Angeles. Contract NRC-03-77-002.
Feb. 1978. 64 pp.
NTIS.
NUREG/CR-0014. An Evaluation of the Use of Calorimetry for Shipper-Receiver Measurements of Plutonium.
W. W. Rodenburg. Prepared for USNRC, OSD/DSHSS by the Mound Facility. FIN A10758. June 1978. 91 pp.
NTIS.
NUREG/CR-0015. Analysis of Aerosol Particles Undergoing Gravitational Agulomeration. S. K.
Loyalka. Prepared for USNRC, ORES /DRSR by University of Missouri, Cc e bia. Contract NRC-04-77-030. March 1978. 69 pp.
NTIS.
NUREG/CR-0016. A Parameter Sensitivity Study in the Dynamic Simulation of a Sodium Cooled Breeder Reactor Power Plant.
G. J. Kobb. Prepared for USNRC, ORES /DRSR by University of Arizona. Contract AT(49-24)-0:58.
Feb. 1978. 75 pp.
NTIS.
NUREG/CR-0018. Post-Failure Phenomena in LMFBR TOP Accidents; Final Report Oct.1976
- Sept. 1977.
C. A. Erdman. and others. Prepared for USNRC, ONRR/DPM by University of Virginia. Contract AT(49-24)-0158. Feb. 1976. 73 pp.
NTIS.
NUREG/CR-0019. Value Impact of Vault Automatior in Special Nuclear Material Storage.
W. T. McDuffee. Prepared for USNRC, ORES /DSAFER by Oak Ridge National Laboratory. FIN B02157.
Aug. 1978. NTIS.
NUREG/CR-0020. Virtual Ma.is Effects in Two-Phase Flow.
Pr' pared for USNRC, ORES /DRSR by Rensselaer Polytechnic Institute. Contract No. AT(49 % )-0302.
March 1978. 51 pp.
NTiS.
NUREG/CR-0022. Need for Power: Determination in the State Decisionmaking Process.
Pre-pared for USNRC, OSP by the Center for Natural Areas. Contract NRC-06-78-351.
April 1978. 65 pp.
NTIS.
NUREG/CR-002^
Tw -Phase Flow Phenomena in Nuclear Reactor Technology.
R.
I. Lahey, Jr.
Preparu.or 5NRC, ORES /bRSR by Rensselear Polytechnic Institute. Contract AT(49-24)
Aug. 1978. 96 pp.
NTIS.
1771 014 l
NUREG/CR-0024. Condensation Rates in Steam-Vater Mixing, Quarterly Progress Repor', June-Sept.
1977.
S. G. Bankoff, R. S. Tankin, M. C. Yuen. Prepared for USNRC, ORES /DRSR by Northwestern University. Contract NRC-04-77-052. March 1978. 37 pp.
NTI:i.
I NUREG/CR-0025. Effects of Weathering on Impregneaed Charcoal Performance.
V. R. Deitz.
Prepared for USNRC, ORES /DSAFER by Naval Research Laboratory. FIN 86003. March 1978.
67 pp.
NTIS.
NUREG/CR-0027. Capability for Intrusion Detection at Nuclear Fuel Sites. Prepared for USNRC, ONMSS/DSG by MERADJ0M. FIN 6087. March 1978. 207 pp.
NTIS.
NUREG/CR-0028. Institutional Radioactive Wastes.
R. L. Anderson, T. J. Beck, L. R. Cooley, C. S. Straus. Prepared for USNRC, ORES /DSAFER by University of Maryland. Contract NRC-04-76-344. March 1978. 209 pp.
NTIS.
NUREG/CR-0030. PARC (Plutonium Accident Resistant Container): Program Research, Design and Development. Prepared for USNRC, ORES /DSAFER by Sandia Laboratory. FIN A1059. Aug.
1978. NTIS.
NUREG/CR-0031. Evaluation of Fission-Product Afterheat.
B. I. Spinard. Prepared for USNRC, ORES /DRSR by Oregon State University. Contract AT(49-24)-0157. March 1978. 92 pp.
NTIS.
NUREG/CR-0032. Radioactive Waste Managemen' Study Task 1: Review of Waste Projection Models - Final Report.
D. Goellner, D. Vogt, and G. Kr.iazecz. Prepared for USNRC, ONMSS/DFC by Teknekron, Inc. Contract NRC-02-77-160. Aug. 1978. 72 pp.
NTIS.
NUREG/CR-0033. Procedures for Rounding M(asurement Results in Nuclear Materials Control and Accounting.
R. J. Brouns, F. P. Roberts. Prepared for USNRC, OSD/DSHSS by Battelle Pacific Northwest Laboratory. Contract EY-76-C-06-1830.
March 1978. 16 pp.
NTIS.
NUREG/CR-0035. Two-Phase Flow Phenomena in Nuclear Reactor Technology Quarterly Progress Report, Sept. - Nov. 1977.
R. T. Lahey. Prepared for USNRC, ORES /DRSR by the Rensselaer Polytechnic Institute. Contract AT(49-24)-0301. May 1978. 87 pp.
NTIS.
NUREG/CR-0036. Radioactive Gaseous Effluent Source Terms for ?ostulated Accident Conditions in LWRs. Prepared for USNRC, ONRR/DSE by Allied Chemical Corporation (INEL). FIN A6160. Oct. 1978. 116 pp.
NTIS.
i NUREG/CR-0037. Residual Stresses at Weld Repairs in Pressure Vessels; Quarterly Report, I
Sept. - Dec. 1977. Prepared for USNRC, ORES /DRSR by Battelle Columbus Laboratories.
Contract AT(49-24)-0292. April 1978. 33 pp.
NTIS.
NUREG/CR-0038. LWR Pressure Vessel Irradiation Surveillancc Dosimetry - Quarterly Reoort -
July - Sept. 1977.
G. L. Guthrie, and others. t'repared 'or USNRC, ORES /DRSR b;
'x Hanford Engineering Development Laboratory. Contract EV-76-C-14-2170.
Dec. 1978. 156 pp.
NTIS.
NUREG/CR-0039. Studies of Dynamic Loads in Pressure Suppression Containment; Quarterly Report, Jul - Sept. 1977.
C. K. Chan and others. Prepared for USNRC, ORES /DRSR by University of California at Los Angeles. Contract AT(49-24)-0342. March 1978. 55 pp.
NTIS.
NUREG/CR-0040. An Evaluation of Cost Estimates of Physical Security Systems for Recycled Nuclear Fuel.
J. M. Hockeet, and others. Prepm ed for USNRC, ORES /DSAFER by the Mitre Corprration. Contract NRC-04-77-114.
May 1978. 173 pp.
NTIS.
NUREG/CR-0042. Career Fields for Inspection and Enfercement Personnel.
H. J. Bartley, and others. Prepared for USNRC, OI&E by General Research Corporation. Contract NRC-05-77-142.
Dec. 1978. 104 pp.
NTIS.
'.ssessment of Current NRC/IE Professional Training Program and Recom-mendations for Improvement.
H. J. Bartley and others. Prepared for USNRC, OI&E by the General Research Corporation. Contract NRC 05-77-142.
June 1978. 44 pp.
NTIS..
1771 015
NUREG/CR-0046, Vcl. 1.
Revise Qualifica+ ions Manual for Inspection and En-forcement Personnel.
H..
.d others. Prepared for USNRC, 0I&E by the General Research Corpor.1 tic t NRC-05-77-142. Dec. 1978 68 pp.
NTIS.
NUREG/CR-0046, Vol. 2.
Dec. 1978.
NTIS.
NUREG/CR-0050. Seismicity and Tectonic Relationships of the Nemahi Uplift in Oklahoma - Inte-im Report K. V. Luza, and others. Prepared for USNRC, ORES /DRSR by the University of Oklahoma. Contract AT(49-24)-0134. May 1978. 77 pp.
NTIS.
NUREG/CR-0051. Vol. 1.
Evaluation of Insnection and Enforcement Programs of Other Regulatory, Safety, and Professional Organizations, Phase I, Volume I.
S. R. Thompson, D. M. Speaker, and S. Cohen. Prepared for USNRC, 01&E by the Teknekron, Inc. Contract NRC-05-77-064.
May 1978. 151 pp.
NTIS.
NUREG/CR-0051. Voi. 2.
May 1978. 205 pp.
NTIS.
NUREG/CR-0052. Evaluation of Irepection and Enforcement Programs of Other Regulatory, Safety and Professiona! Organizations, Phase II.
Thompson, S. R., Speaker, D. M. and Cohen, S.
Prepared for USNRC, OI&E by the Teknekron, Inc. Contract NRC-05-77-064. May 1978.
132 pp.
NTIS.
NUREG/'"t-0053. Regional Tectonics and Seismicity of Eastern Nebraska-Interim Report No. 1.
R. R. Surchett. Prepared for USNRC, ORES /DRSR by the University of Nebraska. Contract AT(49-24)-0315. May 1978. 23 pp.
NTIS.
NUREG/CR-0055, Volume 1.
Verification of Subsurface Conditions at Selected " Rock" Accelerograph Stations in California, Volume 1.
Prepared for USNRC, ORES /DSAFER by the Shannon a Wilson, Inc. and Agbabian Associates. Contract AT(49-24)-0200. June 1978.
.38 pp.
NTIS.
NUREG/CR-0057. Critical Experiments, Measurements, and Analyses to Establish a track Arrest Methodology for Nuclear Pressure Vessel Steels. Eleventh Quarterly Progress Report.
G. T. Hahn and others. Prepared for USNRC, ORES /DRSR by the Battelle Columbus Laboratories. Contract AT(49-24)-0293. June 1978. 230 pp.
NTIS.
NUREG/CR-0061. Preparation of Working Calibration and Test Materials:
Plutonium 0xide. Prepared for USNRC, ORES /DRSR by Los Alamos Scientific LaboratoS.
Oct. 1978. NTIS.
NUREG/CR-0062. Nuclear Reactor Safety - Quarterly Progress Report.
Prepared for USNRC, ORES /RSR by Los Alamos Scientific Laboratory. Contract W-7405-ENG-36.
June 1978. NTIS.
TRAC-Pl. An Advanced Best Estimate Computer Program for PWR LOCA Analysis. Prepared for USNRC, ORES /RSR by Los Alamos Scientific Laboratory. Contract W-7405-ENG-36.
Aug. 1978. NTIS.
NUREG/CR-0064. One-Dimensional Calculation of Flow Branching Using the Method of Charac-teristic:. Prepared for USNRC, ORES /DRSR by Los Alamos Scientific Laboratory. Contract W-7405-ENG-36.
Aug. 1978. NTIS.
NUREG/CR-0066. Measured Air Flow Rate Through Micro-Orifices and Flow Prediction Capabil-ities.
F. L. Sutler, T J. Bander, J. Mishima, and L. C. Schwendiman. Prepared for USNRC, ORES /DSAFER by Battelle Pacific Northwest Laboratory. Contract EY-76-C-06-1830.
Sept. 1978. NTIS.
NUREG/CR-0067. Studies of Dynamic Loads in Pressure Suppression Containment.
C. Chan, V. K. Dhir, and C. Y. Liu. Prepared for USNRC, ORES /DRSR by the University of California. Contract AT(49-24)-0342. May 1978. 78 pp.
NTIS.
1771 016 l
NUREG/CR-0070. Testing of Brush-Type Polonium-210 Static Eliminators for Source Integrity.
Prepared for USHRC, OSD/ DES by Oak Ridge National Laboratory. Contract W-74DS-ENG-26.
Sept. 1978. NTIS.
NUREG/CR-0071. Dynamic Analysis of Normal Shock and Vibration of Radioactive Material Shipping Packages. Prepared for USNRC, ORES /05AFER by Hanford Engineering Development Laboratory. FIN B2263. May 1978. 39 pp.
NTIS.
NUREG/CR-0072. Regional Boundaries Study.
S. Zavatsky, and others. Prepared for USNRC, OI&E by the Systems Architects, Inc. Contract NRC-05-77-195. May 1978. 220 pp.
NTIS.
NUREG/CR-0073. Critical Separation Between Subcritical Clusters of 4.29 Wt.% 235U Enriched UO2 Rods in Water With Fixed Neutron Poisons.
S. R. Bierman, B. M. Durst, and M. D. Clayton. Prepared for USNRC, ORES /DSAFER by the Battelle Pacific Northwest Laboratories. FIN 82094. May 1978. NTIS.
NUREG/CR-0074. Data from Selected Accelerograph Stations at Wilshire Boulevard, Century City and Ventura Boulevard, Los Angeles, California. Prepared for USNRC, ORES /DSAFER by the Shannon & Wilson, Inc. and Agbabian Associates. Contract AT(49-24)-0200. June 1978. 307 pp.
NTIS.
~
NUREG/CR-0375. Accidental Vapor Phase Explosions on Transportation Routes Near Nuclear Power Plants; Final Report, Jan. - April 1977.
T. V. Eichler, and H. S. Napadensky.
Prepared for the USNRC by OSD/ DES by the ITT Research Institute. FIN A20057. 73 pp.
Jan. 1978. NTIS.
NUREG/CR-0076. Annual Progress Report Evaluation of Materials for CR8RP Core Retention.
D. G. Swanson, and others. Prepared for USNRC, ONRR/DPM by the Aerospace Corporation.
Contract AT(49-24)-0292. May 1978. 52 pp.
NTIS.
NUREG/CR-0077. The Effects of Nuclear Power Plant Operations on Populations of Boring and Fouling Organisms.
K. E. Hoagland, L. Crockett, and M. Rochester. Prepared for USNRC, ORES /DSAFER by the Lehigh University. Contract AT(49-24)-0347. May 1978. 52 pp.
NTIS.
NUREG/CR-0078. Residual Stresses at Weld Repairs in Pressure Vessels - Second Quarterly Progress Report.
E. F. Rybicki, and R. B. Stonesifer. Prepared for USNRC, ORES /DRSR by the Battelle Columbus Laboratories. Contract AT(49-24)-0293. May 1978. 43 pp.
NTIS.
NUREG/CR-0079. Critical Experiments, Measurements, and Analyses to Establish a Crack Arrest Methodology for Nuclear Pressure Vessel Steels; Quarterly Report. Jan. - March 1977.
G. T. Hahn and others. Prepared for the USNRC, ORES /DRSR by the Battelle Columbus Laboratories. Contract AT(49-24)-0293. June 1978. 115 p.
NTIS.
NUREG/CR-0080. Critical Experiments, Measurements, and Analyses to establish a Crack Arrest Methodology for Nuclear Pressure Vessel Steels; Quarterly Report, April - June 1977.
G. T. Hahn and others. Prepared for the USNRC, ORES /DRSR by the Battelle Columbus Laboratories. Contract AT(49-24)-0293. June 1978. 62 pp.
NTIS.
NUREG/CR-0081. New England Seismotectonic Study Activities During Fiscal Year 1977.
P. J. Barosh. Prepared for USNRC, ORES /DRSR by Boston College. Contract AT(49-24)-0291.
May 1978. 147 pp.
NTIS.
NUREG/CR-0082. The Pollution History of the Savannah River Estuary.
E. D. Goldberg and others. Prepared for USNRC, ORES /DSAFER by the Scripps Institution of Oceanography.
Contract AT(49-24)-036. June 1978. 41 pp.
NTIS.
NUREG/CR- 0084. Aerosol Measurements and Modelling for Fast Reactor Safety.
J. Gieseke.
Prepared for USNRC, ORES /DRSR by the Battelle Columbus Laboratories. Contract NRC-04-76-293-07. June 1978. 46 pp.
NTIS.
O 1771 017
NUREG/CR-0085. Evaluating Strengths and Ductility of Irradiated Zircaloy. Prepared for USNRC, ORES /DRSR by the Battelle Columbus Laboratories. Contract AT(49-24)-0293. June 1978. 57 pp.
NTIS.
NUREG/CR-0087. Considerations for Sampling Nuclear Materials for SNM Accounfing Measurements.
R. J. Brouns, F. P. Roberts, and U. L. Upson. Prepared for USNRC, OSD/DSHSS by the Battelle Pacific Northwest Laboratories. Contract E-4-76-C-06-1830.
May 1978. 44 pp.
NTIS.
NUREG/CR-0088. Fission-Gas Release From Irradiated PWR Fuel During Simulated PCM-Type Accidents. Prepared for USNRC, ORES /DRSR by Argonne National Laboratory. FIN A2019.
Aug. 1978. NTIS.
NUREG/CR-0094. PWR Blowdown Heat Transfer Separate Effects Program-Thermal-Hydraulic Test Facility Experimental Data Report for Test 1665.
V. D. Clemons, M. D. White, and R. A. Hedrick. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0125. Aug. 1978. NTIS.
NUREG/CR-0096. Reference Critical Experiments, Progress Report for Jan. -March 1978.
I. Oh, D. Pecara, and R. E. Rothe. Prepared for USNRC, ORES /DRSR by Rockwell Inter-national. FIN A1036. 28 pp. May 1978. NTIS.
NUREG/CR-0098. Development of Criteria for Seismic Review of Selected Nuclear Power Plants.
W. H. Newmark and W. J. Hall. Prepared for USNRC, ONRR/ DOR bs the Nathan M. Newmark Consulting Engineering Services. Contract AT(49-24)-0116.
iune 1978. 57 pp.
NTIS.
NUREG/CR-0099. The Evaluation of Road-Transit Physical Protection Systems.
R. J. Gallagher and others. Prepared for USf.RC, ORES /DSAFER by Sandia Laboratories. Contract 60 78-096.
July 1978. 29 pp.
NTIS.
NUREG/CR-0100. Estimates of LLEA Officer Availability.
K. P. Berkbigler. Prepared for USNRC, ORES /DSAFER by Sandia Laboratories. Contract 60-78-096.
July 1978. 14 pp.
NTIS.
NUREG/CR-0101. A Tactical Game for Use in the Development and Evaluation of Road Transit Physical Protection Systems.
S. C. Keeton and R. J. Gallagher. Prepared for USNRC, ONES/DSAFER by Sandia Laboratories.
Con' tract 60-78-096. July 1978. 14 pp.
NTIS.
NUREG/CR-0104. Pro'ect Description ORNL BWR Blowdown Heat Transfer Separate-Effects Program-The rma, ydraulic Test Facility. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0125. Dec. 1978. NTIS.
NUREG/CR-0105. PWR Blowdown Heat Transfer Separate-Effects Program Data Evaluation Report -
Heat Transfer for Thermal-Hydraulic Test Facility Test Series 100.
W. G. Craddick, and others. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0235.
Sept. 1978. NTIS.
NUREG/CR-0106. Heavy Section Steel Technology Program Quarterly Program Report for Jan. -
March 1978.
G. D. Whitman and R. H. Bryan. Prepared for USNRC, ORES / DRSR by Oak Ridge National Laboratory. FIN B0119. Sept. 1978. NTIS.
NUREG/CR-0108. PWR Blowdown Heat Transfer Separate-Effects Program - Hydraulic Test Facil-ity Experimental Data Report for Test 167R.
V. D. Clemmons, R. A. Hedrick, and M. D. White. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN BOI25. Sept. 1978. NTIS.
NUREG/CR-0109. PWR Blowdown Heat Transfer Separate-Effects Program Experimental Data Report Test 152.
V. D. Clemons, R. A. Hedrick, and M. D. White. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0125.
Aug. 1978. NTIS.
NUREG/CR-0111. Elastodynamic Analysis of a Propagating Finite Crack. Prepared for USNRC, ORES /DRSR by Battelle Columbus Laboratories. Contract AT(49-24)-0293. June 1978. 84 pp.
NTIS.
1771 018
- 1 5-
NUREG/CR-0112. Evaluation of Fission-Product Afterheat.
B. I. Spinard. Prepared for the USNRC, ORES /DRSR by the Oregon State University. Contract AT(49-24)-0157. June 1978.
90 pp.
NTIS.
NUREG/CR-0115. Ef fects of Energy Losses of Arbitrary Magnitude on Fuel Quality, Vapor Density, and Bubble Diamter in an Idealized Expansio, of UO and Na Mixtures. Prepared 2
for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0232. Aug. 1978. NTIS.
NUREG/CR-0117 Breeder Reactor Aerosol Rele se and Transport Program Quaterly Progress Report 'or Jan. - March 1978. Prpeared for USNRC, ORES /DRSR by Oak Ridge National Laboratary. FIN B0121. Oct. 1978. NTIS.
NUREG/CR-0119. RELAP 4 Models of the Thermal Hydraulic Test Facility. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0125. Sept. 1978. NTIS.
NUREG/CR-0120. Effect of Energy Density on Aerosol Yield and Primary Particle Sizes Pro-duced by the Capacitor Discharge Vaporization (CDV) of U0. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0232. $ept. 1978. NTIS.
NUREG/CR-0121. Progress on Lower Plenum Voiding; Quarterly Report Jan. - March 1978.
C. J.
Crowley, and P. H. Roth. Prepared for USNRC, ORES /DRSR by Creare, Inc. Contract NRC-04-75-162. July 1978. 86 pp.
NTIS.
NUREG/CR-0122. Steam Explosion Triggering Phenomena: Stainless Steel and Corium-E Simu-lants Studied with Floodable ARC Melting Appar d s.
Prepared for USNRC, ORES /DRSR by Sandia Laboratory. FIN A1030. Aug. 1978. NTIS.
NUREG/CR-0123. Program to Develop Acoustic Emission-Flaw Relationship for Inservice Moni-toring of Nuclear Pressure Vessels, Annual Report No. 2, July -0ct. 197/.
H. Hutton, E. B. Schwenk, and R. J. Kurtz. Prepared for the USNRC, ORES /DRSR by the Battelle Pacific Northwest Laboratories. Contract EY-76-C-06-1930.
June 1978. 28 pp.
NTIS.
NUREG/CR-0125. Characteristics of Waete and Soils Which Effect Transport of Radionuclides Through the Soil and Their Relationship to Waste Management.
E. B. Fowler, W. Polzer, and E. H. Essington. Prepared for USNRC, ORES /DSAFER by Los Alamos Scientific Laboratory. FIN A7040-8. Oct. 1978. NTIS.
NUREG/CR-0127. LWR Pressure Vessel Irradiation Dosimetry Program. Oct. - Dec. 1977.
Prepared for USNRC, ORES /DRSR By Westinghouse Hanford Lab.
Contract EY-76-14-20170.
Sept. 1978. NTIS.
NUREG/CR-0128. Shock and Vibration Environments for a large Shipping Container During Truck Transport (Part II).
C. F. Magnuson. Prepared for USNRC, ORES / 0$AFER by Sandia Laboratory. FIN 2049-6. Aug. 1978. NTIS.
NUREG/CR-0130, Vol. 1.
Technology, Safety and Costs of Decommissioning a Reference Pres-surized Water Reactor Power Station. Volume 1.
Main Report.
R. I. Smith, G. J. Konzek, and W. E. Kennedy, Jr.
Prepared for USNRC, OSD/ DES by the Battelle Pacific Northwest Laboratory. Contract EY-76-C-06-1830.
June 1978. 321 pp.
NTIS.
NUREG/CR-0130, Vol. 2.
June 1978. 468 pp.
NTIS.
NUREG/CR-0131. Decommissioning of Nuclear Facilities: A Bibliography. Prepared for USNRC, OSD/ DES by Battelle Pacific Northwest Laboratory. FIN B2125. Oct. 1978. NTIS.
NUREG/CR-0132. Stress Analysis of Cylindrical Pressure Vessels with Closely Spaced Nozzles by the Finite-Element Method.
F. K. W. Tso, and R. A. Weed. Prepared for USNRC, ORES /
DRSR t Oak Ridge National Laboratory. FIN B0123. Aug. 1978. NTIS.
NUREG/CR-0136. Modeling of Crack Growth in Oxidized Zircaloy Cladding During Thermal-Shock Conditions. Prepared for USNRC, ORES /DRSR by Argonne National Laboratory. FIN A20I7.
Sept. 1978. NTIS.
O 177.1 019
.ie.
NUREG/CR-0138. Effect of Container Venting on the Rate of LWR meltdown Accidents.
P. Cybuhkis, R. Wooten, and R. J. Denning. Prepared for the USNRC, ORES (Proba-bilistic Analysis) by the Battelle Columbus Laboratory. June 1978. Contract NRC-04-76-293-08.
44 pp.
NTIS.
NUREG/CR-0140. In-Plant Source Term Measurements at Fort Calhoun Station-Unit 1.
N. C.
Dyer and others. Prepared for USNRC, ORES /DSAFER by EG&G Idaho. FIN A6075. Aug.
1978. 202 pp.
NTIS.
NUREG/CR-0142. The Use of Evaporators to Treat Radioactive Liquids in Light Water Cooled Nuclear Reactor Power Plants.
A. Kibbey and H. Godbee. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0272. Oct. 1978. NTIS.
NUREG/CR-0143. The Use of Ion Exchange to Treat Radioactive Liquids in Light Water Cooled Nuclear Reactor Power Plants.
W. Clark. Prepared for USNRC, ORES / DSAFER by Oak Ridge National Laboratory. FIN B0271.
Aug. 1978. NTIS.
NUREG/CR-0144. A Review of Solid Radioactive Waste Practices in Light-Water-Cooled Nuclear Power Plants. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN No.
B0171. Nov. 1978. NTIS.
NUREG/CR-0147. Steam-Water Mixing and Systems Hydrodynamics Program Quarterly Progress Report May 1978.
R. Cudnik and others. Prepared for USNRC, ORES /DRSR by the Battelle Columbus Laboratory. Contract NRC-04-76-293-04.
June 1978. 149 pp.
NTIS.
NUREG/CR-0148. Physics of Reactor Safety. Prepared for USNRC, ORES / DRSR by Argonne National Laboratory. FIN A2015, A2018, A2045.
Aug. 1978. NTIS.
NUREG/CR-0149. INSITE Information System Data Report.
C. Huber. Prepared for USNRC, OSD by Argonne National Laboratory. FIN A2012-8. Nov. 1978. NTIS NUREG/CR-0150. Estimates of Internal Dose Equivalent to 22 Target Organs for Radionuclides Occuring in Routine Release from Nuclear Fuel Cycle Facilities.
G. G. Killough and others. Prepared for USNRC, ORES /DSAFER by Oak Ridge National Lacoratory. FIN B0188.
Aug. 1978. NTIS.
NUREG/CR-0152. Development and Verification of Fire Tests for Cable Systems and System Components.
L. Przbyla and W. J. Christian. Prepared for USNRC, ONRR/ DRSR by the Underwriters Laboratories, Inc. Contract NRC-04-77-122. July 1978. 44 pp.
NTIS.
NUREG/CR-0153. Insights into Improving the Efficacy of Nuclear Power Plant Inspection Procedures Based Upon Risk Analysis. Prepared for USNRC, ORES (Probabilistic Analysis) by Battelle Columbus Laboratory. Contract NRC-04-76-293-09.
July 1978. 32 pp.
NTIS.
NUREG/CR-0154. LOCA Andivsis Annual Report Fiscal Year 1977.
M. Berman and others.
Pre-pared for the USNRC, ONRR/ DSS by Sandia Laboratory. Contract AT(29-1)-789. June 1978.
200 pp.
NTIS.
NUREG/CR-0157. Transuranium Element Transport in Agricultural Systems (Soil to Food Chain Transfer of Nuclear Fuel Cycle Radionuclides). Prepared for UShRC, ORES /DSAFER by the University of California, Los Angeles. FIN B3027-6. June 1978. 41 pp.
NTIS.
NUREG/CR-0160. Evaluation of Fission-Product Afterheat.
B. I. Spinrad. Prepared for USNRC, ORES /DRSR by Oregon State University. Contract AT(49-24)-0157. Aug. 1978. 61 pp.
NTIS.
NUREG-0161. Dynamic Analysis to Establish Normal Shock and Vibration Environments Exper-ience by Radioactive Materials Packages.
S. R. Fields, and S. J. Mech. Prepared for USNRC, ORES /DSAFER by danford Engineering Development Laboratory. FIN B2263. Dec.
1978. 32 pp.
NTIS.
NUREG/CR-0162. Delayed Beta and Gamma Ray Production Due to Thermal Neutron Fission of 2350, Special Distributions for Times After Fission Between 2 and 14,000 seconds.
Tabular and Graphical Data.
J.
K. Dickens and others. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0095.
Aug. 1978. NTIS.
1771 020
NUREG/CR-0165. A Value-Impact Assessment of Alternate Containment Concepts.
D. D. Carlson, and J. W. Hickman. Prepared for USNRC, ORES /DRSR by Sandia Laboratory. FIN A1027.
Aug. 1978. NTIS.
5"JREG/CR-0166. Sustained Holten Steel / Concrete Interactions Test.
D. A. Powers. Prepared for USNRC, ORES /DRSR by Sandia Laboratory. FIN A1019. Nov. 1978. NTIS.
NUREG/CR-0167. A Survey of Existing Momentum Exchange Models in Two-Phase F ow for Use in the SIMMER Fast Reactor Safety Analysis Code.
S. W. Eisenhower. Prepared for USNRC, ORES /DRSR by Sandia Laboratory. FIN A1016. Aug. 1978. NTIS.
NUREG/CR-0169, Vol. V.
LOFT Experimental Measurements Uncertainty Analyses. LOFT External Accelerometer Ur. certainty Analysis.
G. L. Biladeau, and others. Prepared for USNRC, ORES /DRSR by EG&G Idaho, Inc. FIN A6043. Oct. 1978. NTIS.
NUREG/CR-0169, Vol. VII. LOFT Self-Powered Neutron Detector Uncertainty Analysis.
C. D. Lassahn. Aug. 1978. NTIS.
NUREG/CR-0169, Vol. VIII, LOFT Traversing In-Core Probe Uncertainty Analysis.
C. D.
Lassahn, and others. Aug. 1978. NTIS.
NUREG/CR-0169, Vol. IX.
LOFT Experimental Measurements Uncertainty Analyses, LUFT Strain Gage Uncertainty Analysis.
G. L. Biladeau. June 1978. NTIS.
NUREG/CR-0169, Vol. XIV. LOFT Drag Disc-Turbine Transducer Uncertainty Analysis.
S.
Silverman.
Nov. 1978. NTIS.
NUREG/CR-0169, Vol. XV.
LOFT Primary Coolant Pump Speed Measurement Uncertainty Analysis.
L. 3. Goodrich, Jr.
April 1978. NTIS.
NUREG/CR-0178. PWR Blowdown Heat Transfer Separate-Effects Program-Thermal-Hydraulic Test Facility Experimental Data Report for Test 168R. V. D. Clemons, R. A. Hedrick, and M. D. White. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0125. July 1978. NTIS.
NUREG/CR-0181. Barrier Penetration Database.
A. Fainberg and A. M. Bieber, Jr.
Prepared for USNRC, ONRR/ DOR by Brookhaven National Laboratory. Contract E-1-76-C-02-0016.
July 1978. 50 pp.
NTIS.
NUREG/CR-0181, Rev. 1.
Dec. 1978. 88 pp.
NTIS.
NUREG/CR-0182. Summary Data for US Commercial Nuclear Power Plants in U.S.
F. A.
Heddleson. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. Contract 40-551-75.
Aug. 1978. NTIS.
NUREG/CR-0J88. Breeder Reactor Aerosol Release and Transport Program. Quarterly Progress Report July - Sept. 1977.
T. S. Kress. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. Contract 40-551-75.
Aug. 1978. NTIS.
NUREG/CR-0192. Creepdown of Zircaloy Fuel Cladding Initial iests.
D. O. hobson. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. "ontract 40-551-75. Aug. 1978.
NTIS.
NUREG/CR-0293. Reporting the Relap 4/ MOD 5 Interface to ORINE.
- 5. B. Cliff. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. Contract 40-551-75.
Aug. 1978.
NTIS.
NUREG/CR-0195. Post-CHF Heat Transfer During Steady State and Transient Conditions.
K. K.
Fung. Prepared for USNRC, ORES /DRSR by Argonne National Laboratory. FIN A2014.
Nov.
1978. NTIS.
NUREG/CR-0197. Final Progress Report Fission Product BETA and GAMMA Energy Release Program Report for January to May 1978.
J. A. Dickens and others. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0095. Aug. 1978. NTIS.
1771 021 NUREG/CR-0199. Radiological Assessment of Steam Generator Removal and Replacement.
Pre-pared for USNRC, ONRR/ DOR by Battelle Columbus Laboratory. FIN 82152. Oct. 1978. 48 pp.
NTIS.
NUREG/CR-0202. GRASS-SST: A Comprehensive, Mechanistic Program for the Prediction of Fission-Gas Behavior in U0,-Based Fuel During Steady-State and Transient Conditions.
J. Rest. Prepared for USNRC, OSD/ DES by Argonne National Laboratory. FIN A2016.
Nov.
1978. NTIS.
NUREG/CR-0205. Sodium 0xide Aerosol Study - NSPP Runs 202-105, Data Record Report.
R. E.
Adamr and others. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory.
Contract 40-551-75.
Aug. 1978. NTIS.
NUREG/CR-0206. Heavy-Section Steel Technology Program Quarterly Progress Report for July -
Sept. 1977.
G. D. Whitman and R. H. Bryan. Prepared for USNRC, ORES / DRSR by Oak Ridge National Laboratory. Contract 40-551-75.
Aug. 1978. NTIS.
NUREG/CR-0207. Light Water Reactor Safety Research Program Quarterly Report April - June 1977. Prepared for USNRC, ORES /DRSR by Sandia Laboratories. Contract AT(29-1)-789.
July 1978. 48 pp.
NTIS.
NUREG/CR-0210. Benchmark Experiments to Test Plutonium and Stainless Steel Cross Sections.
U. P. Jenquin and S. R. Bierman. Prepared by USNRC, ORES /DSAFER by Battelle Pacific Northwest Laboratories. Contract NPC-60-78-062.
July 1978. 66 pp.
NTIS.
NUREG/CR-0211. Postirradiation Examination Data Report for Gap Conductance Test Series Test GC 2-2.
Prepared for USNRC, ORES /DR$R by the Idaho National Engineering Laboratory.
Contract EY-76-C-07-1570.
July 1978. 225 pp.
NTIS.
NUREG/CR-0214. HTGR Safety: Review of Current Issues and Bibliography of Literature (1960-1977).
J. R. Buchanan ar.d G. W.
Keilholtz. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0176. Aug. 1978. NTIS.
NUREG/CR-0215. Estimates of Potential Radiation Doses from Wristwatches Contaiaing Tritium Gas.
L. M. McDowell and F. R. O'Donnell. Prepared for USNRC, OSD/ DES by Oak Ridge National Laboratory. FIN B0144-8. Aug. 1978. NTIS.
NUREG/CR-0217. Report of a Study of the Licensee Contractor and Vendor Inspection Program (LCVIP).
A. L. Wood, H. J. Spiro, B. A. Bancroft, and F. Rueter. Prepared for USNRC, OIE by TRW.
Contract NRC-05-77-053.
Aug. 1978. NTIS.
NUREG/CR-0219. Numerical Study of Apparatus Scaling in a Pressurized Water Reactor: A Progress Summary for March - May 1978.
B. J. Daly. Prepared for USNRC, ORES /DRSR by Los Alamos Scientific Laboratory. FIN A7027-8.
Nov. 1978. NTIS.
NUREG/CR-0221. A Model for Condensation Oscillations in a Vertical Pipe Discharging Steam into a Subcooled Water Pool.
W. Kowalchuk and A. Sonin. Prepared for USNRC, ORES /DRSR by the Massachusetts Institute of Technology. Contract NRC-04-77-022.
July 1978.
NTIS.
NUREG/CR-0223. Analysis of Populations of Boring and Fouling Organisms in the Vicinity of the Oyster Creek Nuclear Generating Station.
K. E. Hoagland, L. Crocket, and M. Rochester.
Prepared for the USNRC, ORES /DSAFER by Lehigh University. Contract AT(49-2)-0347.
Aug. 1978. 54 pp.
NTIS.
NUREG/CR-0224. Multiphase Transients with Coolant and Core Materials in LMFBR Core Dis-ruptive Accident Energetics Evaluations.
T. G. Theofanous, with contributions from J.
Beecher, et al.
Prepared for USNRC, ONRR/DPM by Purdue University. Contract NRC-03-76-181. June 1978. 301 pp.
NTIS.
NUREG/CR-0225. Multirod Burst Test Program Progress Report for Jan. - March 1978.
R. H.
Chapman. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0120.
Sept. 1978. NTIS.
)l
\\
i '
NUREG/CR-0228. Physical Protection of Nuclear Material in Transit; Quarterly Report Oct. -
Dec. 1977.
R. L. Rinne. Prepared for USNRC, ORES /DSAFER by Sandia Laboratory.
'IN A1173. Sept. 1978. NTIS.
NUREG/CR-0232. Heavy Section Steel Technology Program Quarterly Progress Report for Oct. -
Dec. 1977. Prepared for USNRC, ORES /DRSR. Contract 40-551-75. July 1978. 86 pp.
NTIS.
NUREG/CR-0233. Two-Phase Flow Phenomena in Nuclear Reactor Technology.
R. T. Lahey, Jr.
Prepared for USNRC, ORES /DRSR by Renssalear Polytechnic Institute. Contract AT(49-24)-0301. Aug. 1978. 70 pp.
NTIS.
NUREG/CR-0235. Properties of Reactor Materials at Constant True Strain Rates, Progress Report.
L. King. Prepared for USNRC, ORES /DRSR by the University of Florida. Contract NRC-04-77-039.
Sept. 1978. NTIS.
NUREG/CR-0238. PWR Cooling - Mismatch Test Series Test PCM Postirradiation Examination.
Prepared for USNRC ORES /DRSR by EG&G, Idaho, Inc. Contract EY-76-C-07-1570.
Aug.
1978. NTIS, NUREG/CR-0239. Semiscale M00-3 Test Program and System Description.
M. L. Patton. Prepared for USNRC ORES /DRSR by EG&G, Idaho, Inc. Contract EY-76-C-07-1570.
Aug. 1978. NTIS.
NUREG/CR-0240. A Single-Phase Pump Model for Analysis of L"FBR Heat Transport Systems.
I.
K. Madni and E. Cazzoli. Prepared for USNRC, ORES /DRSR by Brookhaven National Labora-tory. FIN A3025.
Aug. 1978. NTIS.
NUREG/CR-0241. An Integrated Regional Approach to Regulating Energy Facility Siting.
M. Hoffman. Prepared for USNRC, ORES /DSAFER by Massachusetts Energy Facilities Siting Council. Contract NRC-04-77-175.
Sept. 1978. NTIS.
NUREG/CR-0242. Advanced Two-Phase Instrumentation Program Quarterly Progress Report for Oct. - Dec. 1977.
P. A. Jallouk ar.d J. E. Hardy. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0401. Sept. 1978. NTIS.
NUREG/CR-0243. Quarterly Progress Report on Blowdown Heat Transfer Separate-Effects Program for April - June 1978.
B. G. Thomas and others. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0125. Sept. 1978. NTIS.
NUREG/CR-0244. BRENDA, A Dynamic Simulator for a Sodium-Cooled Fast Reactor Power Plant.
D. L. Hetrick and G. W. Sowers. Prepared for USNRC, ORES /DR$R by University of Arizona.
Contract AT(49-24)-0250. Aug. 1978. 88 pp.
NTIS.
NUREG/CR-0246. LOFT Measurement Requirements Document (MRD-3).
J. D. Burtt. Prepared for USNRC, ORES /DRSR by EG&G Idaho, Inc. Contract EY-76-C-07-1570.
Aug. 1978. NTIS.
NUREG/CR-0247. LOFT System and Test Descriptior: (5.5 Foot Nuclear Core 1 (LOCES). Prepare'l for USNRC, ORES /DRSR by EG&G Idaho, Inc. Contract EY-76-C-07-1570.
Aug. 1978. NTIS.
NUREG/CR-0248. Fission Product Transport Analysis. Prpeared for USNRC, ORES /DRSR by Battelle Columbus Laboratory. Contract NRC-04-76-293-02.
Sept. 1978. NTIS.
NUREG/CR-0250. Regional Econometric Model for Forecasting Electricity Demand by Section and State. Prepared for USNRC, ORES /DRSR by Battelle Columbus Laboratory. Contract NRC-04-76-2f3-02.
Sept. 1978. NTIS.
Experiment Data Report for Semiscale M00-1 Test S-06-3 (LOFT Counterpart Test). Prepared for 95NRC, ORES /DRSR by EG&G Idaho, Inc. Contract EY-76-C-07-1570.
Aug. 1978. NTIS.
NUREG/CR-0252. Quarterly Technical Progress Report on Water Reactor Safety Program Spon-sored by NRC, Division of Reactor Safety Research. Prepared for USNRC, ORES /DRSR by EG&G Idaho, Inc.
Contract EY-76-C-07-1570.
Aug. 1978. NTIS.
O 1771 023 NUREG/CR-0253. Postirradiation Exam Data Report for Gap Conductance Test GC.2-3. Prepared for USNRC, ORES /DRSR by EG&G Idaho, Inc. Contract EY-76-C-07-1570.
Aug. 1978. NTIS.
NUREG/CR-0254. Experiment Data Report for Semiscale MOD 3 Test S-07-4 (REFLOOD Heat Trans-fer Test). Prepared for USNRC, ORES /DRSR by EG&G. FIN A6038. Sept. 1978. NTIS.
NUREG/CR-0257. PWR Blowdown Heat Transfer Separate Effects Program-Thermal Hydraulic Test Facility Experimental Data Report for Test 169.
V. D. Clemons, R. A. Hedrick and M. D.
White. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0125.
Sept. 1978. NTIS.
NUREG/CR-0261. Evaluation of the Plastic Characteristics of Piping Products in Relation to ASME Code Criteria.
E. C. Rodabaugh and S. E. Moore. Prepared for USNRC, ORES /DRSR by Oak Ridge Laboratory. FIN B0123.
Sept. 1978. NTIS.
NUREG/CR-0263. Debris Bed Studies and Experiments at Sandia Laboratories.
J. B. Rivard.
Prepared for USNRC, ORES /DRSR by Sandia Laboratory. FIN A1181. Oct. 1978. NTIS.
NUREG/CR-0264. Fluid Structure Response of a Pressurized Water Reactor Core Barrel During Blowdown. Prepared for USNRC, ORES /DRSR by Los Alamos Laboratory. Contract W-7405-ENG-36.
Sept. 1978. NTIS.
NUREG/CR-0266. Transportation of Radioactive Materials in South Carolina. Prepared for USNRC, OSP by South Carolina Dept. of Health and Environmental Control. Contract NRC-06-77-020.
Sept. 1978. NTIS.
NUREG/CR-0267. Fuel Rod Temperature and Pressure Response in Holden Reactor Experiment IFA 226.
P. E. Mcdonald. Prepared for USNRC, ORES /DRSR by EG&G. FIN A6046. Sept. 1978.
NTIS.
NUREG/CR-0269. Light Water Reactor Fuel Response During Reactivity Initiated Accident Experiments.
T. Fujishiro and others. Prepared for USNRC, ORES /DRSR by EG&G. Contract EY-76-C-07-1570.
Sept. 1978. NTIS.
NUREG/CR-0269. ERRATA. Sept. 19)o.
NUREG/CR-0270. Development of the LOFT Prototype Drag Screen-Transient Steam-Water Testing.
J. R. Fineke. Prepared for USNRC, ORES /DRSR by EG&G. Contract EY-76-C-07-1570.
Aug.
19/8. NTIS.
NUREG/CR-0272. PWR Blowdown Heat Transfer Separate-Effects Program -Thermal-Hydraulic Test Facility Experimental Data Report for Test IS4R.
G. S. Massengill, R. A. Hendrick, and M. D. White. Prepared for USNRC ORES /DRSR by Oak Ridge National Laboratory. FIN B0215.
Oct. 1978. NTIS.
NUREG/CR-0273. PWR Blowdown Heat Transfer Separate-Effects Program -Thermal-Hydraulic Test Facility Experimental Data Report for Test 156.
G. S. Massengill, R. A. Hen'irick, and M. D. White. Prepared for USNRC ORES /DRSR by Oak Ridge National Laboratory. FIN B0215. Oct. 1978. NTIS.
NUREG/CR-0277. Stear Generator Tube Integrity Program Annual Progress.
M. Vagins and others. Prepared for USNRC, ORES /DRSR by Battelle Pacific Northwest Laboratory. FIN B2097.
Aug. 1978. 137 pp.
NT;S.
NUREG/CR-0278. PWR Blowdown Heat Transfer Separate-Effects Program -Thermal-Hydraulic Test Facility Experimental Data Report for Test 153.
G. S. Massengill, R. A. Hendrick, and M. D. White. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0215.
Oct. 1978. NTIS.
NUREG/CR-0279. PWR Blowdown Heat Transfer Separate-Effects Program -Thermal-Hydraulic Test Facility Experimental Data Report for Test 155.
G. S. Massengill, R. A. Hcndrick, and M. D. White. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0215.
Oct. 1978. NTIS.
1771 024
NUREG/CR-0280. PWR Blowdown Heat Transfer Separate-Effects Program -Thermal-Hydraulic Test Facility Experimental Data Report for Test 157.
G. S. Massengill, R. A. Hendrick, and M. D. White. Prepared for USNRC ORES /DRSR by Oak Ridge National Laboratory. FIN B0215. Oct. 1978. NTIS.
NUREG/CR-0281. Experiment Data Report for Semiscale MOL 3 Test S-07-1 (Blowdown Heat Transfer).
B. L. Collins and others. Prepared for USNRC, ORES /DRSR by E&G Idaho, Inc.
Contract EY-76-C-07-1570. Oct. 1978. NTIS.
NUREG/CR-0282. Pellet-Cladding Mechanical Interaction in Halden Assembly IFA-226.
D. E.
Owen. Prepared for USNRC, ORES /DRSR by E&G Idaho, Inc. Contract EY-76-C-07-1570.
Aug. 1978. NTIS.
NUREG/CR-0284. An Aluminum-Zircaloy Galvanic Couple in Reactor Water.
R. M. Horton and others. Prepared for USNRC, ORES /DRSR by E&G Idaho, Inc. Contract EY-76-C-07-1570.
Sept. 1978. NTIS.
NUREC/CR-0286. Transportation of Radioactive Material in Pennsylvania. Prepared for USNRC, OSP by Department of Environmental Resources Commonwealth of Pennsylvania. Contract AT(49-24)-0371. Sept. 1978. NTIS.
NUREG/CR-0287. Experimental Investigation of Aerosol Behavior in a Post-Accident Reactor Containment.
- 1. Wegrzyn and D. T. Shaw. Prepared for USNRC, ORES /DRSR by State Uni-versity of New York at Buffalo. Contract AT(49-24)-0359. Aug. 1978. 34 pp.
NTIS.
NUREG/CR-0288. Program for Field Validation of the Synthetic Aperture Focusing Technique for Ultrasonic Testing (SAFT UF).
J. L. Jackson. Prepared for USNRC, ORES /DRSR by Snuthwest Research Institute. Contract NRC-04-77-145. Aug. 1978. 50 pp.
NTIS.
NUREG/CR-0289. Measurements and Standards for Nuclear Material Safeguards.
T. Yolken and F. Jones. Prepared for the USNRC, ORES /DSAFER by National Bureau of Standards.
Contract AT(49-25)-9009. Sept. 1978. NTIS.
NUREG/CR-0290. Program for Field Validation of the Synthetic Aperture Focusing Technique for Ultrasonic Testing (SAFT UT) Midyear Progress Report.
J. L. Jackson. Prepared for USNRC, ORES /DRSR by Southwest Research Institute. Contract NRC-04-77-017.
Sept.
1978. NTIS.
NUREG/CR-0292. Experimental Data Report for Test PCM-1 Power Cooling-Mismatch Test Series.
D. Thornton. Prepared for U N C ORES /DRSR By EG&G. Contract tY-/b-C-U/-1570.
Nov.
1978. NTIS.
NUREG/CR-0294. A Revised and Augmented List of Earthquake Intensities for Kansas, 1867 to 1977.
F. W. Wilson and S. M. DuBois. Prepar i for USNRC, ORES /DRSR by Kansas Geological Survey. Contract NRC-04-77-017. Sept. 1978. NTIS.
NUREG/CR-0295. A Method of Generating Multigroup Transfer Matrices Using an Analytic Angular Integration Free of Truncation Error.
J. A. Bucholz. Prepared for USNRC, ONMSS/DFC by Oak Ridge National Laboratory. FIN B0009. Oct. 1978. NTIS.
NUREG/CR-0296. Safeguards Au amatic Facility Evaluation (SAFE) Methodology. Prepared for USNRC, ORES /DSAFER by Sandia Laboratory. Oct. 1978. NTIS.
NUREG/CR-0297. Reference Critical Experiments Quarterly Progress Report April-June 1978.
B. B. Ernst, I. Oh, and G. Tuck. Prepared for USNRC ORES /DSAFER by Rockwell International. FIN A1036. Oct. 1978. 36 pp.
NTIS.
NUREG/CR-0298. The Controllable Unit Approach to Material Control: Applications to a High Through-Put Mixed 0xide Process. Prepared for USNRC, OSD by Monsanto Corporation FIN A10578. Sept. 1978. NTIS.
NUREG/CR-0304. Mixing of Radiolytic Hydrogen Generated within a Containment Compartment following a LOCA. Willcutt, Gordon, J.E. and Gido, R. G.
Prepared for USNRC, ORES /DRSR by Los Alamos Labs. Contract W-7405-ENG-36.
Aug. 1978. NTIS.
1771 025 m.
NUREG/CR-0305. Integral Decay-Heat Measurements and Comparison to End F/b-IV and V.
T. R.
England, R. E. Schenter and F. Schmittrotn. Prepared for USNRC, ORES / DSAFER by Los Alamos Scientific Laboratory. FIN A7012.
Nov. 1978. NTIS.
NUREG 'cR-0306.
Reactor Primary Coolant System Pipe Rupture Study Method for Detection of Sensitization in Stainless Steel. Progress Report 43 - Jan. to March 1978.
W.
L. Clark. Prepared for USNRC, ORES /DRSR by General Electric Company. Contract NRC-04-75-202.
Sept. 1978. 36 pp.
NTIS.
NUREG/CR-0308. Preliminary Screening of Alternative Methods for the Disposal of Low-Level Waste. Prepared for USNRC, ONMSS/DFC by Ford, Bacon & Davis.
NRC-02-77-168.
Nov.
1978. NTIS.
NUREG/CR-0309. Test of Six-Inch Thick Pressure Vessels, Series 3, Intermediate Test Vessel V-78.
R. H. Bryan, and others. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0119. Dec. 1978. NTIS.
NUREG/CR-0311. Ground-Water Elements of In-Situ Leach Mining of Uranium.
W. E. Thompson and others. Prepared for USNRC, ONMSS/DFC by Geraghty & Miller, Inc. Cont,act NRC-02-77-187.
Aug. 1978. 194 pp.
NTIS.
NUREG/CR-0313. Reactor Safeguards Syster-Assessment and Design, Volume 1.
G. B. Varnado and others. Prepared for USNRC, ORES /DSAFER by Sandia Laboratories. Contract AT(29-1)-789. Aug. 1978. NTIS.
NUREG/CR-0316. Reactor Safety Research Programs Quarterly Report April-June 1978.
K. Ashok, and others. Prepared for USNRC, ORES /DRSR by Brookhaven National Laboratory. FIN Nos.
A3024, A3045, A3041, A3208, A3016, A3014, A3028. Dec. 1978. NTIS.
NUREG/CR-0317. Transuranic Element Transport Agricultural Systems (Soil to Food Chain Transfer of Nuclear Fuel Cycle Radionuclides). Quarterly Progress Report, May - June 1978.
A. Wallacc and others. Prepared for USNRC, ONRR/ DSAFER by University of Cali-fornia at Los Angeles. FIN 3027-6. Oct. 1978. 16 pp.
NTIS.
NUREG/CR-0318. Data Report for the NRC/PNL Halden Assembly IFA-431.
C. R. Hann and others.
Prepared for USNRC, ORES /DRSR by Battelle Pacific Northwest Laboratory. Contract EY-76-C-06-1830.
Sept. 1978. NTIS.
NUREG/CR-0319. Light Water Reactor Safety Research Program Quarterly Report July - Sept.
1977.
D. A. Dahlgren. Prepared for USNRC, ORES /DSAFER by Sandia Laboratories. Contract AT(29-1)-789.
Aug. 1978. NTIS.
NUREG/CR-0320. Stored Energy Calculation: The State of the Art.
M. E. Cunningham and others. Prepared for USNRC, ORES /DRSR by Battelle Pacific Northwest Laboratory.
Contract EY-76-C-06-1830.
Aug. 1978. NTIS.
NUREG/CR-0321. The Origin of Surface Lineaments In Nemaha County, Kansas. Prepared for USNRC, ORES /DRSR by Kansas Geological Survey. Contract NRC-04-77-017.
Sept. 1978.
NTIS.
NUREG/CR-0325. Relevance of Fatigue to Cold Leg Piping. M. E. Mayfield, E. C. Rudabaugh, and R. J. Eiber. Prepared for USNRC, ORES /DSAFER by Battelle Columbus Laboratory.
Contract NRC-04-76293-03. Sept. 1978. NTlS.
NUREG/CR-0326. Document Control and Information Processing Research at the Nuclear Regulatory Commission. Prepared for USNRC. OEDO by H. McNeill. Contract AT-(49-24)-1183.
Nov. 1978. NTIS.
NUREG/CR-0328. Executive Summary Integrated Safeguard Information System (ISIS). Prepared for USNRC, ORES /DSAFER by Boeing Computer Services. Contract NRC-04-77-065.
Sept.
1978. NTIS.
NUREG/CR-0333. Cost / Benefit Analysis of the Integrated Safeguards Information System (ISIS)
Alternatives.
R. Simosen and others. Prepared for USNRC, ORES / DSAFER by Boeing Computer Services. Contract NRC-04-77-065.
Sept. 1978. NTIS. "1771 026
l NUREG/CR-0336. Radionuclide Update by Plants.
H. Nishita, A. Wallace, and E. M. Romney.
Prepared for USNRC, ORES /DSAFER by UCLA. Contract NRC-60-76-103. Sept. 1978. NTIS.
NUREG/CR-0339. LMFBR Safety Review of Current Issues and Bibliography of Literature (1977).
J. R. Buchanan and G. W. Keilholtz. Prepared for USNRC, ORES /DRSR by Oak Ridge Na-tional Laboratory. FIN B0126. Oct. 1978. NTIS.
NUREG/CR-0340. LMFBR Aerosol Release and Transport Program Quarterly Progress Report for April-June 1978.
T. 5. Kress. Prepared for USNRC, ORES /DRSR by Oak Ridgc National Laboratory. FIN B0121. Oct. 1978. NTIS.
NUREG/CR-0346. Development and Verification of Fire Tests for Cable Systems and System Components.
L. J. Przbyla and W. J. Christian. Prepared for USNRC, ORES /DRSR by Underwriters Laboratory. Contract NRC-04-77-122.
Oct. 1978. 64 pp.
NTIS.
NUREG/CR-0347. OTOCI Orinc to Cobra Interface.
S. B. Cliff. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0125. Oct. 1978. NTIS.
NUREG/CR-0349. Calorimetric Fission Product Decay Heat Measurements for 239 PU, 233U, and 235U.
J. L. Yarnell, and P. J. Brendt. Prepared for USNRC, ORES / DRSR by Los Alamos Laboratory. Contract W-7405-ENG-36.
Dec. 1978. NTIS.
NUREG/CR-0351. Microstructural Evaluation and Non-Destructive Examination of 2.25 G-1 Mo Steel Subjected to Elevated Temperature Creep and Fatigue Damage.
J. A. Van Den Avyle, W. B. Jones, and J. H. Gieske. Prepared for USNFC, ORES /DRSR by Sandia Laboratory.
NUREG/CR-0352. An Analysis of the Methods 'jtilized in Oxide-3.
J. Skalyo, Jr., L. G Epel, and C. Sastre. Prepared for USNRC, uRES/DRSR by Brookhaven National Laboratory.
Contract EY-76-C-02-0016.
Oct. 1978. NTIS.
NUREG/CR-0353. Reactor Safety Research Programs Quarterly Progress Report Jan. - March 1978.
A. J. Romano. Prepared for USNRC, ORES /DRSR by Brookhaven National Laboratory.
Contract EY-76-C-02-0016.
Sept. 1978. NTIS.
O NUREG/CR-0354. An Analysis of SORS: A Computer Program for Analyzing Fission Prodr+.
Release from HTGR Cores During Transient Temperature Excursions.
J. M Dickey. Pre-pared for USNRC, ORES /DRSR by Brookhaven National Laboratory. Contract EY-76-C-02-0016.
Sept. 1978. NTIS.
NUREG/CR-0355. REMEP Relap Plot / Restart Tape Merge Program.
S.B. Cliff. Prepared for USNRC, OPES /DRSR by Oak Ridge National Labnratory. FIN B0125. Sept. 1978. NTIS.
NUREG/CR-0357. Transition Boiling Heat Transfer in Forced Vertical Flow. Final Report June 1977-June 1978.
S. C. Cheng, and others. Prepared for USNRC, ORES /DRSR by Argonne National Laboratory. FIN A2014. Dec. 1978. NTIS.
NUREG/CR-0358. Vol. 1.
Proceedings of the Japan-U.S. Seminar on HTGR ufety Technology.
Prepared for USNRC, ORES /DRSR by Brookhaven National Laboratory. Contract EY-76-C-02-0016.
Sept. 1978. NTIS.
NUREG/CR-0358. Vol. 2.
Sept. 1978. NTIS.
NUREG/CR-0361. Random Vibration of a Nonlinear Two-Degree-of-Freedom Oscillator. Prepared for USNRC, ORES /DRSR by the University of Southern California. Contract NRC-04-76-262.
Oct. 1978. 112 pp.
NTIS.
NUREG/CR-0362. Dynamic Excitation of a Single-Degree-of-Freedom Hysteretic System. Prepared for USNRC, ORES /DRSR by the University of Southern California. Contract NRC-04-76-262.
Oct. 1978. 120 pp.
NTIS.
NUREG/CR-0363. Three Scales of Motions Associated with Tornadoes. Prepared for USNRC, ORES /DRSR by University of Chicago. Contract AT(49-24)-0239. Sept. 1978. NTIS.
O 1771 027
~ 4-
NUREG/CR-0369. Reactor Operating Experiences 1975-1977. Prepared for USNRC, ORES / DRSR by Oak Ridge National Laboratory. FIN B0216. Oct. 1978. NTIS.
NUREG/CR-0370. Quarterly Progress Report on Fission Product Behavior in LWRs for April-June 1978.
A. P. Malinauskas and others. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0127. Sept. 1978. NTIS.
NUREG/CR-0372. Design Criteria for Vault Automation in Special Nuclear Material Storage.
W. T. McDuffee, and others. Prepared for USNRC, OSD/DSHSS by Oak Ridge National Laboratory. FIN B0125. Dec. 1978. NTIS.
NUREG/CR-0375. Experimental Data Report for Test PCM-5 (Power Cooling Test Mismatch Series).
D. E. Thorton, C. L. Zimmerman, and D. H. Schweider. Prepared for USNRC, ORES /DRSR by EG&G, Idaho, Inc. FIN A6041. Dec. 1978. NTIS.
NUREG/CR-0377. A Two-Dimensional Fluid Finite Model. Prepared for USNRC, ONRR/DPM by Massachusetts Institute of Technology. Contract AT-(49-24)-0366.
Nov. 1978. NTIS.
NUREG/CR-0378. PWR Blowdown Heat Transfer Separate-Effects Program-Thermal Hydraulic Test Facility Experimental Data Report for Test 158.
V. D. Clemons, R. A. Hedrick, and M. D. White. Prepared for USNRC, ORES /DSHSS by Oak Ridge National Laboratory. FIN B2015. Dec. 1978. NTIS.
NUREG/CR-0379. Reports Distributed under the NRC Reactor Safety Research Foreign Technical Exchange Program (Jan. - June 1978).
D. S. Queener. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B2015.
Dec. 1978. NTIS.
NUREG/CR-0381. A Preliminary Report on Fire Protection Research Program Fire Barriers and Fire Retardant Coatings Tests. Prepared for USNRC, ORES /DRSR by Sandia Laboratory.
NUREG/CR-0383. Tornado Damage at the Grand Gulf, Miss., Nuclear Power Plant Site: Aerial and Ground Surveys. Prepared for USNRC, ORES /DRSR by Texas Tech University and the University of Chicago. Contracts NRC-04-74-239 and NRC-04-76-345. Oct. 1978. NTIS.
NUREG/CR-0384. Advanced Two-Phase Instrumentation Program Quarterly Progress Report for Jan - March 1978.
K. G. Turage and P. A. Jallouk. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0401.
Nov. 1978. NTIS.
NUREG/CR-0386. An Atmospheric Tritium and Carbon-14 Monitoring System. Prepared for USNRC, ORES /DSAFER by EG&G Idaho Falls. FIN A6075. Oct. 1978. 24 pp.
NTIS.
NUREG/CR-0387. Utility Incentive Systems for Licensees. Prepared for USNRC, 01&E by TRW, Inc. Contract NRC-05-77-053.
Sept. 1978. NTIS.
NUREG/CR-0393. Advanced Reactor Safety Research Program Quarterly Report July - Sept. 1977.
Prepared for USNRC, ORFS/DRSR by Sandia Laboratory. FIN A1016. Sept. 1978. NTIS.
NUREG/CR-0395. Evaluation of Radioactive Iodine Measurement at the Pilgrim Nuclear Power Plant.
C. Pelletier and others. Prepared for USNRC, ONRR/DSE by Science Applications, Inc.
FIN A6075. Oct. 1978. 100 pp.
NTIS.
NUREG/CR-0398. Multirod Burst Test Program Progress Report for April-June 1978.
J.
L. Crowley. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0230. Dec. 1978. NTIS.
NUREG/CR-0399. Evaluation of Fission-Product Afterheat, Quarterly Report, April 1 to June 30, 1978.
B. I. Spinrad. Prepared for USNRC, ORES /DRSR by Oregon State University.
Coatract AT(49-24)-0157. Dec. 1978. 88 pp.
NTIS.
NUREG/CR-0400. Risk Assessment Review Group Report to the Commission.
H. W.
Lewis and others. Prepared for USNRC, OPE by Ad Hoc Risk Assessment Group. Sept. 1978.
Available at NRC.
1771 028
-2.s-
NUREG/CR-0404. The Effects of the Depletion and Buildup of Fissile Nuclides and of 238U Fast Fiss#on on Fission Product Decay Power.
T. J. Trapp, Jr.
Prepared for USNRC, ORES /DRSR by Oregon State University. Contract AT(49-24)-0157. Dec. 1978. 216 pp.
NTIS.
O NUREG/CR-0408. Natural Convection Heat Transfer in Beds of Inductively Heated Particles.
S. J. Rhee and V. K. Dhir. Prepared for USNRC, ORES /DRSR by University of California at Los Angeles. Contract NRC-04-76-246. Oct. 1978. 200 pp.
NTIS.
NUREG/CR-0409. A Study of Droplet Hydrodynamics Important in LOCA Reflood.
R. S. L. Lee and D. S. Azbel. Prepared for USNRC, ORES /DRSR by State University of New York at Stony Brook. Contract NRC-04078-194. Oct. 1978. 44 pp.
NTI3.
NUREG/CR-0411. Bibliography of Reports on Research Sponsored by USNRC, Office of Nuclear Regulatory Research, January - June 1978.
J. R. Buchanan. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0126. Dec. 1978. NTIS.
NUREG/CR-0412. Quarterly Technical Progress Report on Water Reactor Safety Programs Spon-
- ored by the NRC's Division af Reactor Safety Research July-September 1978. Prepared for USNRC, ORES /DRSR by E.G.&G. Idaho, Inc. Various FIN numbers under a variety of programs. Dec. 1978. NTIS.
NUREG/CR-0413. Thorium Residuals in West Chicago, Illinois.
N. A. Frigerio, T. J. Lars and R. S. Stowe. Prepared for USNRC, Ol&E, Region III by Argonne National Laboratory.
FIN A-2071.
Sept. 1978. NTIS.
NUREG/CR ')414.
In Vitro Dissolution of Uranium Product Samples from Four Uranium Mills.
A.
F. Eidson, and J. A. Mewhinney. Prepared for USNRC, ORES /DSAFER by Lovelace Biomedical & Environmental Research Institute. Contract E(29-2)-1013. Dec. 1978. 24 pp.
NTIS.
NUREG/CR-0426. NON-SAP-C: A Nonlinear Stress Analysis Program for Concrete Containments under Static Dynamic and Long Term Loadings.
P. D. Smith, and C. A. Anderson. Pre-pared for USNRC, ORES /DRSR by Los Alamos Laboratory. Contract W-7405-ENG-36. Dec.
1978.
NT'3.
NUREG/CR-0418. Two Phase Flow Phenomena in Nuclear Reactor Technology Quarterly Progress Report March 2-May 31, 1978.
R. T. Lahey, Jr. and others. Prepared for USNRC, ORES /DRSR t,y Rensselaer Polytechnic Institute. Contract NRC-04-76-301.
Dec. 1978.
100 pp.
NTIS.
NUREG/CR-0425. Aerosol Measurements and Modeling for Fast Reactor Safety. Quarterly Pro-gress Report for Jan. - March 1978.
J. A. Gieseke. Prepared for USNRC, ORES /DRSR by Battelle-Columbus Laboratory. Contract NRC-04-76-293-07.
Dec. 1978. 36 pp.
NTIS.
NUREG/CR-0428. Review of Criteria for Packaging Plutonium for Transport by Air. Frepared for USNRC, ONLGS/DFC by National Academy of Sciences. Contract NRC-02-77-004. Oct.
1978. NTIS.
NUREG/CR-0442. Effects of Air Blast on Power Plant Structures and Components.
C. A. Kot and othe:. Prepared for USNRC, OSD/ DES by Argonne National Laboratory. FIN A2006.
Nov. 1978. NTIS.
NUREG/CR-0448. Dynamic Analysis to Establish Normal Shock and Vibration of Radioactive M;.terial Shipping Packages - Quarterly Progress Report April - June 1978.
S. R.
Fields, and S. J. Mech. Prepared for USNRC, ORES /DSAFER by Hanford Engineering Develop-ment Laboratory. Contract NRC-60-16-254 Dec. 1978. 40 pp.
NTIS.
NUREG/CR-0449. An Integrated Geophysical and Geological Study of the Tectonic Framework of the 38th Parallel Lineament in Vicinity of Its Intersection with the Extension of the New Madrid Fault Zone: Annual FY 1978 Report. Prepared for USNRC, ORES /DRSR by Purdue University. Contract AT(49-24)-0323.
Nov. 1978. NTIS.
9 1771 029
NUREG/CR-0450. New Madrid Seismotectonic Study Activities for FY 1978. Prepared for USNRC, ORES /DRSR by Illinois State Geological Su vey. Contract NRC-04-76-204. Nov. 1978.
- NTIS, NUREG/CR-0457. Development of a Laser Doppler Anemometer Technique for the Measurement of Two Phase Dispensed Flow. Prepared for USNRC, ORES /DRSR by SUNY At Stony Brook. FIN B6211. May 1978. NTIS.
NUREG/CR-0460. Development of High-Sensitivity Ultrasonic Techniques for In-Service Inspec-tion of Nuclear Reactors. Prepared for USNRC, ORES /DRSR by National Bureau of Standards.
FIN B5680.
Nov. 1978. NTIS.
NUREG/CR-0461. Inspection of Nuclear Reactor Welding by Acoustic Emission-Final Report.
Prepared for USNRC, ORES /DRSR by Gard, Inc. Contract AT(49-24)-0187. Nov. 1978.
NTIS.
NUREG/CR-0462. Annotated Bibliography of Safety-Related Events in Boiling Water Nuclear Power Plants as Reported in 1977.
R. L. Scott, and R. B. Gallagher. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0126. Dec. 1978. NTIS.
NUREG/CR-0464. Scaling of Pressure and Subcooling for Countercurrent Flow. Prepared for USNRC, ORES /DRSR by CREARE, Inc. Contract NRC-04-75-102. Nov. 1978. HTIS.
NUREG/CR-0466. Annotated Bibliography of Safety-Related Events in Pressurized Water Nuclear Power Plants as Reported in 1977.
R. L. Scott, and R. B. Gallagher. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0126. Dec. 1978. NTIS.
NUREG/CR-0472. An Approximate Method of Elastic-Plastic Fracture Analysis for Nozzle Corner Cracks.
J. G. Merkle. Prepared for USNRC, OSD/ DES by Oak Ridge National Laboratory.
NUREG/CR-0474. Comparison of Simulation Models Used in Assessing the Effects of Power-Plant-Induced Mortality on Fish Populations.
G. L. Swartzman, R. B. Deriso, and C. Cown.
Prepared for USNRC, ORES /DSAFER by the University of Washington. FIN B5679. Dec.
1978. 168 pp.
NTIS.
NUREG/CR-0476. Heavy-Section Steel Technology Program, July - Sept. 1978. Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0119. Dec. 1976. NTIS.
NUREG/CR-0479. Eddy-Current Inspection for Steam Gsnerat;r Tubing Program Quarterly Pro-gress Report for Period Ending June 30, 1978. J V. Dodd, W. E. Deeds and R. W. McClung.
Prepared for USNRC, ORES /DRSR by Oak Ridge National Laboratory. FIN B0147. Dec. 1978.
NTIS.
NUREG/CR-0489. Characterization of Agglomerrtes of U0, Aerosol Particles.
H. Jordan, and J. A. Gieseke. Prepared for USNRC, ORES /DRSR by Battelle-Columbus Laboratories.
Contract NRC-04-76-293-07.
Dec. 1978. 36 pp.
NTIS.
NUREG/CR-0490. The Application of Game Theory to Nuclear Material Accounting. Prepared For USNRC, ONMSS/DSG by Lawrence Berkeley Laboratory. Contract W-7405-ENG-48. Nov. 1978.
NTIS.
NUREG/CR-0515. Methods of Accountability of Reprocessing Plant Dissolver and Waste Solu-tions.
F. B. Stephens, R. G. Gutmacher, and K. Ernst. Prepared for USNRC, OSD/DSHSS by Lawrence Livermore Laboratory. Contract TA-02-20-04.
Dec. 1978. 140 pp.
NTIS.
NUREG/CR-0518. Critical Experiments, Measu=>ments and Analyses to Establish a Cra k Arrest Methodology for Nuclear Pressure Vessel Steels.
G. T. Hahn, and others. Prepared for USNRC, ORES /DRSR by Battelle-Columbus Laboratory. Contract AT(49-24)-0293. Dec. 1978.
80 pp.
NTIS.
NUREG/CR-0526. Steam-Water Mixing and System Hydrodynamics Program-Task 4-Quarterly Report April - June 1978.
R. P. Collier, and others. Prepared for USNRC, ORES /DRSR by Battelle Columbus Laboratories. Contract NRC-04-76-293-04 Dec. 1978. 100 pp.
NTIS.
1771 030 27
NUREG/CR-0533. Measurements and Standards for Nuclear Materials Safeguards - May 1978 to September 1978.
H. T. Yolken, and F. E. Jones. Prepared for USNRC, ORES /DSAFER by the National Bureau of Standards. Contract AT(49-25)-9009. Dec. 1978. 32 pp.
NTIS.
NUREG/CR-0542. Photoelastic Studies of Crack Propagation and Arrest in Polymers and 4340 Steel.
G. R. Irwin, and o'.ers.
Prepared for USNRC, ORES /095R by the University of Maryland. Contract NRC-C,-76-172.
Dec. 1978. 328 pp.
NTIS.
NUREG/CR-0567. Reactor Primary Coolant System Pipe Rupture Study. Method for Detection of Sensitization in Stainless Steel. Progrees Report 44-April - June 1978.
W. L. Clark.
Prepared for USNRC, ORES /DRSR by General t1ectric Company. Contract NRC-04-75-202.
Dec. 1978. 36 pp.
NTIS.
NUWEG/CR-0582. Evaluating Strength and Ductility of Irradiated Zircaloy - Task 5.
L. M. Lowry, and others. Prepared for USNRC, ORES /0RSR by Battelle-Columbus Labora-tory. FIN A4068. Dec. 1978. '36 pp.
NTIS.
O e
h